A glass sliding door looks simple on a drawing: two leaves, a track, a panel of glass. On site it is one of the few elements that combines joinery, wall opening, hardware and finish trade-offs at once, which is why quantity errors and coordination gaps show up late in a project. This guide covers how to count what you actually need for glass sliding doors and how to coordinate the related product families so the schedule, the opening sizes and the finishes all agree before production starts.
Start from openings, not from a door count
The first mistake is treating every sliding door as one line item. A measured opening gives you the clear width you need to pass through; the door assembly adds frames, an overlapping meeting stile and the track build-up, so the manufactured size is never the same number as the finished opening on the plan. Record each opening separately by room and level, with finished floor level noted, because a raised threshold or a tiled floor build-up changes the leaf height you order.
For each opening, note four things before any quantity sheet is circulated:
- Clear structural width and height of the opening, plus the wall build-up on both faces (plasterboard, tile, stone, joinery return).
- How many leaves the opening needs, and whether they stack to one side or part centrally in the middle.
- Whether the track sits in the floor, is hung from a header, or is surface-mounted — this decides the floor coordination you owe the tiling and flooring trades.
- The wall recess depth available for the pocket, if the leaf slides into a wall cavity rather than across a face.
Count what has to be ordered, not just the leaves
A quantity list that only names doors will miss the parts that make them work. Build the bill of quantities in groups so nothing is bought twice or left out at handover:
| Group | What to count | Coordination it triggers |
|---|---|---|
| Door leaves and frames | Each opening, leaf count, glass type and frame finish per room | Glazing specification, handle side, traffic direction |
| Tracks, runners and hardware | Track length, hangers, bottom guides, locks, bump stops, spares | Floor threshold detail, load rating for the leaf size chosen |
| Pocket and wall build-up | Casing, header, pocket depth, access panel for the track | Framing sequence, wall finish trade, ceiling line |
| Related sliding systems | Wardrobe and closet fronts, room-dividing panels in the same zones | Shared profiles, matching finishes, one delivery window |
| Adjacent interior doors | Hinged and flush doors in the same elevations | Consistent veneer, lacquer or glass tone across the schedule |
Order hardware spares with the main package rather than after defects appear. Hangers, bottom guides and locks wear first, and matching a replacement runner years later is harder than buying extras at production stage.
Coordinate the product families around the door
Sliding doors rarely sit alone. In bedrooms and dressing rooms they are part of a wider set of glass sliding door wardrobes; in open-plan living and hospitality areas the same profile language often continues into glass sliding panels used to divide space. Ordering these families from one supplier with one finish schedule keeps glass tint, frame colour and handle style consistent across the job, and it means a single production round instead of three.
Practical coordination points worth settling in one meeting:
- One finish reference per project. Issue a single approved schedule listing glass type, frame colour, veneer or lacquer and handle model for every sliding element, and mark which rooms use it. Verbal "same as the wardrobe" is where mismatch claims begin.
- Shared profiles where possible. Where a wardrobe front and a room divider can run on compatible tracks and frames, specify them together to cut both cost and site adjustment.
- Sequencing with wet trades. Track channels set into floors must be laid before tiling; pocket casings must be framed before wall closing. Put these dependencies in the programme, not in a note on a drawing.
- Made-to-measure discipline. Configurable products are cut to project dimensions, so re-measure after floor and wall finishes are complete, then freeze the sizes. Late dimension changes restart production and move the delivery date.
Work the quantity list through one procurement route
Once openings, leaf counts, hardware groups and finish references are settled, the remaining risk is fragmentation: doors from one vendor, wardrobes from another, panels from a third. Each split multiplies packing lists, container planning and site queries. Consolidating sliding doors, wardrobe fronts, sliding panels and the matching decorative interior doors under one manufacturing package gives you a single production slot, one set of shipping documents and one point of contact for snags.
SANTERSON supplies these elements as made-to-measure products for villa, hospitality and office projects, with custom and OEM service covering design, material and finish selection through to production, door-to-door delivery and installation support. Send a door schedule that lists each opening by number, size, leaf count and finish reference, together with the room elevations, and the specification can be confirmed against your drawings before manufacture.
Prepare your opening schedule and finish references first, then share them for a coordinated quotation covering glass sliding doors, wardrobe fronts and sliding panels in one package. Contact SANTERSON to review the specification before production is released.