A pull out laundry hamper looks simple on a drawing. It is a set of baskets behind a cabinet door, and it is easy to assume the factory will simply know what to build. Then the first sample arrives with baskets that foul the skirting board, a door that will not clear the handle, or a runner rated for an empty basket but not for a full weekend of washing. The gap between the drawing and the working unit is usually a briefing gap. Here is what the manufacturer needs from you before pricing and producing a made-to-measure hamper unit.
Start with the room, not the product
Our Pull Out Laundry Hampers sit in a Laundry Integration collection intended for residential bathroom projects, and each unit is made to measure rather than offered in fixed sizes. That means the room governs the design. Send the manufacturer the finished-floor level, the wall-to-wall dimension of the recess, the position of doors and openings, and any obstruction that runs behind or beside the cabinet: pipework, a soil stack, a towel rail, or a skirting board that the basket has to clear as it pulls forward.
Also state which room the unit is in. A hamper built into a main family bathroom sees daily use and high humidity; one tucked into a guest ensuite or a villa laundry alcove may see lighter use but still needs a finish that tolerates the same cleaning regime. If the hamper shares a wall with a shower, say so plainly. The manufacturer can then select board and finish choices suited to a damp environment instead of defaulting to a bedroom-grade specification.
Specify the basket arrangement you actually want
Basket count, basket capacity and how many sorting streams the unit provides are decisions the buyer makes. Settle them before the enquiry goes out, and be honest about how the household or the guest flow really behaves. Two baskets used as one stream is wasted cost; four baskets where two are never filled is wasted space.
- Basket count per bay, and whether each basket lifts out or stays fixed to the runner.
- Liner material: woven, coated or rigid plastic, and whether the liners come out for washing.
- Lid on each basket if required, and how that lid behaves when the bay is pulled into a narrow aisle.
- Whether the bay front is the cabinet door itself or a separate access panel.
Give the runner its own line in the brief
The runner is the part that fails, and it is the part most briefs leave out. State the extension you need, the load you expect with baskets full, and whether soft-close or push-open is wanted. A hamper bay in a villa corridor that gets opened with arms full of linen needs a different runner from one opened at a standstill in a dedicated laundry room.
| Runner detail to state | Why the manufacturer needs it |
|---|---|
| Extension required, full or partial | Determines whether baskets clear the door and can be emptied without lifting them out. |
| Expected load per bay with baskets full | Sets the runner class. A rating for an empty basket is not a rating for a working one. |
| Soft-close, push-open or plain runner | Affects the door gap, the handle choice and the force needed to open the bay. |
| Side-mounted or bottom-mounted | Changes carcass construction and the usable internal height. |
Match the finish to the joinery around it
A hamper bay normally disappears into a longer run of cabinetry, so the finish brief has to travel with the unit. Send the door profile, the colour or veneer reference, and the hardware already specified for the rest of the room. Where the hamper sits inside a wider fit-out, ask for the same carcass construction and edge treatment as the adjacent units, so the doors align and wear consistently.
Material and finish options form part of the specification across our laundry range, including WasherDryer Cabinets and Compact Laundry Solutions. If the hamper, the machine housing and the storage are ordered together, they should be quoted as one set with one finish schedule, not as three separate purchases that happen to share a colour name.
Send drawings with dimensions on every face
One elevation is not enough for made-to-measure work. The brief should carry the height, width and depth of the finished unit; the clear internal dimension each basket needs; the plinth or toe-kick treatment; and the door size and opening direction. Mark the finished-floor level on the drawing, because a runner set at the wrong height either drags along the floor or wastes the lower bay.
Confirm what is excluded
State whether baskets, liners, runners, doors and plinths are inside the price, and how the unit ships: assembled or flat-packed, and in how many pieces. A hamper bay that arrives as a loose kit of panels and hardware pushes assembly labour onto the site team, which is costly on an overseas project where the fitter travels to the job.
A short brief checklist
- Room type, exposure to water, and the cleaning regime the finish has to tolerate.
- Recess dimensions with finished-floor level marked, plus obstructions behind and beside the unit.
- Basket count, capacity, liner material, lid choice and the sorting logic you expect.
- Runner extension, load with baskets full, closing action and mounting method.
- Door profile, colour or veneer reference, and the hardware used elsewhere in the room.
- Shop drawing approval before production, and written confirmation of what the price includes.
Where the laundry work goes beyond a single bay, brief the whole wall at one time. A Laundry & Storage Combo arrangement lets a hamper bay sit alongside linen storage and tall cabinets in one run, which keeps the carcass construction, the finish schedule and the installation sequence with a single supplier. That is the practical difference between ordering a component and specifying a room.
SANTERSON manufactures custom cabinetry and interior fixtures for villa, hospitality and residential projects, with made-to-measure sizing and finish options specified for each project. Send your drawings, dimensions and finish references, and we will return a shop drawing and a quotation for review before production begins.