A kitchen island that doubles as a bar is one of the easiest places for a villa or boutique-hotel project to lose money. The drawing looks finished, the tender price is agreed, and then the first shop drawing comes back with questions nobody answered: what sits under the counter, where does the fridge go, who supplies the skirting, which finish wraps the end panel. An island bar unit is not a single item you order from a catalogue; it is a small piece of joinery that touches flooring, electrical, stone and seating. This guide sets out how to write a specification for Santerson Island Bar Units that a factory can price accurately and an installer can build without coming back to you three times.
Start with function, not appearance
The first line of the specification should describe what the island has to do in that particular building. In a private villa, an island bar unit usually works as breakfast seating plus storage for glassware and everyday dishes. In a serviced apartment or short-stay project, it leans more toward durability and a place to leave luggage and supplies. In a resort residence with entertaining in mind, the client may want a second sink, a wine fridge, or a concealed preparation zone that can be closed off when guests arrive.
Write that function down before you choose a door profile. Santerson's bar cabinet range is configurable rather than fixed, and the same collection covers several different jobs: Santerson Integrated Bar Systems for a run that carries appliances and tall storage, Santerson Wall Mounted Bar Units where floor space is tight, and Santerson Compact Bar Cabinets for a smaller pantry or study corner. Naming the intended use tells the factory which carcass construction and support detail to price.
The six items every island bar specification needs
Across villa and apartment cabinetry packages, the specifications that come back with few queries share the same structure. Missing any one of these six blocks invites a query.
| Specification block | What to record | Why it changes the price |
|---|---|---|
| Envelope and setting-out | Overall length, depth and height; clear floor-to-ceiling height at the location; position relative to walls, door swings and the kitchen run | Made-to-measure carcasses are cut to your numbers, so a changed length is a new part, not an adjustment |
| Carcass and door construction | Door style (flat panel, shaker, handleless), core material, edge treatment, drawer boxes versus doors, hinge and slide brand if you have a preference | Handleless and integrated-pull details need different machining than a standard overlay door |
| Worktop interface | Worktop material and thickness, edge profile, whether the top is supplied by the cabinet maker or the stone fabricator, overhang dimensions for seating | A worktop carried by the cabinetry needs internal noggins and a bearing line; that detail has to be drawn before production |
| Appliances and services | Model numbers or at least cut-out sizes for wine fridge, dishwasher, sink, hob; power and water locations; ventilation route | Appliance housings, heat shielding and access panels are built into the carcass, not added on site |
| Internal fit-out | Shelf heights, drawer configuration, cutlery organisation, bottle racking, bin provision, any pull-out corner hardware | Fittings are priced per item; a vague "assorted shelving" line becomes an argument at handover |
| Finish and matching | Sample reference for the door colour or veneer, sheen level, which other joinery in the project must match it, end-panel and return details | Veneer and lacquer batches vary; matching to a named reference avoids a second production run |
How to state dimensions for made-to-measure units
Santerson's configuration lists made-to-measure sizing, which means your numbers become the manufacturing numbers. Two habits make that safe.
- Give rough-in and finished levels. Specify the floor finish build-up at the island location, not just the structural slab. A 30 mm difference in floor level moves the whole set-out and can leave a toe kick sitting proud of the timber flooring.
- Separate fixed from adjustable. State which dimensions are hard constraints — a ceiling height, a service riser, an existing opening — and which are your design intent. The factory can then hold the constraint and propose the adjustment instead of building your error.
Where the island sits in an open-plan space, also record the seating side: number of stools, stool width, and whether you want a 250–300 mm knee overhang or a flush edge. Stool selection is often left out of the cabinetry package entirely, and it changes both the overhang detail and the position of the footrest.
Lighting, stone and the interfaces you should not leave open
Island bar units almost always carry lighting under an overhang or inside open display bays. If your design calls for that, specify Santerson Integrated Cabinet Lighting in the same package and record the transformer location, switching route and the driver access point. A recessed profile needs a machined channel, so it has to be decided before the door panels are cut.
For stone and marble worktops and splashbacks ordered through the same project package, Santerson Stone & Marble Surfaces are made to measure as well. In that case, ask for templating or a dimensioned stone drawing after the carcasses are set out on site, and state clearly in the specification who templates, who cuts and who installs. That single sentence removes most of the finger-pointing between the cabinet supplier and the stone subcontractor.
A short template you can copy into your tender pack
Item: Island bar unit, made to measure. Location: [open-plan kitchen / residence no.]. Envelope: L ___ × D ___ × H ___ mm at finished floor level. Carcass: [material], door style: [flat panel / shaker / handleless]. Worktop: [material, thickness, edge profile], supplied by [cabinet maker / stone fabricator], seating overhang ___ mm. Appliances: [list with cut-out dimensions]. Internal fit-out: [drawer and shelf schedule]. Services: power at ___, water at ___, extract at ___. Lighting: [profile type, driver location, switching]. Finish reference: [sample code], to match [joinery item]. Tolerances and site set-out to be confirmed before release to production.
Keep that block as the first page of the cabinetry package. It is short enough that a pricing team reads it, and specific enough that the shop drawing stage becomes confirmation rather than negotiation.
How one supplier reduces interface risk
Island bar units rarely stay inside one trade. The same project also needs wall panelling, doors, flooring, bathroom joinery and lighting to sit against them. Ordering the island through a turnkey furniture and building materials package means the carcass, worktop, lighting and adjacent joinery are drawn and released by one production team, so the interface details get resolved in the factory instead of on site. Santerson's workflow runs from design consultation and product specification through manufacturing, logistics and door-to-door delivery to installation support, which is the sequence most villa and hospitality buyers need when cabinetry crosses a border.
If you are tendering an apartment or hotel scheme where the island bar repeats across units, ask for a prototype unit on the first release. One physical sample settles finish, door feel, hardware quality and worktop joint detailing before the repeat order goes into production.
FAQ
Can I specify an island bar unit without a designer's drawing? Yes. A dimensioned sketch with plan and elevation, plus the six blocks above, is usually enough for a quotation. The supplier will return a shop drawing for your sign-off before production.
Should the worktop come from the cabinet maker or a local stone supplier? Both work. Importing the worktop with the cabinetry keeps thickness, edge profile and cut-out coordination in one factory; buying stone locally shortens the lead time for corrections. State your choice in the specification so the carcass is built to carry whichever route you pick.
What information do you need before pricing? Location and envelope dimensions, door style and finish reference, appliance list with cut-out sizes, worktop decision, and internal fit-out preferences. Missing items are quoted as provisional allowances, which is exactly what you want to avoid.
Send us your island bar drawings for a written specification review
Share the plan, elevation and appliance schedule for your project. We will confirm materials, hardware, worktop interface and lighting provisions, then return a shop drawing for your approval before production.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquiry page: https://www.santerson.com/contact/