A glass front door is the most visible part of a kitchen, and it is usually the item that arrives last on site because it sits at the end of the production sequence. When the doors are right but the quantity is wrong, or when the tall unit next to it was specified in a different material, the whole joinery package looks unfinished. This guide covers how to set out quantities for a Santerson Glass Front Pvc Cabinet and how to coordinate it with the rest of the cabinetry so one order, one shipment and one installation visit are enough.

What you are actually ordering

The Santerson Glass Front Pvc Cabinet is a PVC kitchen cabinet design within our PVC Kitchen Cabinet collection. Like every item in that collection it is made to measure, with material and finish options selected per project and a layout drawn around the actual room. There is no fixed catalogue size to count against: each run of units is built to the dimensions your drawings show, so quantities are counted in linear metres of cabinetry and in individual door leaves rather than in boxes off a shelf.

Because sizing, finish and internal layout are confirmed with us for every order, the quantity plan and the specification have to be settled together. A quantity list that says "12 units" tells the factory nothing useful; a list that states run length, unit height, door count per unit and glazing type per opening does.

Step 1: Set out the run before you count anything

Work from a dimensioned drawing of each wall, not from a photograph or a hand sketch. Mark the finished wall face, not the structural wall, and note every element that eats into the run:

  • Reveal depth at ceilings and floors, including any screed or floating floor build-up that is still to be poured.
  • Service risers, meter boxes, flues and downpipes that force a filler panel or a shallower unit.
  • Appliance niches with published cut-out dimensions, including built-in ovens, dishwashers and refrigeration.
  • Window reveals and skirting returns where a glass front door would clash with the architrave when it swings open.

Send us that drawing rather than a summary. Our design and production coordination reads the room dimensions directly from your layout, which is how made-to-measure sizing avoids the on-site trimming that damages a PVC profile edge.

Step 2: Count in three groups

Splitting the order into three counts prevents the usual double-ordering and shortfalls:

GroupWhat you countWhy it matters for a glass front run
Carcass unitsBase, wall, tall and corner units, by position on the drawingSets the linear metres and the support needed above glazed openings
Door leavesNumber of glazed doors, their height and width, and glazing type per openingGlass is packed and braced separately, so leaf count drives crate design and the spare allowance
Coordination itemsFiller panels, scribes, plinths, handles, internal fittings, integrated lightingThe small parts are what make a glazed run read as built-in rather than freestanding

Number every position on the drawing and repeat that number on the packing list. When crates arrive numbered to match the plan, the installation crew lays them out in sequence instead of opening everything.

Step 3: Decide where glass goes and where it does not

Glass front doors work hardest where display content is worth showing: a short wall of crockery near the dining area, a coffee and glassware station, or a servery in a guest suite kitchenette. Running glazed doors along an entire wall turns every shelf into visible storage and multiplies the number of panels to be handled on site.

A practical rule for project work is to keep glazed openings to the upper wall units and the display positions, then close the rest of the run in solid fronts from the same collection. If you want a single material story across the whole kitchen, our wood grain pvc cabinet and Santerson Shaker Style PVC Cabinets lines are specified the same way, so solid fronts can match the glazed units in colour and texture while keeping the internal layout hidden.

Where a kitchen opens onto an outdoor living area or an alfresco servery, tell us at the enquiry stage. Our Santerson Outdoor Ready PVC Cabinets are specified for those positions, and mixing them into one project with interior glazed units is a specification decision, not something to sort out after production starts.

Step 4: Coordinate the rest of the package at the same time

Cabinetry rarely fails on its own; it fails where it meets another trade. Settle these interfaces before you release the order:

  • Worktops. Bench depth and thickness determine whether a glass front wall unit can sit proud of the counter. Confirm the worktop material with us so the cut-out schedule and the carcass depths agree.
  • Appliances. Built-in appliance models change both the niche size and the vent requirement. Send the model list, not just "oven" and "fridge".
  • Lighting. Glazed units usually need internal lighting to be worth glazing. Integrated cabinet lighting is scheduled with the doors so wiring routes exist before the crates are packed.
  • Adjoining joinery. Pantry walls, laundry tall units and dining sideboards should come from the same specification round, otherwise handle style and finish drift between rooms.

For whole-project work we coordinate cabinetry with the other fixtures in the same package. Custom Built-in Kitchen Cabinets for apartment and hotel work are drawn alongside bathroom, flooring and wall finish selections, which is what keeps one container of mixed goods arriving in a sequence the site team can actually use.

Step 5: Order it as one delivery, not three

Splitting cabinetry across separate orders is where projects lose weeks: the glazed units arrive, the tall units follow a month later, and the site waits. We handle production coordination and door-to-door delivery through our logistics service, with packaging and container loading arranged so numbered crates unload in installation order.

For an enquiry, send the dimensioned drawing, the appliance list, your finish choice from the PVC Kitchen Cabinet collection and the number of glazed openings you want. We confirm dimensions and selected specifications for each project before production, so the quantity sheet and the shop drawings are signed off against the same numbers.

Planning a kitchen or joinery package and want a quantity check before you commit? Send us your drawings through the contact page and we will review the run, the glazed positions and the coordination items with you.