A high gloss acrylic kitchen can look identical on a rendering and behave very differently on site. The difference is rarely the lacquer. It is the information handed to the factory before cutting starts. If you are sourcing cabinetry from a China furniture and building materials manufacturer for a villa, apartment or hospitality fit-out, the quality of your measurement pack and project brief decides whether the quotation is accurate, whether the panels fit first time, and whether the gloss finish reads as intended under your own lighting.

This guide sets out the measurements, drawings and decisions a manufacturer needs to quote and build High Gloss Acrylic Cabinets, and what happens on site when each item is missing.

Why High Gloss Acrylic Rewards Accurate Information

Gloss surfaces are unforgiving. Every reflected light source, every shadow line and every joint between panel and wall is amplified. Three practical consequences follow for procurement:

  • Out-of-square walls show up as wedges. A gap of a few millimetres across a run that would disappear behind a textured matte door becomes a visible taper beside a mirror-like panel.
  • Panel size affects appearance, not just price. Wide door fronts reduce visual breaks across a wall, but they change hardware loads, the need for integrated handles and how a door behaves over years of use. Our product pages state made-to-measure sizing, material and finish options and a layout tailored to each project, with dimensions and selected specifications confirmed per project — so panel widths are a decision you make, not a catalogue limit.
  • Cut-to-size work has no undo. Acrylic-faced panels are produced for the opening you declared. A late change is a re-made panel and a re-booked container, not a trim on site.

The same logic applies across collections in the range, from Matte Acrylic Cabinets to Handleless High Gloss Cabinets. The finish changes the look; the accuracy of your inputs changes the result.

The Measurement Pack: What to Send and Why It Matters

Send drawings, not a single photograph. For each kitchen or wet-area run, provide the following. Where an item does not apply, say so explicitly instead of leaving it blank — silence is usually read as "no constraint".

InputHow to record itWhat it controls
Overall run length, wall by wallFinished-wall to finished-wall, in millimetres, measured at three heights and reported as the smallest, middle and largest figureCabinet case widths, filler panels, whether scribe cuts are needed
Room height and ceiling lineFloor finish level to ceiling, plus soffit or bulkhead depths and their positions along the runTall unit heights, top panel strategy, whether cabinets run to ceiling
Out-of-plumb and out-of-square readingsVariation across each wall in millimetres, with the high and low points marked on the sketchScribe widths, filler sizes, sight lines on a gloss run
Door and window openingsReveal width, head height, sill depth, opening direction and handle clearanceWhere a run must stop, corner returns, appliance access routes
Services positionsWater in and out, waste, gas, power outlets, switch plates — each measured from two fixed reference walls, not from the previous cabinetBack panel cut-outs, ventilation gaps, appliance housing depths
Appliance scheduleModel numbers with cut-in width, height and depth, door swing direction, venting requirementHousing dimensions, trim kits, whether an integrated panel is required
Sink and tap specificationBowl type (undermount, top mount, farmhouse), bowl dimensions, tap hole count, waste typeBase unit width, sink base construction, worktop cut-out template
Worktop thickness and materialThickness in millimetres plus material, with edge profile if selectedWall cabinet height offset, splashback height, load support at the run ends
Corner and return conditionsInside or outside corner, radius if curved, obstruction within 300 mm of the cornerCorner unit type, door hinge type, accessible storage depth
Floor finish build-upFinished floor level relative to structural slab, including any plinth or toe-kick recessLevelling leg range, plinth depth, appliance alignment

Two rules keep this pack usable across a distance. Measure in millimetres throughout, and record every figure against the same two or three named reference walls so the factory can reconstruct your room rather than guess it. If a site is still in structure, mark clearly which surfaces are final finishes and which are substrate — a screed or plaster build-up of 25 mm at each end of a run removes 50 mm from what you measured.

Before anything else goes into the pack: state who is doing the on-site measuring. If your local contractor takes the final site dimensions after our drawings are prepared, that re-measure step belongs in the programme and in the responsibility split, not in an email three weeks before shipment.

Project Inputs That Shape the Quote, Not Just the Drawing

Measurements define what fits. The next set of inputs defines what is made, how many are made and how they arrive.

1. Unit count and repetition

Send a schedule: number of kitchens or bathrooms per unit type, number of repeating unit types, and total quantities. A single villa kitchen and forty identical apartment kitchens need the same measurement discipline but produce different build strategies — repeated runs let hardware, panel nesting and packing be optimised once.

2. Finish decision inside the acrylic range

Acrylic fronts are specified by colour or effect and by surface treatment. Gloss and matte behave differently under the same lighting, so decide with samples on site rather than from a screen. The range includes Solid Color Acrylic Cabinets for flat single-colour fronts and Two Tone Acrylic Cabinets where upper and lower fronts differ. Tell us which surfaces are to match exactly across rooms, because matching is easier to guarantee when it is decided before production batches are set.

3. Door style and opening method

Hinged, sliding or handleless front — each changes the clearance you must leave beside an appliance, the pull-out space in front of a run, and whether an integrated profile is required. For a handleless look, confirm how the door is opened at each position: profile, recessed channel or push mechanism.

4. Interior configuration

List what goes inside each unit: drawers versus shelves, pull-out larder racking, corner mechanisms, integrated bins, cutlery organisation, lighting in tall units. Interior fittings are the most commonly changed item after a quotation is issued, and they are the easiest to lock down early.

5. Substrate and application context

State where each unit is installed — residential kitchen, apartment kitchen, utility, bathroom, hospitality back-of-house. Moisture load, cleaning regime and traffic all influence the board and edge specification we propose with your front finish.

6. Delivery and access information

Give the delivery address, the receiving party, lift dimensions, stair widths, and any maximum panel size that can physically reach the room. A tall gloss door that will not turn a landing corner has to be re-specified as a two-piece assembly, which is a design change, not a delivery note. We arrange freight and door-to-door delivery, so access constraints belong in the pack from the start.

7. Programme dates

Give the required site date and work backwards to a specification sign-off date. Production cannot begin on an unconfirmed drawing, and gloss fronts are made for one project.

How These Inputs Move Through a Custom Order

SANTERSON works as a one-stop furniture and building materials supplier, so cabinetry is usually coordinated alongside flooring, wall finishes, doors, lighting and sanitaryware for the same project. The workflow that applies to a made-to-measure cabinet order:

  1. Brief and drawings. Your measurement pack and schedule come back as layout drawings and elevations with dimensions marked.
  2. Quotation and detail confirmation. Panel sizes, colours, hardware, interior fittings and packing are confirmed in writing. This is the point at which changes are cheap.
  3. Production and quality control. Panels are cut, faced and edged to the confirmed dimensions; finishes are checked against the approved sample reference.
  4. Packing and shipment. Panel sets are packed by room and run so that installation follows the drawings rather than a sorting exercise on site.
  5. Delivery, installation support and after-sales. Site coordination, snag inspection and spare parts follow the scope agreed for your project — see installation and after-sales support.

Where a project needs non-standard sizes, brand marking or its own hardware detail, that is handled through the same channel as custom and OEM manufacturing. The practical requirement is identical: dimensioned drawings signed off before cutting.

Common Specification Mistakes We See on Gloss Kitchen Orders

  • Measurements taken before the final floor and wall finishes. The run shrinks once plaster and screed are in. Take site dimensions after wet trades, or state the build-up allowances you are assuming.
  • Appliance models named but not fixed. A substitution of 20 mm in cut-in depth changes a housing, a worktop and a splashback.
  • One colour reference used for different light conditions. Gloss reads differently in north-facing daylight than under downlights. Confirm the sample against the actual lighting design.
  • Tall units drawn without checking the access route. Panel size limits are set by your stairwell and lift, not only by the room.
  • Interior fittings left open at order. The cheapest change is the one made before production, so decide drawers, racking and bins at drawing stage.

A Short Pre-Order Checklist

  • Ten measurements per run, in millimetres, against named reference walls
  • Out-of-plumb readings and finished floor levels recorded
  • Appliance schedule with model numbers and cut-in dimensions
  • Sink, tap and worktop specification including thickness
  • Unit count and repeating unit types for the whole project
  • Colour and surface confirmed from physical samples on site
  • Interior configuration listed unit by unit
  • Delivery access limits: lift, stair, maximum panel size
  • Specification sign-off date set against the required site date
  • Responsibility for final site re-measure named in writing

If you can supply these nine inputs, a quotation for high gloss acrylic cabinetry and the rest of the joinery package can be prepared on real dimensions rather than assumptions. Send your drawings and schedule with the project location and required site date, and we will return elevations, a specification sheet and pricing for review before anything enters production.

Send your measurement pack

Share your dimensioned drawings, appliance schedule and finish references for the kitchen or joinery package on your project. We will mark up the elevations, flag any site conditions that affect a gloss run, and confirm dimensions and selected specifications with you before production begins.