A swim spa enquiry rarely fails because the buyer chose the wrong model. It stalls because the supplier receives a one-line request — "quote me the 7-metre spa" — and then spends several weeks guessing what the site actually looks like before a price can be issued. If you are specifying an outdoor swim spa for a villa terrace, a resort garden or a private training deck, the fastest route to an accurate quotation is a brief that answers the supplier's questions before they are asked. Below is the checklist we work from on the Outdoor Swim Spa WS-S07M, and it applies to any other model in the range.
Start with the site, not the catalogue
The model number is the last thing you decide, not the first. Send us the drawing or a marked-up photograph of the location and state three things: the clear internal length, width and depth you can actually allocate; whether the spa sits on a slab, on a deck or below grade; and how far the nearest power supply and drainage point are from the vessel. A 7000 × 2200 × 1480 mm shell needs working clearance around it for plant access and for people stepping in and out, so the footprint on paper is never the footprint on site.
State who will use the spa and when. A lap-swim spa used every morning by one household, and a hydrotherapy spa used twice a week by hotel guests with mobility limits, need different jet layouts, different entry arrangements and different water treatment assumptions. That single sentence changes what we quote.
What the WS-S07M catalogue page already answers
To keep the exchange short, here is what our published specification for this model states. Use it as a baseline and mark where your project needs something different.
| Item | Catalogue value for WS-S07M |
|---|---|
| Shell dimensions | 7000 × 2200 × 1480 mm |
| Total power | 10.75 kW |
| Water pumps / filter pump | 3 water pumps, 1 filter pump |
| Jet total | 40 jets |
| LED lighting | 2 lights |
| Control system | 1 set |
| Features shown on the page | Water jets, LED lighting, ozone, waterfall, 4 water columns |
Catalogue figures describe the standard configuration. Included equipment and electrical requirements change with the options you select, so confirm them in writing against your final specification rather than against the page.
Note also that comparable 7 m variants in the range are not interchangeable. The WS-S07B, for example, is shallower at 1335 mm, carries a different jet count and a higher total power figure, and does not show the water columns on its page. That is exactly why the specification has to be confirmed model by model instead of inferred from the length.
The four questions we ask on every swim spa brief
1. Electrical supply
State the available supply: single-phase or three-phase, voltage, and the distance from the meter or distribution board. A 10.75 kW total load is not a plug-and-play circuit, and the cable run is the item most often discovered late on site when it is left out of the brief. If your project already has an electrician's load schedule, attach it.
2. Heating and insulation
State the target water temperature and how many months a year the spa will be used at that temperature. Heat pump sizing and the insulation package depend on that answer and on the local climate, not on the model code. Our optional accessories list includes heat pumps, insulation, UV sterilisation, additional water pumps, sand filtration and steps. Say which of these you want inside the base quotation and which you want priced as alternatives, so the comparison is like for like.
3. Water treatment and maintenance duty
The standard page lists ozone. If the spa sits in a hospitality setting, state who will be responsible for water testing and filter cleaning, because that determines whether a larger filtration package is worth specifying at the outset rather than retrofitted later.
4. Access, delivery and installation
A 7-metre vessel has to travel from the factory floor to your terrace. Send us the access route: whether a crane is available or needed, stair width, gate width, lift dimensions for a rooftop deck, and whether the substrate is finished before the spa arrives. We arrange freight by sea, air and rail with customs paperwork and door-to-door delivery, and installation and after-sales support sit within the same service scope. We can only plan that properly when the site constraints are in the first email.
A ready-to-send enquiry format
Copy this into your message and fill in the blanks. It is short on purpose; every line removes one round of clarification.
- Project type and location: villa, resort, clubhouse or private residence, city and country.
- Model of interest: Outdoor Swim Spa WS-S07M, or ask us to recommend a model if the space is smaller.
- Site condition: slab, deck, recessed or rooftop; clear opening dimensions; access route.
- Electrical supply available, plus load schedule if you have one.
- Target water temperature and expected months of use.
- Options to price: heat pump, insulation, UV sterilisation, sand filtration, steps, extra pumps.
- Who performs installation, and whether you want us to do it.
- Delivery term preferred and required on-site date.
Why this matters when several trades are involved
A swim spa is rarely bought alone. On villa and hospitality projects it travels in the same shipment as outdoor lounge seating, pergolas, wall panelling, bathroom ceramics and lighting, and it shares one production and delivery schedule with them. Coordinating that scope through a one-stop solution supplier removes the interface problems — a deck built to the wrong tolerance, a power run sized for the wrong load, a crane booked for the wrong week — that make individual trades look cheap and the whole job expensive.
If your project needs a spa shaped to an irregular terrace rather than a standard rectangular shell, say so in the same enquiry. Our Customizable Shape Outdoor Spa line covers square, round, oval and curved shells, and designing one is straightforward when the swim spa requirement and the custom requirement appear on the same drawing.
Send the site photographs, the supply details and the usage pattern. We will come back with a specification sheet, not only a number.