A double vanity is one of the few bathroom items where a wrong measurement turns into a re-order rather than a quick fix. Before you send an enquiry about a Santerson Double Vanity, gather the information below. It lets our team quote a configuration instead of asking three follow-up rounds, and it keeps production drawings aligned with what your site can actually receive.
Start With the Room, Not the Product
Our vanities are made to measure, so the space drives everything that follows. Send us a simple dimension sketch rather than a photograph of a showroom model, and mark:
- The clear wall length available for the unit, plus ceiling height if you want a tall mirror cabinet above it.
- Where the existing soil pipe, waste outlet and water supply points sit, measured from a fixed corner.
- Whether the wall is stud, brick or block, since this determines how a wall-hung carcass is fixed and braced.
- Door swing and traffic direction, so basin and drawer fronts do not clash on opening.
If you are deciding between configurations, our Santerson Floating Vanity suits spaces where you want the floor visible and clear of the carcass, while a floor-standing layout carries heavier stone tops without additional wall support.
Confirm the Countertop and Basin Combination Early
Countertop decisions change lead time more than any other choice, because slab availability and cut-out work are project specific. Tell us which of these three routes you want:
- A Santerson Double Basin Countertop, where we set basin spacing to match your two seating positions and your tapware reach.
- An Integrated Countertop Vanity, where the top and basins are formed as one surface with no joints to seal.
- A separate top paired with an Undermount Basin or an above-counter Vessel Basin, which changes the tap and waste heights you need.
Send the finish reference you want from our Stone & Marble Surfaces range, or your own stone if the project already has a slab approved. If you have a sample, note its code and thickness instead of describing the colour in words.
Fix the Electrical Side Before Production
Lighting and mirror storage are wired into the carcass, so late changes mean cutting into a finished unit. Specify:
- Whether you need an LED Mirror Cabinet, and if its switch sits at the vanity or on the room circuit.
- The fitting type from our Vanity Lighting range, with the mounting height you want above the mirror.
- Any Integrated Cabinet Lighting inside drawers or niches, and where the driver should be accessible for servicing.
- If a Towel Warmer & Rail shares the circuit, so loads are checked together.
Tell us the destination country and its supply voltage in the first message. Electrical specifications and bathroom suitability are confirmed per project for each configuration, and this single line saves a revision cycle.
What Your Enquiry Should Contain
| Item | Why we need it |
|---|---|
| Quantity per bathroom type | Sets whether units are produced as one batch with identical fixings and spares. |
| Dimension sketch with fixed reference points | Confirms made-to-measure sizing before drawings are issued. |
| Carcass finish and door style preference | Lacquer, veneer and laminate options carry different sample steps. |
| Tapware you intend to use, with reach and hole count | Determines pre-drilling and waste placement in the top. |
| Storage layout: drawers, shelves or pull-out hampers | Interior fittings are built into the carcass, not added on site. |
| Delivery address and access notes | Freight mode and packaging follow site access, lift size and dock availability. |
| Target installation window | Production slots are planned backwards from your fit-out date. |
How the Enquiry Moves Into Production
Once we have the above, our team returns a specification sheet and quotation for your confirmation. After details are signed off, the unit enters production with the rest of your order under our one-stop furniture and building materials scope, so vanities, cabinetry, wall finishes and fixtures can ship on one coordination plan instead of several separate suppliers. Freight is arranged by sea, air or rail with the paperwork handled for you, and installation and after-sales support covers inspection and snags at handover.
Where a project needs a non-standard width, an unusual basin pitch or a finish matched to joinery already on site, that is handled as custom work rather than a catalogue variant. Send the drawing and we will confirm what is feasible in production before you commit the layout.
Quick pre-send check. Dimensions taken from finished wall faces, not structural shells. Basin spacing agreed against actual elbow clearance, not a plan symbol. Voltage and supply country stated. Stone finish reference attached. Tapware model named. Six lines, and the quotation that follows is the one you build to.
Related Bathroom Collections Worth Checking Together
Double vanities rarely sit alone, and coordinating them with adjacent items avoids mismatched finishes across the same room. Browse bathroom sanitary fixtures for ceramics and showers that share your colour and metal palette, and check our Single Vanity line for the secondary bathrooms on the same floor plan so all rooms read as one specification.
Send your sketch and finish references to the contact listed on our contact page, and we will come back with a configuration sheet you can hand straight to your installer.