A wardrobe quotation goes wrong long before the first panel is cut. It goes wrong on the day the specification is written, when "high gloss" is left as a single word and every supplier fills the gap with their own habit. This guide sets out the fields that belong in a High Gloss Lacquer Wardrobe specification, so the drawings, the price and the delivered product all describe the same piece of furniture.
Why a vague finish line costs money
Lacquer is a finishing system built up in layers over a machined substrate, which means two wardrobes can carry the same words on a schedule and look completely different on site. One supplier sprays a single gloss coat; another builds primer, colour and clear coats, then polishes the surface. Both quote "high gloss lacquer". Only one will match the sample you approved.
The practical fix is not more correspondence later but fewer open questions now. A specification that states the substrate, the build-up, the sheen band, the edge treatment and the hardware turns a comparison of prices into a comparison of like for like.
Field 1: The carcass and door substrate
Lacquer needs a stable, flat core. State what the doors and carcase panels are made from, not just that they are "painted". For a made-to-measure wardrobe, ask the supplier to confirm the board type and thickness for each component separately, because the door, the cabinet box and the shelves wear differently.
- Door substrate: state the board type and thickness, and require the surface to be flat enough that gloss reflection does not show waviness under raking light.
- Carcass panels: state thickness and whether the interior faces are lacquered, laminated or left sealed. Interior finish is where budgets quietly move.
- Shelves and drawers: confirm load rating for shelf spans and the drawer construction, since a heavy hanging zone loads the sides, not the doors.
Field 2: The lacquer build-up and sheen band
Write down the coating sequence rather than the marketing name. A usable line reads: substrate sealing, primer, colour coat, clear topcoat, finishing. Then fix the sheen with a measured band instead of the word "gloss", because high gloss ranges from bright mirror to soft shine, and a project that mixes wardrobes across several rooms needs one band, not several interpretations.
Colour reference
State the colour source: a recognised colour system reference, a RAL code, or a numbered sample from the supplier's own lacquer range. Whichever you choose, record it once and reuse that same string in the drawings, the purchase order and the inspection sheet.
Field 3: Edges, profiles and panel construction
High gloss surfaces fail at the edges long before the flat faces do. Specify how door edges are finished — rounded, chamfered or square — and whether the edge is part of the lacquered build-up or a separate banding material. For panelled or shaped door designs, confirm which parts are machined from solid stock and which are routed boards, since shaping changes both cost and movement behaviour.
- Edge radius: state it in millimetres and show it on the detail drawing.
- Handle choice: handleless groove, integrated pull or applied handle. Each one changes the door edge detail.
- Glass and inserts: if a design combines lacquer with glass panels, name the glass type, tint and framing for each door.
Field 4: Layout, dimensions and interface tolerances
A specification that names only external size is not a specification. Wardrobes meet floors, ceilings, skirtings, doors and services, and every one of those junctions needs a recorded decision.
| Item to record | Why it belongs in the document |
|---|---|
| Width, height and depth per unit, plus which wall each sits on | Made-to-measure units are produced to a set of site dimensions, not a nominal size. |
| Floor and ceiling level variation, and how scribing or filler panels absorb it | Uneven slabs are the most common cause of gaps at the top and bottom run. |
| Skirting and architrave treatment behind and beside the unit | Decide whether the wardrobe overrides, notches around or stops short of the trim. |
| Door swing or slide clearance in front of the unit | Hinged doors need clearance to open; sliding doors need track depth and overlap. |
| Lighting, sockets and switch positions relative to the carcass | Cut-outs must be drawn before the panels are produced, not on site. |
| Interior configuration: hanging zones, drawers, shelves, mirror or ironing fittings | Interior parts are priced per item and change the panel schedule. |
Field 5: Hardware schedule
Name hinges, slides, handles, lights and any mechanism by brand and model, or state an approved equivalent rule. Gloss doors are heavy; hinge count and rating follow from door width and weight, so the hardware line should be tied to the door schedule rather than left to the fitter.
Field 6: Packaging, delivery and inspection
Gloss panels scratch at the corners. Specify edge protection, panel wrapping, pallet arrangement and carton marking by unit number, then tie that marking to the room-by-room schedule so the site team can sort deliveries without opening everything.
- Inspection standard: define what is rejected — surface runs, dust inclusion, colour mismatch against the approved panel, edge chips.
- Spares and touch-up kit: agree whether a repair kit ships with the order for on-site adjustments.
- Replacement terms: state how a damaged panel is re-produced and shipped, since a single replaced door must match an existing batch.
Field 7: The sign-off block
Close the document with a table that repeats the essentials — project, unit reference, substrate, lacquer system, colour and sheen reference, edge detail, hardware, quantity, approved sample number, revision date. When two parties sign that block, there is one agreed object.
A pre-order check you can paste into your own sheet
- Substrate and thickness stated for doors, carcass and shelves separately
- Lacquer build-up written as a sequence, not a trade name
- Sheen band and colour reference recorded identically in every document
- Signed, dated sample panel referenced by number
- Edge radius, edge method and handle detail drawn
- Site dimensions with level variation and scribing method noted
- Glass, inserts and interior fittings itemised per unit
- Hardware named to brand and model
- Packaging, marking and inspection standard defined
- Revision control and signature block included
How a manufacturer writes this with you
SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, and High Gloss Lacquer Wardrobes are produced to project-specific dimensions, layout and finish rather than a fixed catalogue size. Send us your drawings or a room sketch with the fields above filled in as far as you can, and we will confirm what each one means in production terms before pricing.
Our Custom & OEM Service covers bespoke finishes and prototyping, while the wider One-stop Solution carries the same specification through production, door-to-door delivery, installation and after-sales support. If your project also needs matching Matte Lacquer Wardrobes in the bedrooms or lacquer kitchen fronts elsewhere in the same building, we can hold one finish standard across them.