An open display unit is one of those built-in pieces that looks simple on a drawing and complicated on site. Shelves have to sit level, spans have to carry the objects you actually own, and the carcass has to disappear into a wall that is rarely square. Because our open display units are made to measure for each space, we quote them project by project rather than from a price list. This guide explains exactly what to send us so the quotation comes back accurate the first time.
What "made to measure" means for this product
The open display units belong to our Display Cabinets collection, alongside wall mounted display cabinets, curio cabinets and glass front display cabinets. Three variables are set per project rather than chosen from a fixed list:
- Dimensions. Overall height, width and depth, plus the vertical spacing of each shelf bay.
- Layout. Which sections stay open, which are closed with doors or drawers, and where niches or lighting positions fall.
- Material and finish. Substrate, edge treatment, colour or wood-grain finish, and hardware style.
Each of these moves the price. A unit quoted from a photo alone is a guess; a unit quoted from a dimensioned layout is a commitment we can build to.
Information to include in your enquiry
Send the items below and we can work from them directly. Missing pieces are not fatal, but each one you leave out becomes a question we have to ask before pricing.
| Item | Why we need it |
|---|---|
| Room and wall dimensions | Floor-to-ceiling height, clear wall width, depth available, and any skirting, cornice or service run that the unit must clear. |
| A layout sketch or marked-up drawing | Shows which bays stay open, where closed storage sits, and whether the unit wraps a corner or stops against an opening. |
| Shelf loading | Books and ceramics load a shelf very differently from light decorative objects. This decides shelf thickness, span and support type. |
| Finish reference | A paint code, laminate sample number, or a photo of an existing cabinet you want the unit to match. |
| Quantity and site location | One unit for an apartment or a repeated set across villas or guest rooms changes both production and packing. |
| Delivery terms and access | Port or door address, floor level, lift or stair access, and whether the site has a fixed fit-out window. |
Two details that cause most rework
Confirm what sits on the shelves
Open shelving fails quietly over time: a long span of thin shelf sags under a row of hardbacks. Tell us the intended contents and we will set the span and thickness accordingly, or add a vertical division where you would rather not see one.
Decide early whether lighting is in scope
If you want lit shelves, say so at enquiry stage. Routed channels, driver position and switching all have to be designed into the carcass before panels are cut, and they need to match the voltage and fitting standard of the destination country. If a lit cabinet suits the scheme better than open shelving, our illuminated display cabinet is the version to price instead.
How the quotation is handled
Open display units are part of our built-in furniture range, and we quote them through the same route as the rest of the catalogue. Our custom and OEM service covers bespoke design and prototyping, material and finish selection, and flexible order quantities, so a single unit for one apartment and a repeated set for several villas are both workable.
Once the specification is agreed, production follows the sequence on our one-stop solution page: design and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. Freight is arranged by sea, air or rail with the customs paperwork handled on our side under logistics and door-to-door delivery, and installation and after-sales support covers site fitting, inspection and snags. Exact transit terms, duties and warranty scope are confirmed in writing for your address and configuration rather than assumed.
If the display unit is one element of a wider fit-out, send the whole room schedule instead. We regularly price cabinetry together with engineered wood flooring, wall panels and wall cladding and lighting on a single project, which removes the coordination problem of matching finishes across three separate suppliers.
Send your enquiry
Email the wall dimensions, a marked-up layout and your finish reference, and tell us what the shelves will carry. If you are specifying display units across several apartments or villas, include the room schedule so we can price the set as one production run.