Integrated lighting is one of those details that looks simple on a rendering and turns complicated on site. A shelf niche glows evenly in the picture, then the electrician asks where the driver sits, which circuit feeds it, and what happens when the joinery arrives with no cable in it. If you are sourcing Santerson Integrated Lighting Systems for a villa, apartment or hospitality fit-out, the quality of your quotation depends almost entirely on how much of this you hand over before production starts. Below is the information our project team works from, in the order we usually need it.
Start with the room layout, not the light fitting
Integrated lighting sits inside a joinery or wall system, so the fixture is never quoted on its own. We first need to know which system it belongs to: modular shelving, a media and TV wall, an integrated storage wall, wardrobes, kitchen cabinetry or a bathroom vanity. Each of those has different fixing details, different tolerances at the wall, and different places where wiring can realistically be routed.
A dimensioned layout drawing is what unlocks the rest. The working drawings for our floor to ceiling modular systems and comparable wall systems normally carry overall width and height, module widths, shelf and bay heights, and the depth of each carcass. From those numbers we can say which profiles can take a channel, where a recess is deep enough for a diffuser, and whether the top module reaches the ceiling in a way that blocks an access point.
If you only have mood images and a room photograph, send them anyway. They tell us the intent. They do not tell us dimensions, and a quotation built on intent alone is the one most likely to be revised later.
Where the light should land, and what it should reveal
"LED strip in the shelf" is not a specification. Tell us the effect you are designing for, because that determines the profile, the diffuser and the mounting method:
- Task light under a wall cabinet or above a worktop, where the beam has to reach the surface without throwing a shadow.
- Display wash inside a glass-fronted cabinet or open niche, where even spread matters more than output. Our integrated LED media units are specified this way.
- Ambient glow from a perimeter or toe-kick reveal, where the source should be invisible and only the light reads.
- Accent grazing down a textured or stone-veneer panel to bring out surface relief. Paired with our backlit feature walls, this is where the diffuser angle and cut-off matter most.
- Vanity light at a mirror, which has to sit at face height and on the correct side of the glass. See our LED mirror cabinet range.
Colour temperature and dimming behaviour belong in this conversation too, and they are best agreed with your lighting designer or electrician rather than left to the joinery shop. We can build to whatever control system you specify, but we need that decision before the profile is machined, not after.
The electrical scope: who supplies what
This is the single biggest source of delay on integrated lighting packages, and it is a commercial question as much as a technical one. Decide early which of these you want us to supply:
- Light sources only, with your electrician running cable, supplying drivers and making connections on site.
- Light sources plus drivers and controllers, shipped together so the low-voltage side arrives as one matched set.
- Pre-wired modules with connectors, so the joinery lands on site ready to be plugged into your prepared feeds.
Whichever option you pick, we need the input voltage for the project, the number of lighting circuits and where each one terminates, and the dimming or control protocol your electrician is installing. Mains and low-voltage decisions change the profile depth, so a late switch means re-machining. For bathroom projects the same logic applies to integrated cabinet lighting and wall sconces: the zone the fitting sits in, and therefore its required rating, is set by your wet-room layout, so send that layout with the enquiry.
Finishes and materials you want matched
Integrated lighting touches every visible surface in the system, so the finish brief travels with it. Tell us the panel material and surface you are working to — veneer, lacquer, acrylic, melamine, metal frame, stone or marble panel — and whether the diffuser should read as a visible line or disappear into the shadow gap. Where a project has an existing sample board, send the physical sample or the reference code; matching a warm grey lacquer from a photograph is unreliable, and re-making a machined profile to fix a colour is expensive.
For metal-frame shelving, note that the frame finish and the profile finish are usually ordered separately. Our metal frame modular systems are made to measure in layout, dimensions and finish, and the lighting channel has to be specified in the same colour decision so it does not read as a second material.
Site conditions that change the build
The quotation also depends on facts about the building rather than the product. Please include:
- Wall construction and how flat the finished surfaces are, since a made-to-measure system still has to scribe to what is actually there.
- Floor-to-ceiling heights at the finished level, including any ceiling build-up or skirting you intend to keep.
- Where services, structural columns or radiators sit behind the run.
- Delivery access: lift dimensions, stair widths, and whether the site is occupied. Long panels and full-height modules need an assembly plan that accounts for how they get in.
- Your programme — the date the joinery must land on site, and the date your first fix electrical needs to be complete.
For projects outside China, tell us the destination city and whether you want door-to-door delivery handled by our logistics team or collection from our factory. That changes packaging, container loading and the paperwork we prepare.
A short checklist before you send the enquiry
| What you send | Why it speeds up the quote |
|---|---|
| Room layout and elevation drawings with dimensions | Sets module sizes, profile positions and whether a light can be built at all |
| Lighting intent per location (task, display, ambient, accent) | Determines profile, diffuser and mounting detail |
| Electrical scope choice and control protocol | Fixes driver supply, wiring extent and profile depth in one pass |
| Finish schedule or physical samples | Avoids remaking machined parts to correct a colour match |
| Site conditions and delivery access | Shapes module sizes, packaging and the installation plan |
| Programme dates and destination | Aligns production slots with your first-fix electrical deadline |
What we send back
With the above in hand, a Santerson quotation comes back as an itemised package: system breakdown by room, the lighting configuration for each run, what we supply versus what your electrician supplies, and lead time. Where a detail is still open, we mark it as an assumption rather than pricing around it silently — that way you can see exactly what would move the number.
Questions buyers ask us most often
Can integrated lighting be added to a system that is already in production?
Only before the profiles are machined. Once a shelf or panel has been cut for a different detail, adding a channel means remaking the part. The practical window closes at design confirmation, which is why the electrical scope belongs in the enquiry and not in a change order.
Do you provide the drivers and the control gear?
We can, as part of a matched set with the light sources, or we can leave that to your electrical contractor if their specification names particular equipment. Both are common; we price whichever split you choose.
What specifications do you need from our lighting designer?
Input voltage, output requirement per run, colour temperature, dimming protocol and the location of each controller. Anything beyond that — lumen output, wattage, IP rating for a particular bathroom zone — your designer should confirm against their own schedule, because those values depend on the final configuration rather than the product family.
Can one supplier handle lighting plus the joinery and the rest of the fit-out?
That is how we normally work. Cabinetry, storage walls, wardrobes, wall panels, flooring and decorative fixtures are produced under the same project management as the integrated lighting, so a single coordination point covers the interfaces instead of three suppliers passing a drawing back and forth.
Send us your drawings, the lighting intent for each run, and the electrical split you want. Our project team will turn that into an itemised quotation with the open points marked clearly, so nothing is discovered on site.