A submittal is the document package a buyer, contractor or designer reviews before a cabinet order is released. For Painted Shaker Cabinets, the quality of that package decides how many questions come back and how quickly production can start. This guide sets out what to ask for, section by section, and what each item lets you verify.

What a Submittal Is Supposed to Settle

Shaker doors look simple: a flat centre panel framed by four rails and stiles. That simplicity is why they are easy to specify badly. Two projects can order "grey shaker, painted finish" and receive completely different doors, because the phrase does not define the substrate, the paint system, the profile radius or the frame width. A submittal exists to remove that ambiguity in writing before money moves.

In practice a good package answers four questions: what exactly is being built, how it will be finished, how it fits the site, and who signs off on each decision. If your supplier's documents answer all four, you can approve them from another country with confidence. If they do not, the gaps surface later as change orders or as a kitchen that does not match the renderings.

1. Shop Drawings at Real Dimensions

Ask for dimensioned drawings of every run, not one generic perspective image. The drawings should show overall cabinet heights and depths, individual carcass widths, door and drawer-front sizes, and the relationship between them.

  • Carcass and door dimensions in millimetres, with the unit of measure stated on the sheet
  • Filler panels, scribes and end panels called out explicitly, so you can see how out-of-square walls are absorbed
  • Appliance locations with the model or clearances already fixed, including ovens, dishwashers and any integrated fridge
  • Toe-kick depth and height, plinth colour, and whether the run is scribed to the wall or finished with a panel
  • Clearances at corners, returns and openings, plus the swing direction of doors and the pull-out envelope of drawers

Made-to-measure sizing is where a China-based factory adds real value, but only if the drawings are checked against site conditions. Have your site team verify critical dimensions on the finished floor and finished wall before you sign the drawing sheet. Once production starts, a corrected dimension is far more expensive than a corrected line on paper.

2. The Door Profile Drawing

This is the section most buyers skip, and it is the one that changes the character of a painted kitchen most. Request a full-size or enlarged cross-section of the door and drawer front.

Item to see on the drawingWhy it matters
Rail and stile widthNarrow frames read modern, wider frames read traditional. The same paint colour looks different at 50 mm and at 75 mm.
Rebate depth and panel set-backControls the shadow line and how much light the frame catches across the run.
Edge radius on rails, stiles and panelPaint breaks away on a sharp edge and pools on a soft one. A small, consistent radius is what keeps a painted door looking even under raking light.
Panel material and thicknessA centre panel that moves with humidity can telegraph through the paint film at the joints.
Applied moulding versus single-piece routed doorJoint lines are the first place a painted finish shows wear; knowing the construction tells you what to expect after years of cleaning.

If the supplier offers several shaker profiles, ask for them drawn side by side at the same scale. Comparing photographs of finished kitchens will not give you this information reliably, because camera angle and lighting hide the profile.

3. Substrate, Paint System and Colour Reference

"Painted" describes a result, not a specification. Your submittal should state the panel construction and the coating sequence separately.

  • Substrate: the core board used for doors and drawer fronts, and whether it is engineered to stay flat in a painted application
  • Coating sequence: primer, base coat and top coat, with the number of passes listed rather than implied
  • Sheen: matt, satin or semi-gloss recorded in writing. Sheen is what makes a colour sample look wrong on site under different lighting.
  • Colour reference: a named standard reference or the supplier's own swatch number, matched to a physical sample you approve
  • Application method: sprayed or vacuum-coated, since texture and edge coverage differ between methods

Always ask for a painted door sample in the actual profile, not a flat tile. A flat tile cannot show you how the paint sits on a radius, how the rebate corners fill out, or whether the colour reads correctly across a frame and a panel that took the coating at different angles.

If your project mixes finishes, put the comparison in the same document. Our Grey Shaker Cabinets and White Shaker Cabinets pages sit in the same collection, and a two-tone scheme is often specified with painted uppers against a stained or laminated base. Each finish needs its own line in the schedule.

4. Carcass Construction and Interior Specification

The doors get the attention; the carcass determines how the kitchen survives. Confirm these points in writing:

  • Carcass material and board thickness, and edge banding on all visible edges
  • Assembly method: dowelled, cam-locked or glued construction, and whether the box is square and rigid when it arrives
  • Back panel fixing, which affects how the run ties together on site
  • Adjustable shelving where required, with shelf span and thickness noted so a loaded shelf does not deflect
  • Interior fittings: pull-out trays, corner systems, drawer organizers, tray dividers and any integrated laundry or pantry fitments

For hotel and apartment work, where identical layouts repeat across many units, the interior specification is what keeps unit twelve consistent with unit two. Our Custom Built-in Kitchen Cabinets supply covers exactly this pattern: custom sizes and finishes with matching hinges, drawer slides, support legs and connecting brackets listed as part of the package rather than sourced separately on site.

5. Hardware Schedule

List every item of hardware in a table with a brand or model reference, the finish, and the quantity per unit. A schedule that says only "soft-close hinges" leaves too much room.

HardwareWhat to record
HingesMounting type, opening angle, integrated soft-close or add-on damper, finish
Drawer slidesLoad rating, full extension or partial, soft-close, under-mount versus side-mount
Pulls and knobsModel, centre-to-centre fixing centres where applicable, finish, and whether they are supplied or site-procured
Integrated handlesProfile of the routed or extruded edge, since this affects door thickness
Appliance and pantry fittingsSliding rail sets, door brackets and any specialist fixings for tall units
Lighting interfaceSwitch positions, transformer locations and cable routes if under-cabinet or in-cabinet lighting is included

Hardware finishes age differently against painted doors. Warm metallics against a light grey or off-white shaker front create the softer look many villa owners ask for; blackened hardware reads sharper against the same door. Decide this on the sample board, not from a catalogue page.

6. Finish Schedule and Room-by-Room Coding

On anything larger than a single kitchen, give every door, drawer front, panel and shelf a code that ties back to one line in the finish schedule. A schedule row should carry the code, the item it applies to, the substrate, the colour reference, the sheen and the application method.

Coding matters most where painted shaker is combined with other joinery in the same house. A typical villa package may run painted shaker in the kitchen, a matching painted finish in the utility and pantry, a wood veneer or lacquered finish in the bedrooms, and painted panelling or concealed doors in the hallway. Each of those lines needs its own approval, and each needs to be identified on the packing list so the right crates open in the right room.

7. Samples and Sign-Off Record

Name every physical item you will hold before production, and record who approved it and when:

  • A door sample in the specified profile and full paint build
  • A carcass corner sample showing board, edge banding and interior colour
  • Hardware on a board, mounted as it will sit on the door
  • Stone or engineered-stone worktop samples where the supplier coordinates them

Write the approval date on the sample itself and photograph it against the drawing sheet number. When a dispute arises months later, this is the record that settles it.

8. Packing, Delivery Sequence and Site Handling

Ask for the packing list before the containers are loaded, and check that crate labels match your room codes. For an international order, delivery sequence is a schedule question, not a logistics detail: painted doors arriving in the wrong crate sit in a corridor while the rest of the kitchen waits.

  • Crate marking by room and run number, matching the drawing set
  • Protection between painted faces, and corner protection on door edges
  • Separate crates for glass, hardware and fragile fittings, clearly marked
  • A quantity check against the order per crate, so shortages are found at unloading rather than at installation

Confirm storage conditions on site as well. Painted doors should stay indoors, flat or upright on a level surface, and out of direct sun until hung. Where the supplier handles freight and door-to-door delivery, ask which party is responsible for inspection at each handover point.

9. Installation Details and Snag Process

Close the submittal with the practical information your installer needs: levelling method and adjustable leg range, how runs connect, scribing allowances at walls and ceilings, fixing details for tall units and wall-hung cabinets, and ventilation arrangements behind sink and appliance units.

Then state what happens after installation. A clear package includes an inspection walk with a snag list, a defined route for reporting damage in transit versus damage on site, replacement of any affected panel, and the warranty terms actually offered for the paint finish and the hardware. If you are buying from an overseas factory, ask whether local installers support the work or whether your own trades do, and put that division of responsibility in writing.

A Simple Approval Checklist

DocumentApproved byStatus
Dimensioned shop drawingsSite / designerBefore order release
Door profile cross-sectionDesignerBefore order release
Substrate and paint system sheetSpecifierBefore order release
Colour and sheen sample in profileClientBefore order release
Carcass construction noteInstallerBefore production
Hardware schedulePurchaserBefore production
Finish schedule with room codesSite / designerBefore packing
Packing list and crate markingLogistics / siteBefore shipment
Installation details and snag processContractorBefore installation

How SANTERSON Assembles This Package

We are a China-based manufacturer of furniture and building materials, supplying cabinetry alongside the rest of the interior fit-out since 2008. For a shaker kitchen enquiry, our team prepares dimensioned drawings from your layout, confirms profile and paint build against samples, and schedules hardware as part of the same order. Our Light Grey Shaker Style Kitchen Cabinets are built to project-specific dimensions with selectable door colour, surface finish and internal storage layout.

Because cabinetry usually travels with other joinery on the same job, we can coordinate wardrobes, panelling, doors and interior fixtures under one order, which keeps finish schedules and crate marking consistent across the whole house or hotel floor. If you want a submittal reviewed before committing, send us your drawings and room list.