A product submittal is the document pack a buyer, contractor or designer reviews before a door package is released for manufacture. For a made-to-measure item such as Santerson Arched French Doors, the submittal is where an idea drawing becomes an orderable, installable opening. Because our doors are produced to project-specific dimensions with selectable materials and finishes, the quality of the submittal directly decides how smooth production and site installation will be. This guide lists what we expect in a complete submittal for arched French doors, and what our team returns to you.

Why arched French doors need a fuller submittal than a standard door

A rectangular leaf can usually be read straight off a door schedule. An arch adds geometry: the curve radius, where the arch springs from the jamb, the height difference between the two leaves in a pair, and how the arched head meets the surrounding wall or lining. Glazing bars, muntin layout and any decorative mouldings also have to follow that curve rather than a straight line.

That is why we ask for the arch to be defined on a drawing instead of described in an email, and why we send back a shop drawing for your sign-off before cutting anything. The same logic applies across the rest of the collection, from Santerson Modern Slim Frame French Doors to Santerson Decorative Interior Doors: the more the opening is specified up front, the fewer questions come back during production.

The information we need from you

ItemWhat to provideWhy it matters
Opening sizes and arch geometryClear opening width and height, arch rise or radius, springing height, wall thickness and lining depth, floor finish levels.Sets the leaf shape, frame depth and where hardware can sit. Made-to-measure sizing starts here.
Layout and operationSingle or double leaf, which leaf is active, hinge side, opening direction, meeting-stile detail, whether a fixed sidelight or transom is involved.Determines hinge positions, lock prep and the sequence of installation on site.
Material and finish schedulePanel and frame material, wood species or veneer, stain or paint colour with a reference, glass type if glazed, metal finishes for hardware.Finish, layout and dimensions are all specifiable; a written schedule prevents colour and grain disputes later.
Hardware setHinges, handles, lock body or latch, door closer, stays or floor springs, plus any fire or access requirement you are working to.Hardware dictates prep depth and load rating; it must be chosen before the leaves leave the workshop.
Interface detailsWall build-up, plasterboard or masonry, arch head condition, skirting and architrave treatment, threshold and floor transition.Tells the fixing team what the frame has to bite into and how the arch is closed off.
Project contextRoom list or door schedule, project location, delivery address, site access limits, storage conditions, target installation window.Supports packaging, container loading, freight planning and on-site coordination.
Reference materialMarked-up elevations, mood board or reference photo, existing drawings in CAD or PDF.Gives our design team something concrete to model before producing shop drawings.

What we return as part of the submittal

  • Shop drawings showing each leaf, the arch geometry, frame sections and hardware positions, dimensioned for your approval.
  • A finish and material schedule listing panel construction, veneer or paint system, glass build and hardware make-up.
  • A 3D rendering or visual where the design intent still needs confirming, which is part of our interior design and project coordination service.
  • A quotation tied to the approved drawing revision, so price and specification move together.
  • Packaging and loading information for shipment, plus installation guidance for the site team.

Rule of thumb: any dimension, finish or hardware item that is not written down will come back as a question during production. Approving one drawing revision costs an hour; approving three costs a delivery date.

How the submittal fits into our project workflow

Our cooperation steps run from project brief and design proposal, through quotation and detail confirmation, to production, shipment and follow-up. The submittal sits in that middle stage: it is where the specification becomes a signed drawing set. For villa and hospitality projects we often coordinate doors together with custom built-in kitchen cabinets, wall panelling, wardrobes and joinery in one package, which means one drawing set governs the arch language across the whole interior rather than one room at a time.

Where a project calls for a bespoke arch profile or a non-standard leaf proportion, our custom and OEM service covers design and prototyping, material and finish selection, and brand or packaging requirements for resellers and contractors ordering under their own label.

Common gaps that delay an arched door order

  • Only the opening width given, with no arch rise or springing height. The curve cannot be drawn from a width alone.
  • Finish specified by name only ("oak", "matte black"). Always attach a code, sample reference or supplier equivalent.
  • Hardware left to site selection after the leaves are made, leaving prep that does not match the product delivered.
  • Floor finish levels not stated, so the leaf height is measured against the wrong datum.
  • No named approver for the shop drawing, which stalls release for manufacture.

A short checklist before you send it

Confirm that every opening in your schedule has dimensions, arch geometry, material and finish reference, hardware set and a named approver. Then confirm the delivery address and installation window. If any of those six items is missing, complete it first; if you have the drawings but not the specification, send what you have and our team will mark up the gaps with you.

Send your door schedule, marked-up elevations and finish preferences to us and we will come back with shop drawings and a quotation against the same revision, so the arch on paper and the arch on site are the same opening.