A swim spa of this size is not a catalogue item you simply drop into a container. It crosses an ocean, sits on a prepared base for years, and carries pumps, jets, lighting and controls that must match the power supply at the site. Before production starts on Outdoor Swim Spa WS-PC08ST, a handful of decisions shape everything that follows: the shell size, the equipment inside the cabinet, the electrical arrangement, and how the unit reaches your site. Confirming them on paper in week one is far cheaper than correcting them after the acrylic shell has been formed.
The checklist below follows the order we work in as a one-stop furniture and building materials supplier, from specification through to handover, so that buyers, builders and project managers can see exactly what needs sign-off at each stage.
Start With the Shell: What the Catalogue Shows for WS-PC08ST
WS-PC08ST belongs to our configurable outdoor swim and hydrotherapy range. The published catalogue entry lists a shell of 8000 mm long, 2400 mm wide and 1470 mm deep, with one control system, one swim training system, one filter pump, six water jets and four LED lights. Those figures are the reference point for a quotation, not a fixed order. A neighbouring variant in the same family, Outdoor Swim Spa WS-PC08ST-L, is listed at 8490 mm long with the same width and depth, which shows how length can be adjusted when the site allows it.
Before any drawing is released, ask us to restate the dimensions in writing for your chosen configuration, including the shell depth relative to the finished deck level. Depth matters twice over: it sets water volume, and it determines whether adults can stand comfortably in the hydrotherapy end or whether the unit reads as a shallow plunge.
Confirm the Swim End Before the Jet Package
The WS-PC08ST catalogue entry shows a swim training system as standard equipment, and that single item drives most other choices. A swim current is what makes an 8-metre shell a lap pool rather than a long bath, so decide first how the spa will actually be used: daily swimming against a current, hydrotherapy and massage, or family leisure with occasional exercise.
- Swim training: confirm the type of current, its adjustable range, and whether you want resistance accessories for training sessions.
- Hydrotherapy jets: six jets are listed for this model. Agree on jet placement against the seating and lounging positions, because jet layout is fixed once the shell is moulded.
- Water treatment: ozone is shown in the catalogue specification; UV sterilisation is an option on this range. State which one you want quoted, and whether you intend to run it continuously.
- Lighting: four LED fittings are listed. Confirm colour options and where they sit relative to windows or seating.
Electrical Supply: The Item Most Often Left Too Late
The catalogue records a total power figure for the WS-PC08ST configuration shown, and the water pump is not listed as a fixed quantity on that page because it depends on the selected setup. Treat both as indicative rather than as an order specification. Before production we need written confirmation from you or your electrician covering:
| Point to confirm | Why it changes the build |
|---|---|
| Supply voltage and phase (single-phase or three-phase) | Pump and heater selection differ; wrong phase means equipment swap after shipping. |
| Available circuit capacity and dedicated protection | Determines whether pumps and heat pump can run together as designed. |
| Heating method chosen (heat pump, or none) | A heat pump changes both power draw and cabinet layout. |
| Location of the control panel and access route | Service access must survive the finished deck and landscaping. |
| Local wiring rules to be met by the site electrician | We build to the supply you confirm; on-site compliance is handled locally. |
Power figures published in a catalogue describe one configuration. Always request the specification sheet for the exact build being quoted, and have your electrician sign it off before production begins.
Options That Must Be Decided Before Production
The optional equipment listed for this range is where a standard shell becomes a spa suited to a specific climate and routine. Each option below has to be on the purchase order before the shell and cabinet are assembled, because retrofits after production are rarely possible at a reasonable cost.
- Heat pump: the deciding factor for year-round use in cooler climates; it also changes the power budget.
- Insulation package: shell and cabinet insulation reduces running cost and protects the unit through cold nights.
- Filtration: the catalogue shows one filter pump; sand filtration is an option on this range. Choose the maintenance routine you can actually keep to.
- Steps and access: integrated steps or a ladder affect the deck layout and how children enter the water.
- Control system upgrade: confirm the interface, display location and whether remote control is required.
- UV sterilisation: decide alongside ozone so water treatment is specified once, not twice.
Site Preparation and Delivery: Agree These in Parallel
An 8-metre spa arrives as a single fabricated shell, which means the base, clearance and route to the position must be settled while the unit is still in production. As part of our logistics and door-to-door delivery service we arrange sea freight, packaging and container loading, customs paperwork and shipment tracking, but the groundworks stay with your builder. Two points deserve attention early:
- Base and drainage: a fully level, structurally adequate slab sized to the finished shell dimensions, with drainage planned around the equipment compartment.
- Access for lifting and placing: confirm crane or forklift access, overhead clearance, and the distance from the delivery point to the final position.
If you are coordinating a wider villa or hospitality fit-out, the swim spa can be scheduled together with outdoor furniture, paving, and bathroom fixtures so that one shipment and one installation window cover several trades. Our custom and OEM service covers bespoke dimensions and finishes where a project calls for them, and our team handles production coordination, site guidance and after-sales support through the same contact.
A Short Pre-Production Checklist
- Model and shell dimensions restated in writing for your configuration, including deck level.
- Intended use agreed: swim current, hydrotherapy, family leisure, or a mix.
- Jet count and positions, lighting positions, water treatment method signed off.
- Supply voltage, phase and circuit capacity confirmed by your electrician against our specification sheet.
- Heat pump, insulation, filtration type, steps and control interface on the purchase order.
- Slab design, drainage and equipment access approved by your builder.
- Delivery term, port or site address, and lifting arrangements recorded.
- Warranty scope, spare parts list and commissioning support confirmed before shipment.
Moving Forward
Send us the site drawing, your intended use, and the electrical supply available at the position, and we will return a configuration for WS-PC08ST with dimensions, equipment list and power requirement stated line by line. Where an 8-metre shell is not right for the plot, we will show you which variant in the range fits and what changes as a result. Confirming these points before production is what keeps a custom swim spa on schedule from the factory floor to the first swim.