Clear glass with a slim aluminium frame reads light and orderly in a bedroom, but it also exposes everything inside the cabinet. That is exactly why an installation plan matters more for this type than for a solid-door wardrobe: a plumb wall, a level base and a settled interior layout are decided before production starts, not corrected on site. The checklist below covers what a buyer, contractor or project manager should have agreed with the manufacturer before a single panel is made.

Why the Plan Comes Before Production

Wardrobes of this kind are made to measure for each opening. Frame profiles, glass sizes and internal fittings are cut to the dimensions supplied at order confirmation, so a measurement error or a late change to the internal layout is expensive once manufacturing has begun. A clear-glass front also removes the visual excuse for untidy storage: shelves, hanging rails and drawers need to be planned as a visible composition, because they will be seen from across the room.

For villa and apartment projects in Australia and elsewhere, SANTERSON supplies these cabinets under its Clear Glass Aluminum Frame Wardrobes line, part of the wider Glass & Aluminum Frame Wardrobes collection. Each unit is specified to the project: sizing is made to measure, materials and finishes are selected per project, and the internal layout follows the drawings agreed for that space.

1. Survey Data the Manufacturer Needs on Site

Send measured information, not estimates. A workable survey record includes:

  • Width, height and depth at three points each (top, middle, bottom), because walls are rarely consistent over a full wardrobe run.
  • Floor level across the run, plus the finished floor height if tiling or flooring is still to be laid.
  • Position of skirting boards, architraves, light switches, sockets and any recessed services that the carcass must clear.
  • Ceiling condition: a flat ceiling, a sloped ceiling, exposed services or a bulkhead that changes the top closure detail.
  • Door and corridor widths, lift dimensions and stair geometry on the delivery route to the room.

Where the wardrobe sits beside a window, record the opening direction of the window and any handle projection. Aluminium-frame glass doors need clearance to travel or swing; that clearance is a survey item, not an on-site improvisation.

2. Frame, Glass and Finish Selections

The plan should state what is being ordered in the same words the quotation uses. Within this collection there are close relatives that look similar on a mood board but differ in front glazing: Frosted Glass Aluminum Frame Wardrobes for a soft, obscured front, and Smoked Glass Aluminum Frame Wardrobes where a tinted panel is wanted. Recording the chosen front in writing prevents the wrong glazing being produced for a batch.

DecisionWhat to record in the plan
Frame finishColour and surface of the aluminium profile, and whether the frame matches or contrasts with other joinery in the room.
Glass typeClear, frosted, smoked or ribbed front; any film backing for privacy in guest rooms.
Door operationHinged, sliding or open configuration, and the clearance each operation requires.
Handle detailIntegrated profile handle, recessed pull or external handle, with side of opening marked on the drawing.
Interior finishCarcass and shelf decoration, edge treatment and any integrated lighting channel.

3. Internal Layout Drawn for the Actual Wardrobe Contents

Glass fronts make internal organisation part of the interior design. Before ordering, set out:

  • Hanging zones split by garment length: short-hang sections with shelving above, long-hang sections for coats and dresses.
  • Drawer banks positioned at comfortable height rather than pushed to the floor.
  • Shelf spans kept reasonable for books and folded stacks; long unsupported spans sag over time.
  • A dedicated place for items that will be on show, since everything behind clear glass is visible.
  • Lighting points or lighting channels agreed early, so wiring is routed before the carcass closes.

4. Interface Details with Walls, Floor and Ceiling

The plan should show how the unit meets the building. Specify the scribe or filler panel for out-of-plumb walls, whether the carcass sits on a plinth or is set into a prepared recess, and how the top is closed against the ceiling. Decide which trade prepares the opening and which installs the wardrobe; on most projects this is the point where responsibility gaps appear.

If the design continues across the room — wall panelling, a media wall or an adjoining vanity run — include those items in the same drawing set so profiles and reveal lines align. SANTERSON supplies wardrobes alongside interior fixtures and cabinetry for the same project, which keeps finishes and profile details coordinated instead of matched by eye on site.

5. Logistics, Sequencing and Site Readiness

A glass-fronted wardrobe is a late trade item. The plan should fix the installation date against wet trades, flooring and painting, because dust and moisture are both unwelcome during assembly. State who receives the shipment, where panels are stored before fitting, and how access will be protected. For international orders, SANTERSON handles freight forwarding, export paperwork and door-to-door delivery under its logistics and door-to-door delivery service, with shipment tracking arranged by the project team.

Confirm on the plan when the site is ready: floor covering complete, walls painted or finished, services tested, and a clear working area in the room. A wardrobe delivered to an unfinished room waits in packing, and glass panels waiting in a dusty space create avoidable snags.

6. Installation Method and Handover Record

Ask for the fitting sequence in writing: base levelling, carcass alignment to wall lines, door hanging and adjustment, hardware setting, then glass and frame cleaning. A practical handover record lists door adjustments made, any snags closed out, and the finish condition accepted by the client. SANTERSON provides installation and after-sales support as part of its project service, with inspection and snag closure recorded at handover.

A Pre-Order Checklist Worth Signing Off

  • Three-point measurements taken for width, height and depth, with floor levels noted.
  • Front glazing, frame colour and door operation named on the drawing and quotation.
  • Internal layout drawn to garment lengths, drawer heights and display items.
  • Scribe, plinth and top-closure details agreed with the main contractor.
  • Installation date fixed after flooring, painting and testing are complete.
  • Delivery route, storage area and receiving contact confirmed.
  • Handover and snag process defined before production starts.

Planning the Wardrobe as Part of the Whole Fit-Out

Where several bedrooms are involved, or where wardrobes sit in the same line as kitchen cabinetry and vanity units, treat them as one package. Grouping the joinery under a single supplier keeps profile sizes, edge details and colours consistent, and puts one team accountable for survey, production and fitting. The turnkey project service covers design coordination, manufacturing, logistics and installation in one sequence, which is how villa projects in Sydney, Melbourne and Perth are typically handled.

Send the survey drawings and the intended internal layout with your enquiry. The manufacturer can then confirm dimensions, glazing and hardware against the actual opening rather than a generic size, and quote from the same specification that will be installed.

Frequently Asked Questions

Can clear glass wardrobes be used in a bedroom with limited daylight?

Yes. A transparent front reflects what light there is and keeps the room feeling open, provided the interior layout is tidy. If storage will be visible and informal, frosted or ribbed glazing in the same frame system hides the contents while keeping the aluminium profile detail.

Do sliding and hinged glass doors need different preparations?

They do. Sliding configurations require a true, level track line and enough floor or headroom clearance for the panels to pass; hinged doors need clear swing arcs and correct hinge loading for the panel weight. Record the chosen operation on the drawing so the opening is prepared for it.

What happens if a wall turns out to be out of plumb after the survey?

Scribe and filler panels absorb normal variation, which is why they are specified in advance rather than improvised. If the deviation exceeds what the detail allows, the manufacturer re-issues the affected panel to the corrected dimension; that is why final measurements should be taken after the wall finishes are complete.

SANTERSON — furniture and building materials manufacturer since 2008, supplying custom wardrobes, cabinetry and interior fixtures for villa, hospitality and office projects worldwide.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquire about made-to-measure wardrobe packages for your project