A wardrobe submittal is the document package a buyer, contractor or designer reviews before production starts. For Two Tone Hinged Wardrobes, the package has to do more than show a nice elevation drawing. It has to prove that two different finishes meet cleanly on the same door, that every opening dimension was measured against the actual room, and that the interior layout matches how the space will really be used. Below is the checklist we work to when preparing these packages for residential and villa projects.
A two tone wardrobe fails in two places: where the two finishes meet, and where the carcass meets an out-of-square wall. A good submittal answers both before a single panel is cut.
1. Confirmed opening dimensions, not nominal room sizes
Our two tone hinged wardrobes are made-to-measure, so the submittal must start from field-verified openings rather than architectural room dimensions. Include for each unit:
- Width, height and depth at three points across the opening (top, middle, bottom), because walls are rarely parallel.
- The finished floor level and finished ceiling or soffit level, with the floor build-up noted if the screed or covering is not yet laid.
- Around the opening: skirting, architraves, cornices, recesses, columns and any door or window swing that restricts a hinged door's arc.
- Obstructions to plan around: switches, sockets, thermostat panels, sprinkler heads, lighting downlights and return air grilles.
- Tolerance for out-of-plumb and out-of-square walls, with the scribing or filler-panel method you intend to use on site.
State clearly which figures are as-built measurements and which are design dimensions still subject to trade work. This single line prevents most on-site disputes.
2. The two-tone finish schedule, stated door by door
The defining feature of this product is the pairing of two finishes, and vague wording such as "light and dark combination" cannot be manufactured or inspected. The finish schedule in the submittal should specify, for every door and visible panel:
- Which finish applies to which element — door leaf, frame, carcass exterior, end panel, plinth, interior surfaces.
- The exact finish reference: board or substrate type, surface material and colour or decor code, and gloss level (matte, satin or high gloss).
- Grain direction on wood-look and veneer finishes, drawn on the elevation. This is where two tone schemes most often look wrong in photographs.
- The transition detail between the two tones: butt joint, shadow gap, or a metal or timber trim strip, with a dimensioned detail.
- A physical sample reference, and which party signs it off before production release.
Because our wardrobes are offered with material and finish options rather than one fixed specification, the submittal is where the option list gets narrowed down to one approved combination. Anything left open in the document will be decided on site, at someone else's cost.
3. Door layout and hinge schedule
Hinged doors behave differently from sliding doors once the room is in use, so the submittal must show the swing, not just the front elevation:
- Door count, leaf widths and which leaf is the active one on each pair.
- Hinge side and hand for every leaf, marked on the plan and elevation together.
- Clearance needed for full door swing against the bed, the opposite wall and any passage route.
- Hinge type, load rating and quantity per leaf, plus soft-close provision where required.
- Handle or pull specification and its position, checked so it does not clash with an adjacent leaf or a wall return.
If the design mixes hinged wardrobes with other built-in furniture in the same bedroom, show them on one coordinated drawing so reveals, plinth heights and shadow lines match across the joinery package.
4. Interior layout matched to actual storage use
Two tone hinged wardrobes in this range are specified with a layout tailored to the project, so the submittal should include an interior elevation per unit showing hanging zones, shelf spans, drawers and any tall or short section. Practical points worth recording:
- Rail heights set by garment type: long coats and dresses need significantly more drop than shirts; double rails suit shorter items.
- Shelf span limits for the chosen board thickness — a wide open shelf that looks clean on a drawing can sag once loaded.
- Drawer bank position, keeping everyday items between roughly hip and shoulder height and deeper storage low or high.
- Ledger or filler widths where the carcass meets a wall, so drawers and doors clear the reveal.
- Interior finish level. Bedroom interiors are opened daily and should not be left as raw substrate if the buyer will see them.
5. Construction and installation detail
Include the sections that decide whether the unit sits true after handover:
- Carcass construction and panel thickness, plus how units are joined in a run.
- Levelling method at the floor, and whether the plinth is scribed to the finished floor.
- Fixing method to wall or ceiling substrate, with the substrate type confirmed by the site team.
- Back panel detail and clearance for skirting behind the unit.
- Integrated lighting provision if used: cable routes, transformer location and access for maintenance.
6. What else belongs in the package
| Item | Why reviewers ask for it |
|---|---|
| Signed shop drawing set | Plan, elevations, interior elevations and details, all on one revision number. |
| Approved finish samples | Ties the drawing to a physical reference both parties can inspect. |
| Bill of quantities by unit | Prevents missing leaves, rails or end panels at delivery. |
| Packaging and handling note | Two tone door faces are the parts most easily damaged in transit. |
| Delivery sequence and room-by-room labelling | Saves installers opening every crate to find the right leaf. |
| Site readiness requirements | States which trades must be finished before installation can start. |
| Inspection and snag list | Gives both sides one agreed standard for handover. |
Where the wardrobe is part of a wider fit-out, we prepare these documents together with the rest of the joinery under our interior design services, so drawings, production coordination and on-site guidance follow one revision trail instead of several.
Three questions a reviewer should ask before approving
- Does the finish schedule name each tone by reference and show where it stops and the other begins?
- Are the dimensions field-verified, with out-of-square walls accounted for in the fixing detail?
- Is the interior layout drawn for this room's storage needs, or copied from a standard module?
If any answer is no, return the submittal before release. Corrections at drawing stage are administrative; corrections after installation involve new panels.
Send us your drawings and opening dimensions
Share the room elevations, measured openings and the finish direction you are working to, and we will return a made-to-measure two tone hinged wardrobe specification with interior layout and finish schedule for your review before production.