An outdoor swim spa is one of the few products on a villa or resort bill of quantities where the model code alone is not enough to price the job. Two units carrying nearly the same model name can differ in length, in whether a temperature-control option is included, and in how each one is wired on site. If your enquiry only says "one swim spa, please quote", the answer you receive will be built on assumptions — and those assumptions are what later turn into change orders.
The Outdoor Swim Spa WS-S06CT is a useful example, because it sits in the middle of our configurable outdoor swim and hydrotherapy range. Below is exactly what we need from a buyer to turn that enquiry into a firm quotation.
1. The site footprint and how the unit will be supported
The catalogue lists this model at 5880 × 2380 × 1400 mm. Send us the clear opening on your terrace, garden deck or plant room, plus the finished floor level around it, so we can confirm the shell fits with enough working clearance for the filter pump and control system. Tell us whether the unit will sit fully above ground, partly recessed into a platform, or flush with a surround — that decision drives the access panel layout, the insulation package and whether steps are needed.
Also confirm the slab or structural support is designed for a full water load. A shell of this size carries a heavy mass once filled, and that is a structural question for your engineer, not something we can decide from a catalogue drawing.
2. Which configuration you actually want
The WS-S06CT as catalogued shows water jets, LED lighting, ozone sanitisation and a swim training system. The specification block lists one control system, one swim training system, one water pump, one filter pump, 31 jets in total, four LED lights and a total power figure of 8.35 kW.
Those are catalogue figures for the standard build, not a fixed promise for every order. Options we quote separately include UV sterilisation, an additional or upgraded water pump, a heat pump, sand filtration, insulation and steps — and availability differs by model. A longer variant in the same series is catalogued at 6670 × 2380 × 1400 mm with temperature setting added to its feature list, which shows how quickly shell length and equipment lists move from one code to the next. So please tell us:
- The exact model code you are working from, or the drawing reference if a designer specified it.
- Whether you want heating and temperature control, and to what target water temperature.
- Your preferred sanitisation route — ozone as standard, or ozone plus UV.
- Filtration choice: the standard filter pump, or sand filtration.
- Insulation level, based on how cold your nights get and how often the spa will run in winter.
- Steps, handrails, cover or other access items.
3. Power supply and control on site
Electrical detail is where quotations most often need re-issuing. Send the supply available at the installation point: voltage, phase, frequency and the dedicated circuit capacity your electrician can provide. The 8.35 kW figure printed against this model assumes a complete standard build; adding a heat pump changes the load, so we confirm the requirement for your selected configuration rather than quoting from the printed number.
Tell us where the control system should sit and whether it needs to be reachable from the deck, tucked into a plant room, or tied into a building management system on a hotel project.
4. Delivery, access and who does what
Swim spas travel as oversized cargo, so we need the delivery address, the site access conditions, and whether a crane or tail-lift is realistic at your location. For villa and hospitality projects we arrange freight forwarding, customs paperwork and door-to-door delivery, and can cover on-site installation support and after-sales service within the same scope.
If your project also needs other outdoor elements — a cabana daybed with canopy and curtains beside the water, or an aluminium pergola nearby — send those enquiries together. As a one-stop furniture and building materials supplier, we coordinate the whole outdoor package in one production and shipping plan instead of leaving you to align several vendors.
5. Project context that changes the answer
A private villa, a boutique hotel and a resort wellness facility all buy this category differently. Let us know the project type, your target handover date, and whether the swim spa is part of a wider fit-out. That drives lead time, packaging sequence and whether we stage the delivery alongside other building materials.
| Item to send | Why it matters for the quote |
|---|---|
| Clear site dimensions and installation method (above ground, recessed or flush) | Sets access panels, insulation and whether steps are required |
| Model code plus chosen options | Length, heating and equipment list vary between close variants |
| Voltage, phase and dedicated circuit capacity | Total power depends on the configuration you select |
| Delivery address and site access | Sets freight method, unloading equipment and cost |
| Project type and handover date | Drives lead time, packaging sequence and staged delivery |
| Related outdoor or interior items in the same package | Lets one supplier coordinate production and shipping |
Catalogue dimensions, jet counts and power figures on our product pages describe the standard configuration for that model. Your quotation will restate them for the exact build you choose, and we ask you to confirm that document before production begins.
Send the enquiry and we will price it properly
If you can share drawings or even just a photograph of the intended location together with the list above, we can come back with a configuration, an itemised price and a realistic production schedule. Where the site conditions call for a different shell size or a non-standard layout, our custom and OEM service covers bespoke shapes and finishes so the spa matches the surrounding architecture rather than the other way round.
Planning a swim spa, hot spa or a full outdoor wellness area? Send your dimensions, power supply and delivery location to our project team, and we will return a specification and a quotation for the exact configuration your site needs.