A wall panel in a matte lacquer finish looks quiet and even on site, but it is one of the least standardised items you can order. Panel size, substrate, finish sample, edge detail and fixing method are all decided per project, which is why a quotation for Santerson Matte Lacquer Panels is not something we can answer with a price list. This guide sets out what a buyer, contractor or designer should send in the first enquiry, and what comes back, so the quote you receive matches the wall you are actually going to build.
Why matte lacquer panels are quoted per project
Matte lacquer panels sit inside our Paneling Systems range, together with acoustic, textured, stone and marble, and glass and glossy panels. Every item in that range is made to measure: finish, layout and dimensions are specified to suit each space rather than taken from a fixed module. Two identical-looking feature walls can therefore carry very different costs, because the difference lies in panel geometry, cut-outs, edge treatment and how the assembly meets the floor, ceiling and adjacent openings.
Sending those variables up front removes most of the back-and-forth. A one-line request such as "price for 40 m² of matte panels" forces us to ask everything again, and any figure produced at that stage is an estimate you cannot rely on for a budget submission.
What to send in your enquiry
The list below is what our project team works from. Anything you can supply makes the quotation closer to final; anything missing becomes a question.
| Information | Why it matters for the quote |
|---|---|
| Location and room type | Bedroom, living wall, reception or corridor determines wear exposure and which fixing detail is appropriate. |
| Signed-off elevations with overall width and height per wall | Panels are cut to the wall. Dimensions drive material quantity, panel count and joint layout. |
| Panel layout preference | Board sizes, joint direction and whether joints should align with doors or reveals change both production and site time. |
| Finish reference | A colour code, a physical sample number, or a photo of the target surface. Matte sheen levels differ noticeably between samples under site lighting. |
| Edge and trim detail | Exposed edges, external corners, shadow gaps and any metal profile need to be defined, as they are separate line items. |
| Openings and services | Switch plates, sockets, integrated lighting, TV recesses and doors each add cutting and finishing work. |
| Existing substrate condition | Whether panels fix to a prepared frame, blockwork or an existing wall affects the substructure we include. |
| Quantity and phasing | Total area plus how many rooms or phases. Larger, consolidated runs are easier to price and to keep on one finish batch. |
| Delivery address and Incoterms | We arrange freight by sea, air or rail with door-to-door delivery; the destination sets the freight line in your quote. |
| Target date for order placement | Not a promise of lead time, but it tells us whether sampling and production can be scheduled realistically. |
How the quotation is prepared
Our cooperation steps run in a fixed order: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Your enquiry opens the first stage, and the quotation belongs to the second.
- Review. We read your drawings against the panel range and flag anything that conflicts with made-to-measure production, such as an unsupported edge detail or a sheen expectation that the chosen substrate cannot hold.
- Specification. Panel sizes, finish reference, edge and trim items, substructure and any cut-outs are written up as a schedule, so the quote refers to a defined build-up rather than "wall panels".
- Pricing. The schedule is priced line by line, with packing and the agreed freight term shown separately from production. Where a project also needs joinery, doors or other finishes from the same supplier, those items can be quoted together under one-stop furniture and building materials supply, which keeps joint responsibility with one factory.
- Confirmation. You check the schedule against your drawings before anything enters production. Changes after this point are treated as revisions, not corrections.
Samples and finish approval
Matte lacquer is judged by eye, so we recommend approving a physical finish sample before the order is confirmed. Send your reference — a colour code, an existing panel offcut, or a competitor-free target image — and request a sample against it. Assess it in the room where the panels will be installed, under that room's lighting, at both grazing and frontal angles. Low-sheen surfaces read very differently when light runs across them.
For villa and hospitality projects, keep the approved sample with the signed schedule for the whole order. Where a project is phased, matching batches across phases is much easier when the same reference stays on file.
Related panel options to price at the same time
Feature walls rarely stop at one finish. If your drawings carry other wall treatments, quoting them in one pass avoids mixed joint details and separate deliveries:
- Santerson Textured Panels where relief rather than a flat surface is intended.
- Santerson Acoustic Panels for reception, media and meeting spaces where reverberation needs attention.
- Santerson Stone & Marble Panels for stone-look walls that should align with matte lacquer joints.
- Wall Panel Systems if you want the full wall range reviewed together.
Common reasons a quote comes back as an estimate
Three gaps cause most of them. First, area without elevations: total square metres does not tell us how many panels, joints or cut-outs are involved. Second, "matte" without a reference: sheen and colour have to be pinned to something checkable. Third, undefined edges and corners: exposed trims and external angles are frequently left out of the enquiry and then added late at a different rate. Supplying those three items is usually enough for a firm number.
Next step
Send your elevations, panel layout preference, finish reference, delivery address and target order date, and we will return a schedule-based quotation for the matte lacquer panels in your project. If the same package also needs custom furniture and OEM production, or full turnkey interior project supply for a villa or hospitality fit-out, mention it in the enquiry so the wall panels are quoted as part of one coordinated package instead of an isolated order.
Use our contact form to send your elevations, finish reference and delivery details, or reach the project desk directly on Phone / WhatsApp +86-13928214007 (PHILLIP). Business hours are Monday to Saturday, 8:00 AM – 6:00 PM (GMT+8).