A swim spa quotation is easy to compare on price and almost impossible to compare on substance. Two proposals can carry the same model code, the same shell size and a similar jet count, yet differ in real cost once pumps, controls, filtration, insulation and freight are read line by line. This guide uses our Outdoor Swim Spa WS-125AⅣ-U as the worked example, because it sits in the middle of a range where small specification changes move the price a great deal. Use the same checklist for any supplier you are evaluating.
Start With the Shell Dimensions, Not the Jet Count
Jet counts sell products; dimensions decide whether the unit fits your site. The catalogue entry for WS-125AⅣ-U lists 5500 × 2300 × 1350 mm. Before you compare a single option, confirm three measurements against your drawings:
- Footprint on the finished surface. The spa sits on a slab or deck; the shell length and width must clear paving edges, planters, balustrades and drainage falls.
- Water depth of 1350 mm. This governs usable swim and hydrotherapy depth, seat height and how the coping or step detail is resolved at the perimeter.
- Access route to the position. A 5.5 m module needs a delivery path, a crane or tilt-blade route, and clear headroom if it passes under a canopy or through a gate.
Ask each supplier to state dimensions in the same notation you use on site drawings, and to say whether the figure is the shell, the frame envelope or the envelope including steps and coping. Suppliers who answer with one number and no explanation are the ones whose proposals later grow an extra line item.
Read the Pump and Jet Schedule Line by Line
The published specification for WS-125AⅣ-U lists 4 water pumps, 1 filter pump, a total of 23 jets, 1 LED light and a total power figure of 11.85 kW. That combination tells you more about the machine than a marketing sentence about "powerful massage" ever will.
When you compare proposals, put the pump schedule into one table for all bids:
| Specification line | What to record from each proposal | Why it changes the price |
|---|---|---|
| Water pumps (quantity) | Number of pumps and what each one drives: jets, swim current, a dedicated seat circuit | Each additional pump adds equipment cost, an electrical circuit and long-term service access |
| Filter pump | Whether it is separate from the jet pumps, and the filtration path it serves | A shared pump means jets and filtration compete; a dedicated pump changes run hours and energy use |
| Jet total | Total count plus the split between body jets, seating jets and any directional or adjustable jets | Twenty-three jets spread across four pumps behaves differently from twenty-three on two |
| Total power | The kW figure quoted for the exact option set, not the base unit | This is the number your electrician and your operating cost estimate depend on |
| Lighting | Fitting count and where they are located in the shell | Fixture count affects both the quote and the ambience of an evening swim |
Our own range shows why this matters inside one model family. The Outdoor Swim Spa WS-125AⅣ shares the same catalogue shell size of 5500 × 2300 × 1350 mm, but its published schedule differs: 1 water pump rather than 4, 20 jets rather than 23, 3 LED lights rather than 1, a swim training system listed as included, and a total power figure of 8.05 kW against 11.85 kW. Same footprint, two very different machines. If you compare only the model code and the price, you will not see which machine you are buying.
Confirm Which Features Are Standard and Which Are Options
The WS-125AⅣ-U page shows water jets, LED lighting and ozone as the features presented for that configuration. The catalogue also lists optional accessories across the swim spa range, including control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option named in a brochure is not automatically available on your unit.
For every proposal, ask for three separate columns:
- Included as standard on the quoted model code.
- Optional and priced, with the surcharge shown separately.
- Not available on this model at all.
This is where most quotations diverge. A heat pump and additional insulation can be the difference between a spa that runs comfortably in a cool season and one that only earns its keep in summer. If one bid includes insulation and another does not, you are not comparing two prices; you are comparing two products.
Ask for the Electrical and Plant Room Scope in Writing
A total power figure of 11.85 kW is a design input, not an installation quote. Before you accept a proposal, get written answers on:
- Supply requirements: phase, circuit count and protection for the exact option set quoted.
- Where the control system sits, how it is accessed for service, and whether it needs a sheltered position.
- Filtration and any sand filtration option: footprint, backhaul route and drainage.
- Who supplies and installs the isolator, cabling and trunking — the spa supplier or your electrical contractor.
Comparing proposals only becomes useful once each bidder has answered the same scope questions. A cheaper number that leaves the electrical work undefined is usually not cheaper after your contractor prices it.
Compare What Arrives on Site, Not Just What Ships
A swim spa is a heavy module crossing an ocean, and the freight line in a proposal carries as much risk as the equipment list. We handle furniture logistics and door-to-door delivery for project shipments, which means the paperwork is part of the deliverable: commercial invoice, packing list, certificate of origin, container loading plan and shipment tracking. Ask every supplier to state:
- The Incoterm and what it covers — port only, or all the way to your site.
- Packaging method and whether the module is crated for a crane or tilt-blade offload.
- Who handles customs clearance and import documentation in your country.
- What is inspected at handover and how damage claims are raised.
Then do the same for commissioning. Our furniture installation and after-sales support service covers on-site installation, inspection with a snag list, warranty coverage, spare parts and ongoing maintenance. For a swim spa, ask specifically who fills, levels, commissions and tests the jets and controls, and what happens when a pump or control board needs attention later on.
Evaluate Samples and Evidence Before You Sign
You cannot sample a spa shell in a showroom the way you sample a fabric, but you can demand evidence. For any swim spa supplier, including us, ask for:
- A dimensioned drawing of the exact model code, with access panels and equipment locations marked.
- The specification sheet for the quoted configuration, not the range overview.
- Photographs or a site report from an installed unit of the same series.
- A written list of standard inclusions versus priced options versus unavailable items.
- Contact details for a project where the same series has been installed and in use.
A supplier who provides all five is inviting you to compare like with like. A supplier who gives you a price and a brochure is asking you to guess.
Put Every Bid Into One Scored Sheet
Build one comparison sheet with the same rows for every bidder: shell dimensions, water depth, pump schedule, jet count and layout, lighting count, total power, standard inclusions, priced options, unavailable items, electrical scope, freight terms, installation and commissioning responsibility, warranty terms, spare-parts supply and lead time. Score each row as included, optional at a stated price or not addressed. The bid that looks cheapest almost always has the most "not addressed" cells.
That sheet also becomes your procurement record if you are furnishing a villa or hotel package where the spa is one line among many. Coordinating outdoor water features with outdoor furniture for villas and resorts — loungers, pergolas, hardtop gazebos and shade structures — is far easier when one supplier carries the whole terrace schedule under a single delivery and installation plan. Our turnkey interior project solutions cover that coordination from design and material selection through production, logistics and handover.
The Practical Test for Any Swim Spa Proposal
Can you point to a written line in the proposal for every number on this page — 5500 × 2300 × 1350 mm, 4 water pumps, 1 filter pump, 23 jets, 1 LED light, 11.85 kW — and can you say what each one costs you to install and to run? If any answer is missing, the comparison is not finished.