Sliding storage panels look simple on a drawing and complicated on site. The panel face, the track, the opening sequence and the storage behind it are usually bought by different people at different times, which is exactly how snags appear at handover. This guide sets out what a procurement brief for Santerson Sliding Storage Panels should contain, so the quotation you receive matches what your site team can actually install.

What the product actually is

Santerson Sliding Storage Panels sit in the Integrated Storage Walls collection. The published listing describes a configurable wall system: finish, layout and dimensions are specified per project, with made-to-measure sizing and a choice of materials and finishes. There is no fixed catalogue size to quote against, which means the brief you send determines the price, the lead time and the fit.

Two practical consequences follow. First, an enquiry built on a room name alone cannot be priced; it needs openings, heights and a layout intent. Second, because the panel system is made to measure, it should be ordered after the surrounding finishes are dimensioned, not before. Flooring levels, ceiling set-downs and any adjacent joinery all change the panel drop.

Why these panels appear in project scopes

On villa and hospitality fit-outs, the wall is usually asked to do more than one job. A bedroom wall may need to hold hanging storage while presenting a clean, uninterrupted face; a living room wall may need to hide media and equipment behind a decorative surface. Sliding panels answer that brief better than hinged doors where circulation space in front of the wall is tight, because the panel travels along the wall instead of swinging into the room.

Where the requirement is closer storage behind a wardrobe-style opening, Santerson Closet Sliding Panels are usually the better starting point. Where the wall has to divide a space as well as store things, look at Santerson Partition Sliding Systems. Where the brief calls for full-height storage with no sliding action, Santerson Full Height Storage Walls covers that case. Naming the right collection in the first enquiry saves a round of re-quoting.

The eight items a complete brief must state

ItemWhat to write downWhy the supplier needs it
Openings and levelsFloor-to-ceiling height, finished floor level, ceiling set-down, width of each bay, position of columns and skirtingMade-to-measure panels are cut to the finished opening. Unstated set-downs become site trimming.
Panel count and stackingHow many panels, which direction they stack, where the parked position isDetermines track length, panel overlap and the clearance needed at the resting end.
Track and hardwareTop-hung or floor-guided, recessed or exposed track, handle or profile pull, any soft-close requirementHardware choice affects floor finish continuity, load rating and servicing access.
Substrate behind the panelsWhat is stored: hanging rail, shelves, drawers, media equipment, niche lightingStorage internals set panel weight, depth and whether ventilation or cable routes are needed.
Finish and edge detailPanel face material and finish, edge profile, how the panel meets wall, ceiling and floorEdge details are where design intent is lost if they are not drawn before production.
Interface tradesWho sets out the opening, who supplies the track support, who makes good after installationPrevents the classic gap in responsibility between joinery, drywall and flooring.
Quantities by typeEach unique configuration listed separately with a quantity, not one combined lineConfigurable systems are priced per configuration; combined lines produce provisional numbers.
Delivery and accessShip-to address, delivery method, lift or stair access, storage area on siteOversized panels need an unpacking and staging zone; without one, damage risk rises.

A short worked example

Take a villa bedroom wall, 3.4 m floor to ceiling and about 2.8 m of usable width, with hanging storage on one side and a niche display on the other. A workable brief would read: three sliding panels, top-hung track, stacked to one end, finished floor level confirmed before setting out, panel face in a matte finish matching the joinery schedule, edge detail drawn as a shadow gap at the ceiling and a flush trim at the floor. That single paragraph lets a manufacturer return a configuration, a hardware set and a price that holds.

The same wall described as "sliding wardrobe wall, master bedroom" produces a provisional number, then a variation order once someone measures on site.

How Santerson's services fit the procurement route

Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008. For a panel wall, that single-contract model matters because the same supplier can carry the storage internals, the adjacent joinery and matching finishes, which keeps the material and finish schedule consistent across rooms.

The published service route runs through interior design services for space planning, layouts and 3D renderings; custom and OEM service for bespoke finishes, materials and prototyping; logistics and door-to-door delivery covering freight, packaging and customs paperwork; and installation and after-sales support for fitting, inspection and snags. The cooperation steps the site describes are straightforward: brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up.

Read that as a sequencing rule rather than a marketing list. Design intent is agreed before pricing, and pricing is confirmed before production starts. Panel systems ordered in the wrong order are the ones that arrive at the wrong size.

What to confirm in writing before you place the order

  • The exact dimensions of each opening, signed off against the current drawing revision.
  • Which party supplies and installs the track support and the structural fixing behind it.
  • The specified panel face material and finish, with a sample reference rather than a colour name.
  • Incoterms, ship-to address and delivery access for your site; import terms and duties vary by project and country and should be confirmed per order.
  • What the warranty covers and what is excluded, as stated in the contract documents.

Common specification mistakes to avoid

  • Ordering against structural rather than finished dimensions. Panels are made to measure; the measurement must include floor and ceiling finishes.
  • Leaving stacking direction to site. A reversed stack changes the track and can block a door swing.
  • Treating hardware as an accessory. Track type and load rating should be in the specification, not chosen at installation.
  • Mixing collections in one line item. Sliding storage panels, partition systems and full-height walls are different configurations and price separately.
  • No snag list for interfaces. Panel faces get signed off; the gaps around them do not, unless the interface scope is written down.

Turning the brief into a quotation

A procurement brief for sliding storage panels does not need to be long. It needs openings measured to finished levels, a panel count and stacking direction, a hardware decision, a stated finish with a sample reference, quantities listed per configuration, and clear responsibility for the trades on either side of the installation. Send that and the returned quotation can be compared like for like across suppliers.

Santerson's project team works from drawings and schedules on villa, hotel and office scopes. Share your panel schedule, the room-by-room openings and the finish schedule, and the configuration can be confirmed before production begins.

Send us your panel schedule. SANTERSON supplies sliding storage panels and integrated storage walls for villa, hospitality and office projects, with custom sizing, matched finishes and door-to-door delivery. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com to start a quotation, or send your enquiry through the Santerson contact page.

Explore the wider range at Santerson products.