A set of Santerson Modern Slim Frame French Doors looks simple on a drawing: two glazed leaves, a narrow sightline, a clean opening between living room and terrace. On site, however, doors are the trade that punishes planning mistakes most visibly. Glass arrives late, openings do not match the frame, or the hardware is sitting in a different container from the leaves. The steps below show how we prepare a project order of these made-to-measure doors for international delivery, from the first measurement sheet to the handing over of keys on site.

What makes slim-frame French doors sensitive to logistics

Our Modern Slim Frame French Doors belong to the French Doors collection and are made for residential door openings. Every order is produced to the dimensions, layout, material and finish you specify, and each set is confirmed against your approved specification before production starts. That configurability is exactly what creates three delivery risks:

  • Oversize and weight. Full-height glazed leaves travel badly in standard cartons. They need vertical racking, edge protection and a loading plan that matches the container, not the other way round.
  • Fixed openings on site. A door cannot be trimmed to fit an opening that was built to the wrong size. The opening tolerance has to be agreed before the frame is manufactured.
  • Split consignments. Leaves, frames, glazing beads, handles and hinges are often finished or packed separately. If they arrive in two shipments, installation stops until the missing parts appear.
Rule of thumb from project work: for joinery and doors, confirm the opening size twice — once from the drawing and once from the built opening on site — before we release the order into production.

Stage 1: Locking down sizes, finishes and quantities

Before anything is quoted for freight, the order itself has to be frozen. For a door package we ask each project team to send:

  • A door schedule listing every opening: number of leaves, clear opening width and height, hinge or pivot side, and whether the set is single, double or paired with sidelights.
  • The finish selection for each set — frame material, glass type, colour or veneer — so that everything destined for one floor or one villa is produced in the same batch.
  • The wall build-up at each opening (plasterboard, masonry, timber stud), because it decides the frame depth and the architrave detail.

We then return a shop drawing for sign-off. Once you approve it, dimensions are locked; later changes mean re-manufacturing, not re-scheduling. If your project also includes matching items from the same collection — Santerson Arched French Doors for a period-style elevation, or Glass Sliding Doors for the same terrace — we group them on one production plan so they ship together.

Stage 2: Production, packing and container planning

Doors are produced with the rest of your joinery and Windows and Doors package where possible, so that one shipment covers the whole opening schedule. Packing follows the sequence of installation rather than the sequence of production:

  • Glazed leaves shipped upright in timber-framed crates with corner protection, never flat.
  • Frames and linings banded in bundles by opening number, wrapped against moisture for ocean transit.
  • Hardware — handles, hinges, closers, keys — boxed separately, double-packed inside the door crate so it cannot be lost between pallets.
  • Every crate marked with the door schedule reference and the room or apartment number it belongs to.

Before the doors leave the factory we send you the crate list with dimensions, weights and a loading diagram. Your site team can then check that the delivery bay, service lift and floor slab can take the sizes listed — a step that is far cheaper in an email than on arrival day.

Stage 3: Choosing the freight route

Our furniture logistics and door-to-door delivery service arranges freight by sea, air and rail, together with the paperwork that clears customs. For a door order the choice of route is mostly a question of size and timing:

Situation on your projectUsual approach
A complete set of made-to-measure doors for several villas or one large houseShared container alongside joinery, flooring and furniture series items, so one delivery serves the whole fit-out
A small number of replacement or late-added setsAir freight for the affected crates, so installation is not held up by an ocean sailing
Doors ordered together with cabinetry, wall panelling and flooringOne consolidated shipment under a single crate list, sequenced by room
A project with staged handovers across monthsPhased deliveries planned against your site programme rather than one bulk arrival

We prepare the commercial invoice, packing list and origin documents with the shipment and keep a logistics coordinator on your order from despatch to delivery. You receive tracking updates at each leg, and cargo insurance can be arranged for the consignment. Freight terms, import duties and local clearance requirements differ by country, so we confirm them with you in writing for the specific destination before booking — we do not promise a transit time or a customs outcome that the carrier and the importing authority have not confirmed.

Stage 4: Receiving the shipment on site

The inspection you carry out in the first hour decides whether installation starts on schedule. We send an unloading checklist with the crate list, and ask your team to work through it while the container is still being emptied:

  • Crate count against the packing list, before the carrier leaves.
  • Photographs of any damaged or wet packaging, taken in place and sent to us the same day.
  • Leaf and frame labels checked against the door schedule room by room.
  • Hardware boxes opened and matched to each set, including keys for locked sets.
  • Crates stored upright, dry and off the ground, in installation order — not stacked flat under later trades' materials.

If a leaf is damaged in transit, we do not ask you to wait for a single replacement to travel alone. We confirm the affected reference from your photographs, re-manufacture it and send it by the fastest practical route, while the undamaged sets continue to be installed.

Stage 5: Installation, snagging and handover

Slim-frame doors show every misalignment, so the setting-out stage matters more than for a standard panel door. Our furniture installation and after-sales support covers on-site fitting, inspection and snag resolution, spare parts and ongoing maintenance. For a door package the sequence we follow is:

  • Opening check: level, plumb and clear width measured against the approved shop drawing before any frame is fixed.
  • Frame fixing and alignment, then glass leaves hung and adjusted so both leaves meet squarely at the meeting stiles.
  • Hardware fitting and adjustment, architrave and sealant details finished to match the wall build-up agreed at order stage.
  • Snag list signed off with your site team, with each item recorded by door reference.

After handover, warranty terms, spare parts and maintenance support are handled through the same contact who managed the order, so replacements for a hinge, a handle or a sealed unit are traced to the original specification rather than guessed at years later. Warranty periods, response times and installer arrangements depend on the destination and the scope agreed in your contract; we set them out in writing for each project instead of applying a general promise.

A short checklist before you place a door order

  • Door schedule complete, with every opening numbered and matched to the drawing revision.
  • Shop drawings signed off; dimensions frozen; finish batch confirmed per area.
  • Crate list with weights and dimensions approved by your site team for access and storage.
  • Freight mode, delivery address and staged dates agreed in writing.
  • Inspection checklist issued, so damage is recorded the day the container is emptied.
  • Installation sequence and snag process agreed before the first crate is opened.

If you are specifying these doors for a villa or residential project — including work in Australia, where our project cases include villas in Sydney, Melbourne, Perth and North Turramurra — send us the opening schedule and we will come back with a production plan, a crate list and a delivery sequence your site programme can be built around. See also our turnkey interior project solutions when doors are part of a wider fit-out.

Send your door schedule to SANTERSON and we will confirm made-to-measure sizing, finish options, packing plan and delivery route for your project before production begins.