A wall mounted media wall looks simple on a mood board and complicated on site. The screen has to sit at the right height, cables have to disappear, storage has to hold real objects rather than props, and the joinery has to line up with skirting, cornices and an uneven existing wall. Because Santerson Wall Mounted Media Walls are made to measure rather than ordered off a shelf, the quality of your enquiry decides how accurate the quotation is and how few changes you need after production starts. The checklist below sets out exactly what to send so that the quote covers the whole wall system, not just a cabinet.

What a Custom Quote Covers for a Media Wall

Our media walls fall into the TV cabinets and media units range, alongside Floating TV Units and freestanding cabinets. Each listing is configurable: finish, layout and dimensions are specified per project, so the price follows the specification instead of a fixed catalogue figure. A quotation normally covers the carcass and doors, the selected material and finish, internal fittings such as drawers, open shelving and closed compartments, the TV recess or panel, and any integrated lighting that forms part of the design. Freight and on-site installation are quoted separately, so tell us the delivery address and whether you need installation support.

Because these are project pieces, we confirm dimensions and selected specifications with you before production. Anything you leave out of the enquiry tends to appear later as a variation, which is why the details below matter more than the drawing alone.

Information to Prepare Before You Enquire

Send the following in your first message. It lets us return a usable quotation and a production drawing rather than a rough estimate.

1. Room, wall and mounting conditions

  • The overall width, height and floor-to-ceiling constraint of the wall, plus a sketch with dimensions marked on it.
  • Wall construction (timber stud, brick, double brick, plasterboard over studs) if known. Wall mounted units need a fixing specification that matches what is behind the surface.
  • Position of power points, data points, TV antenna point and any existing cabling, measured from a fixed corner.
  • Floor finish and skirting height, so we can show how the unit meets the floor and whether the plinth has to be scribed.
  • Photos of the wall, straight on and from an angle, plus a photo of the room so we understand sight lines from seating.

2. Equipment you are designing around

  • Screen size and model if selected, with the VESA pattern and whether you want the screen recessed into the panel or fixed on the surface.
  • Soundbar, speakers, console, set-top box, router and any components that must sit inside the unit, with their dimensions.
  • Whether doors need to close on equipment while it is running, which changes ventilation and material choice.
  • Whether you want cable management channels, a pull-out tray, or a hinged access panel for connections at the back.

3. Storage and layout brief

  • What the unit must actually hold: books, glassware, board games, records, files, barware or decorative objects. Bring a rough count.
  • How much of the wall you want closed versus open, and whether children or high traffic make soft-close hardware worthwhile.
  • Shelf depths you need, since deep books and shallow display pieces pull in opposite directions.
  • If media storage has to continue along an adjacent wall or into another room, send that layout too. Integrated Media Storage can be coordinated with the same finish so the joinery reads as one system rather than three purchases.

4. Finish and material direction

  • Send a photo of the flooring, paint or stone you are matching, and name the colour or laminate reference if you have one.
  • Tell us your preference for matte, gloss, timber look, veneer or lacquer, and whether you want contrasting internal shelving.
  • Hardware style: handleless, integrated pull, knob, or push-to-open.

5. Project and delivery details

  • Project type (owner-occupied villa, apartment, developer show unit, hotel or office lounge) and the city of delivery.
  • Your required on-site date and any site milestone that cannot move.
  • Whether you want us to coordinate other built-in furniture in the same package, such as Full Height Media Walls, sideboards or wardrobes, so everything arrives on one shipment and in one production run.
  • Quantity: one wall for a single dwelling, or repeated units across several apartments or guest rooms.

How the Quotation Is Prepared

Once we have the above, the enquiry moves through the same route as other custom work at our factory, which has been producing furniture and building materials since 2008. We review the layout against your dimensions, confirm material and finish selections, then issue an itemised quotation covering the unit, hardware, lighting where specified, packaging and freight to your address. After you accept it, we produce a detailed drawing for sign-off before manufacturing begins.

If you are an interior designer, builder or developer ordering for multiple dwellings, our Custom & OEM Service covers bespoke dimensions and finishes, prototyping, private labelling and flexible order quantities. Send the same information for each unit type, marked by dwelling or apartment plan, and we will quote them as a package.

StageWhat you sendWhat you receive
EnquiryWall dimensions, photos, equipment list, storage brief, finish direction, delivery city, required dateQuestions we need answered, and an indicative range where enough information exists
SpecificationConfirmed layout, selected material and finish, hardware, lighting decisionItemised quotation with unit, hardware, packaging and freight shown separately
ApprovalSigned production drawing and purchase confirmationProduction schedule and the point at which your specification is locked
DeliverySite access details and receiving contactPacked shipment with loading list, tracking, and installation guidance on arrival

A practical note on wall mounted units: the fixing method depends on your wall build and the loaded weight of the finished unit. Tell us the wall construction and what you intend to store, and we will specify fixings and, where needed, a backing frame or reinforcement in the carcass. This is decided with your builder or installer on site, and it is far cheaper to resolve on the drawing than after the wall has been set out.

Common Reasons a Quote Comes Back Incomplete

  • No wall construction detail. We can price the cabinet but not the fixing solution, so the quotation looks cheaper than the finished job.
  • Screen size only, no equipment list. Components and ventilation change internal depth, which changes panel sizes and price.
  • Finish described in words rather than references. "Natural oak look" means different things across laminate, veneer and solid timber; a sample or reference code removes the argument later.
  • No lighting decision. Integrated LED units need the driver position and circuit confirmed before the carcass is drilled, so leaving this open delays production sign-off.
  • Delivery address withheld. Freight is quoted to an address; without it we can only give an ex-factory figure.

A Short Example Enquiry You Can Copy

"Media wall for a living room in an apartment renovation. Wall is 3.6 m wide and 2.5 m high, plasterboard over timber studs, power and antenna point already in place at 1.1 m from floor level. 75-inch screen on a recessed panel, soundbar below, two consoles and a router to be stored behind a hinged door with ventilation. Open shelving on the left for about 40 books, closed drawers on the right for games. Matte finish matching charcoal oak flooring; handleless fronts. One unit required, site access needed from March, installation support required. Drawings and photos attached."

An enquiry written that way usually returns a complete quotation in one pass, because the layout, fixing conditions, ventilation and delivery scope are all answered at once.

Questions We Are Asked Most Often

Can you match an existing cabinet line? Send a photograph and, if possible, the material or colour reference. We confirm what we can reproduce in our own materials and finishes before quoting.

Do you supply the full-height version instead? Yes. If the wall needs storage from floor to ceiling rather than a floating composition, Santerson Full Height Media Walls are configured the same way and quoted on your dimensions.

Can media walls be ordered with other fit-out items? They can. Cabinetry, wardrobes, wall panelling and other built-in furniture from our range are commonly combined in one project package so finishes match and freight arrives together.

What if my wall is not straight? Send the survey or site measurements at several points along the wall. We show scribing allowances and packing on the production drawing rather than assuming a true plane.

Ready for a Quotation

Send your dimensions, photographs, equipment list and finish direction to our team, and we will come back with an itemised quotation for the wall system plus freight. If you are coordinating several dwellings or a hospitality project, say so in the enquiry; we will quote the media walls together with the rest of the built-in joinery as one package.