A long swim spa is not a purchase you make from a brochure page alone. Before a quotation can be prepared for Outdoor Swim Spa WS-S12, the supplier needs to know where it will stand, how it will be used and which equipment the configuration should include. Sending that information in your first message saves a round of drawings and revisions, and it lets the factory confirm what is standard, what is optional and what has to be checked against your site.
1. The Site: Dimensions, Access and Support
The catalog lists WS-S12 at 11740 × 2200 × 1470 mm, which makes the footprint the first item on your list. Note the length in millimetres against your own drawing, not just the marketing photo, and check the path the shell will travel from the delivery vehicle to the final position: gate widths, turning radii, overhead cables and stairwells all matter for a unit of this size.
- A dimensioned plan of the terrace, deck or garden area, with the spa outline drawn to scale.
- The finished ground level and what sits beneath it — a reinforced slab, a timber frame, piers or a partially recessed pit.
- Clear access routes for unloading and positioning, including whether a crane or forklift is available on site.
- Distances to the nearest power supply, drainage point and water top-up source.
If the spa will sit on an upper level, a balcony or a rooftop, share the structural information with your engineer before you ask for a price. The supplier can advise on the product's support requirements; local structural adequacy is your engineer's call.
2. How the Spa Will Actually Be Used
Two households or two hotel sites can take the same shell and use it very differently. Say plainly in your enquiry whether the priority is daily lap swimming, hydrotherapy and relaxation, or a mix of both. The WS-S12 catalog entry shows water jets, LED lighting and ozone as features, with 73 jets, one control system, two water pumps and one filter pump listed in the specifications.
This is also where model selection needs care. The closely related Outdoor Swim Spa WS-S12-T carries the same catalog shell size but adds a swim training system to the listed features. If counter-current swimming is your main purpose, ask which variant or which configuration delivers it, rather than assuming the base model does.
3. Power Supply and Electrical Details
The specifications for WS-S12 show a total power figure of 7.65 kW. Treat that number as a starting point for the conversation with your electrician, and confirm it again for the exact configuration you order, because options change the load.
- Supply type on site: single-phase or three-phase, voltage and frequency.
- Available circuit capacity near the installation position, and where a dedicated circuit and isolator can be run.
- Whether the electrical work is included in your scope or carried out by a local licensed electrician to local wiring rules.
Send a photo or one-line sketch of the distribution board if you are unsure. It answers more than a written description usually does.
4. Which Options You Want Quoted
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so list what you want and let the supplier confirm what fits WS-S12.
| Heating | A heat pump and insulation are the options to discuss if the spa will be used outside the warm months. Tell the supplier the season and the water temperature you expect, not just your location. |
| Water treatment | Ozone is listed as a standard feature; UV sterilisation and sand filtration are options to confirm for your configuration. |
| Access | Steps and internal seating affect how children and older users get in and out. Specify this early, since it changes the deck edge detail. |
| Controls and lighting | One control system and LED lighting are listed; state any preference for control placement if you want a different arrangement. |
Specification figures above come from the catalog page for this model. Confirm them for the configuration you order, since options and revisions change what is included.
5. Delivery Route and Site Practicalities
An oversized shell crosses borders differently from a carton of furniture. Tell the supplier your port of entry, whether the site takes a full container, and who handles customs clearance locally. SANTERSON's logistics and door-to-door delivery service covers freight arrangements and documentation, but import duties, local permits and site preparation remain your side of the arrangement — ask for a written breakdown of what is included in the quoted price and where the supplier's responsibility ends.
6. Your Project Context and Decision Timeline
Project buyers should include the programme: the date the spa must be operational, the stage of the building works, and who signs off on the design. A villa owner, a builder and a hotel procurement team all need different drawings at different moments. If the swim spa is part of a wider outdoor package — loungers, dining sets, pergolas — mention it in the first message so the whole swimming pool and swim spa selection can be coordinated with the rest of the specification.
Where a project needs non-standard dimensions or a bespoke layout, say so at the outset. The custom and OEM service covers made-to-order work, but it is far cheaper to design once than to change an order.
A Short Pre-Enquiry Checklist
1. Dimensioned site plan and access route, with the 11740 × 2200 mm footprint drawn in.
2. Support structure decided or at least sketched, with structural sign-off identified.
3. Intended use: lap swimming, hydrotherapy, family use — and whether a swim training system is required.
4. Supply type, voltage and available circuit capacity near the position.
5. Options wanted: heat pump, insulation, UV, sand filtration, steps, control placement.
6. Port of entry, delivery access, and who handles import clearance.
7. Target operational date and the stage of the building works.
Send those seven items with your enquiry about WS-S12 and you can expect a quotation that matches the site rather than a generic price list. After-sales arrangements, including installation and after-sales support, are worth confirming in writing at the same time as the order.
SANTERSON — China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008.
Contact: PHILLIP · Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com
Enquiry page: https://www.santerson.com/contact/