A classic wooden hinged wardrobe rarely fails on the drawing. It causes trouble at approval stage, when a project team signs off a door style, a timber tone and a run of dimensions that were never reconciled with the room, the trade sequence or the hardware schedule. For villas, serviced apartments and hospitality rooms, built-in joinery is one of the few elements that cannot be quietly swapped after handover, so the sign-off meeting is where risk should be removed. Below is the confirmation list we ask clients to close out before they release a wardrobe package for production.

1. The opening dimensions, taken on site and not from the drawing

Hinged wardrobes are made to the finished line of the room, so every confirmation starts with what the site will actually deliver. Before approval, ask which level is the finished floor, who is setting out that level, and whether wall finishes, skirting and any ceiling bulkhead are included in the dimensions you have been given.

  • Width, height and depth measured at three points each, with the smallest dimension governing the carcass and the tolerance recorded on the shop drawing.
  • Out-of-plumb and out-of-square walls noted, plus how the scribe or filler panel is resolved rather than left to the installer.
  • Obstructions declared: switch plates, air grilles, sprinkler heads, skirting, radiator pipework, door reveals and any structural column inside the run.
  • Confirmation that the measurement was taken after wet trades have finished, or a written note of what will still move.

2. Door style, panel profile and finish sample

"Classic" means different things to different designers, and this is the most common source of disputes at sign-off. Fix the door construction on paper: a raised panel, a recessed panel, an arched profile or a moulded decorative panel each reads differently once lit in a bedroom, and each carries a different cost.

Then approve a physical sample, not a digital render. Timber species, grain cut, stain tone and lacquer sheen all shift under warm guest-room lighting, and a single sample board that combines the door profile with the selected finish answers more questions than three separate approvals. Our Classic Wooden Hinged Wardrobes are supplied as made-to-measure pieces where the material, finish and layout are specified per project, so the sample you approve becomes the production reference. Related profiles in the same family, such as Classic Paneled Solid Wood Wardrobes and Walnut Solid Wood Wardrobes, let a project keep one door language across bedrooms, dressing rooms and corridors.

3. Hinge type, swing clearance and door weight

Hinged doors need clear swing space that sliding doors do not. Confirm the arc against the bed, the opposite wall, the bathroom threshold and any vanity or bench in front of the run. A wardrobe that looks efficient on a plan can become unusable once the loose furniture lands.

  • Hinge specification: concealed or visible, cup diameter, mounting plate type, soft-close or standard, and whether the hinges are supplied with the carcass or bought locally.
  • Door weight and height limits per hinge set, and whether an additional hinge or a stabiliser is required for tall panels.
  • Opening sequence for paired doors and any corner unit where two runs meet at 90 degrees.
  • Handle or knob choice, its projection, and clearance from adjacent panels when the doors are closed.

4. Interior layout against the actual wardrobe use

The interior should be designed from the occupant's storage pattern, not from a default template. A guest-room wardrobe and a full-time family dressing room carry very different loads, and hospitality projects benefit from standardising one layout across room types so that replacements remain consistent.

Item to confirmWhy it matters at approval
Hanging heightsLong-garment and double-hang positions must be set before the carcass is cut; retrofitting means a new panel.
Shelf spansWide shelves sag under folded linen; span width and thickness should be stated on the drawing.
Drawer count and rail typeSoft-close rails, load rating and drawer front height affect both cost and daily feel.
Shoe, luggage and accessory zonesLuggage stored above or below hanging space needs a clear dimension, not an assumed one.
LightingCabinet lighting needs a cable route, a switch position and a driver location agreed with the electrical contractor.
Doors versus open storageOpen sections change dust control and housekeeping load, which matters in hospitality operations.

5. Material specification written clearly enough to price

A sign-off that says "oak, natural finish" is not a specification. Ask for the substrate, the surface material, the edge treatment and the finish system as separate lines. This is what allows two quotations to be compared honestly, and it protects the project when a substitute has to be proposed.

  • Carcase substrate and its thickness, plus moisture resistance where the wardrobe sits against a wet wall or in a basement level.
  • Door construction: solid timber, engineered board with veneer, or a moulded panel. Each behaves differently in heated and air-conditioned rooms.
  • Veneer cut and grain direction across the run, stated explicitly if doors are to be book-matched.
  • Edge banding or solid lipping on visible edges, and the colour match tolerance.
  • Finish system, sheen level and the number of coats, with a signed sample retained by both parties.
  • Back panel thickness and fixing method, which affects how well the unit squares up on an uneven wall.

6. Interface with flooring, ceiling and adjoining joinery

Wardrobes rarely stand alone. Where a run meets the flooring line, a skirting junction or a ceiling reveal, the detail has to be drawn before either trade commits. Confirm who supplies and installs the scribe, whether the flooring runs under the carcass or abuts it, and whether the wardrobe is designed as a built-in that fills the opening or a freestanding unit with a shadow gap.

Where the design extends into hallways and dressing areas, matching Classic Panel Hinged Doors should be specified at the same approval so that door leaves, architraves and wardrobe fronts share one finish batch. The same logic applies to custom built-in kitchen cabinets in an adjoining suite or kitchenette: one panel profile, one paint or lacquer batch, one set of hardware.

7. Packaging, access route and delivery sequence

A made-to-measure wardrobe is only as good as the route it travels from the factory to the room. Confirm before production that the assembled or panelised size will pass the lift, stairwell, doorway and corner it must negotiate on site.

  • Packaging specification and piece count per package, with a packing list keyed to room numbers.
  • Access survey: lift dimensions, stair turns, corridor widths and any protection needed for completed finishes.
  • Delivery window aligned with the joinery installation slot, not simply the earliest available date.
  • For international packages, freight mode, documentation set and who handles customs clearance at destination.

8. Installation responsibility and snag process

Decide at approval whether the local contractor or the supplier's team fixes the units, and what "complete" means: scribes cut, doors adjusted to even gaps, hardware functioning, protective film removed and panels cleaned. Write the acceptance criteria into the order so that a snag list at handover has something objective to measure against.

9. Spares, consistency and future replacement

Hospitality and multi-unit residential projects should confirm how a damaged door or shelf is replaced years later without a visible mismatch. Ask which finish batch was used, whether spare panels can be produced to the same specification, and whether hardware is a standard item available locally or a matched component that must come from the original supplier.

Approval rule of thumb: if a drawing cannot answer how the wardrobe meets the floor, how the doors swing with furniture in place, and what happens when one door is damaged in year three, it is not ready for sign-off.

A short pre-production checklist

  • Site dimensions verified after wet trades, with tolerances recorded.
  • Door profile and finish sample physically signed off.
  • Hinge schedule, door weight and swing clearance confirmed against the furniture layout.
  • Interior layout agreed per room type, including lighting and cable routes.
  • Material specification written as substrate, surface, edge and finish lines.
  • Interfaces with flooring, ceiling and adjoining cabinetry drawn, not assumed.
  • Pack sizes checked against the on-site access route.
  • Installation scope and snag criteria written into the order.
  • Spares and replacement route agreed for the operating life of the asset.

SANTERSON supplies built-in joinery as part of a wider package of built-in furniture, cabinetry and interior finishes, with made-to-measure sizing and finish options specified for each project. Under our turnkey project solutions, one team handles design coordination, production, freight and site follow-up, so the wardrobe, the doors and the adjoining cabinetry come from a single specification rather than three separate suppliers. That single point of contact is what keeps the hinge schedule, the finish batch and the delivery sequence in one document instead of three.

Send us the room dimensions, the door profile you are working to and the target handover date.

We will return shop drawings, a material and finish schedule, and a production plan you can take into your approval meeting. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the enquiry form to start a project file.