A swim spa sits between three trades on most villa and resort schedules: the civil team pouring the deck, the electrical contractor running supply and protection, and the supplier delivering a finished shell with pumps, jets and controls already fitted. That is exactly where specification errors appear. The brief says "one 6-metre swim spa", the quotation comes back at a different length, the local electrician has sized a circuit around an assumed load, and the deck edge has been set before anyone decided whether access steps or a plant compartment are needed. This article uses the Outdoor Swim Spa WS-S06B-T as a worked example and sets out the fields worth writing down before a single price is requested.
Why swim spas are specified late and wrong
In an outdoor area that already contains paving, planting, lighting, pergolas and lounge furniture, the water feature tends to be the last item priced and therefore the one with the least documentation. Unlike a spa vessel dropped onto a slab, a swim spa is usually recessed or partially recessed, so its footprint determines formwork, waterproofing details and the position of any plant room. Once those are cast, changing the model means breaking out concrete.
The second problem is vocabulary. Buyers write "swim spa", suppliers quote a "plunge pool with a counterflow unit", and the two documents describe different equipment sets. A procurement brief fixes this by naming the model number, listing the equipment included in that configuration, and separating what the supplier delivers from what the site contractor provides.
Read the catalogue sheet as a starting point, not an order
The published record for WS-S06B-T lists a shell of 5800 x 2200 x 1420 mm, one control system, one swim training unit, one water pump, one filter pump, forty jets in total, LED lighting (three main fixtures plus twenty-six small LEDs), ozone sanitisation, temperature setting and a stated total power of 8.75 kW. Those numbers are enough to test whether the model fits the space and the budget envelope. They are not enough to build with.
Two lines on that sheet deserve more attention than the rest, because they are where quotations diverge. The first is "features shown": water jets, temperature setting, LED lighting, ozone and a swim training system describe what the catalogue model displays, not what your configuration must contain. The second is the options list — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps are catalogued as choices, and availability and compatibility vary by model. Two buyers can order "a WS-S06B-T" and receive different equipment.
The ten fields to put in the brief
| Field | What to record | Why it matters at quotation stage |
|---|---|---|
| Model and configuration code | Exact model number plus a written list of the options selected | Prevents suppliers pricing different equipment sets against the same name |
| Shell dimensions and water depth | External length, width, height and usable water depth | Drives excavation, deck detailing and how tall a swimmer can stand in the training zone |
| Installation method | Recessed, semi-recessed or above ground; whether steps are included | Determines formwork, waterproofing, access and whether the 1420 mm height is measured to coping or to finished grade |
| Total connected load | The figure for the selected configuration, not the catalogue baseline | Sets cable size, breaker rating and whether a heat pump changes the supply the site must provide |
| Heating route | Electric or heat pump, plus insulation if the spa runs year-round | A heat pump moves most of the running load and changes both the electrical work and operating cost |
| Sanitisation | Ozone as standard; UV sterilisation as an option | UV is a catalogued option, so it must be requested or it will not arrive |
| Filtration | Standard filter pump versus sand filtration | Affects plant space, backwash drainage and maintenance routine |
| Jet count and zoning | Total jets and how they are grouped for the hydrotherapy and swim zones | Determines pump duty and whether the brief's "massage" intent is actually met |
| Controls and user interface | Number of control systems and who operates temperature settings | Matters most for hotel and clubhouse use, where staff rather than owners set the water |
| Site scope split | What the supplier delivers versus what the local contractor does | The commonest gap: nobody priced the crane, the sub-base or the drainage channel |
Electrical and civil notes that belong in the same document
Write the electrical section as a question to your own contractor rather than an assumption about the product. Take the total power figure for the configuration you have chosen, ask the contractor to confirm supply capacity, protective device rating, cable route and any residual-current protection required by local rules, and record their answer in the brief. The catalogue sheet gives you the load; it does not tell you what your site's distribution board can carry, and no supplier should be asked to certify compliance with a code they have not inspected.
On the civil side, the brief should state the finished level of the surrounding deck relative to the spa coping, the location of the plant access point, the drainage arrangement for overflow and any backwash water, and the load path for anyone lifting a filter basket. These are drawings, not product questions, but they belong in the same document because they decide whether the delivered shell can actually be installed on the day it arrives.
Comparing configurations within the swim spa range
Most projects shortlist two or three models rather than one. The Swimming Pools and Swim Spas range covers several shell lengths, so a project constrained by a narrow terrace can step down to a shorter unit while a resort lap facility can move up. When comparing, hold three variables fixed — available deck length, required swim-zone length and the connected load your board can carry — and let everything else vary. Comparing on jet count alone tends to push buyers toward shells their site cannot support.
Where a project needs a shape rather than a standard rectangle, that is a separate enquiry. A Customizable Shape Outdoor Spa covers square, round, oval and curved layouts with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas where the geometry is set by the architecture. Specify it as its own line item with its own drawings; do not fold it into the same row of the schedule as a standard model.
How one supplier reduces the paperwork around the shell
A swim spa rarely travels alone on a project that is also ordering pergolas, loungers, paving and lighting. Each of those lines brings its own delivery window, customs file and installation crew, and outdoor programmes usually slip at the handover between them. Coordinating the poolside items through one Turnkey Interior Project Solutions package puts that sequencing under a single project manager. Where the terrace detail is non-standard, Custom Furniture Manufacturer and OEM work covers the pergola posts, poolside joinery and loose furniture around the spa to the same drawing set.
Freight is the other practical gain. A swim spa shell is an awkward, heavy consignment, and it moves more cheaply and more safely when it is planned alongside the rest of the project's cargo rather than as a standalone import — see Furniture Logistics and Door-to-door Delivery. Post-delivery, installation and support sit with the same party who quoted the equipment list, which keeps responsibility for the configuration in one place: Furniture Installation and After-sales Support.
A short checklist before you send the enquiry
- Model number written once, consistently, across drawings, bill of quantities and enquiry email.
- Selected options listed in words, with anything not required explicitly excluded.
- Total connected load for that configuration supplied to the local electrical contractor for confirmation.
- Deck levels, plant access and drainage shown on a drawing attached to the enquiry.
- Site scope split stated: what is delivered, what is installed by others, and who provides lifting.
- Lead time and delivery terms requested in writing against the named configuration, not the range.
Figures quoted above are the catalogue values recorded for WS-S06B-T on the product page. Included equipment, options and electrical requirements vary by configuration and must be confirmed for the specification you order before any concrete is poured or any circuit is sized.
Send us the model number, your deck drawing and the load your board can carry, and we will confirm the equipment set, options and delivery terms for that configuration. Contact the SANTERSON project team to start a specification review.