A freestanding cabinet looks simple on a drawing sheet and complicated on site. The unit has to clear a doorway, sit true on a floor that is rarely level, align with the joinery around it, and still leave the services it shares a wall with accessible. This guide walks through how we take the Santerson Freestanding Cabinet from an architect's elevation to an installed piece, and what we need from your team at each stage so the numbers on paper match the numbers on site.

Why a freestanding cabinet still needs coordinated drawings

"Freestanding" describes how the unit stands, not how independent it is. It shares the room with skirting boards, architraves, light switches, air grilles, curtain lines, doors that swing through an arc, and sometimes a floor outlet. Our freestanding cabinet is made to your dimensions rather than supplied in fixed sizes: finish, layout, materials and overall size are all specified per project. That flexibility is the point of the product, and it is exactly why the specification has to arrive complete.

When a unit is manufactured to a set of dimensions that never met the real wall, the fixes happen on site: scribing to an out-of-plumb wall, packing off an uneven floor, moving a socket that is now behind a carcass. All of it is avoidable with one coordinated drawing round and one verified site measurement. Our interior design and project coordination service covers drawings, production coordination and on-site guidance, so the same team that reads your elevation also answers for what arrives in the crate.

Step 1: Read the drawings for constraints, not just sizes

Before any dimension is confirmed, we review the design pack with a shortlist of questions. Each one changes either the make-up of the cabinet or the delivery route it takes to get there.

  • Access route. Width of the entrance, internal doors, lift doors, stair turns and corridor corners between the loading point and the final position. A tall single carcass may be a clean fit in the room and an impossible fit in the service lift.
  • Floor finish build-up. The level of the finished floor relative to slab. This sets the unit height, whether plinths are needed, and how much packing range the installers require.
  • Wall condition at the setting-out line. Skirting profile, projection of architraves, and whether the wall is plasterboard, masonry or a clad surface that cannot take standard fixings.
  • Services in the zone. Sockets, switches, data points, radiators, underfloor manifolds, sprinkler heads, ceiling diffusers and light lines that fall behind or beside the unit.
  • Door and drawer swing. The arc of the room's doors, plus the cabinet's own door opening against adjacent furniture and traffic paths.
  • Finishes it must match. Veneer, lacquer, glass, metal or stone tones that have to read as one family with the surrounding joinery and wall panelling.

Step 2: Verify site dimensions before you sign off the specification

The single most common coordination failure is manufacturing from architectural dimensions that were taken from a model rather than from the built condition. Drawings describe the design intent; the finished space carries the tolerances of the structure, the floor screed and the trades that followed.

Our recommendation is straightforward: measure the actual opening after the wet trades and floor finishes are complete, then record it on a simple dimension sheet. Take width at high level, low level and mid height; take depth at both ends of the setting-out line; take the diagonal to reveal a wall that is out of square; and note plumb and level deviations with the direction of the lean. A laser line and a folded tape at three heights tell you more than one dimension in the middle of the wall.

Where site verification cannot happen before production, we design in tolerance instead of hoping for the best: a scribe or filler panel to the reveal, an adjustable plinth to absorb floor fall, and a shadow gap detail that hides small deviations rather than exposing them. The trade-off is visible in the finished joint line, so it is a decision to make together at quotation stage rather than discover at handover.

What we ask for on the dimension sheet: project name and room reference; the drawing number and revision you worked from; three width readings and three depth readings; finished floor level relative to a site datum; wall construction type at the fixing line; positions of every socket, switch and grille inside the unit footprint plus 150 mm around it; photographs of the space from both ends; and the access route from the delivery point.

Step 3: Set the cabinet out on the drawing sheet

With verified dimensions in hand, the design moves from a nominal box to a coordinated detail. This is where the internal make-up is decided, and it should be driven by what the cabinet has to do in the room.

Height and proportion

A full-height unit reads as part of the wall and works best where storage volume matters more than display. A waist-height or sideboard-height unit keeps sightlines open across a living space and gives a usable top surface. Where the cabinet sits under a window sill, a bulkhead or a ceiling reveal, we set the top dimension from the obstruction rather than from the drawing's nominal room height.

Internal layout

Shelf spans are limited by the load they carry and by the span itself: long, unsupported shelves in a display unit will sag under the weight of books and ceramics long before anything looks wrong on the elevation. We set shelf depths to the items being stored rather than to the carcass depth, and we place fixed shelves away from the range where adjustable pins would be more useful. If part of the storage is behind a door and part is open, the open section should not face the direction of the room's main sightline unless that is the intention.

Doors, glass and hardware

Door choice changes both the drawing and the site sequence. Hinged doors need clearance to swing; sliding doors need a track line and a wall that can carry it; glass-fronted sections need a defined glass type, an edge detail and a safe fixing method. Where display lighting is part of the design, as in our Santerson Illuminated Display Cabinet, the cable route, driver position and access to that driver all have to appear on the drawings before the unit is built and before the electrician closes up the wall.

Finish matching

Veneer, lacquer, laminate and metal read differently under a room's lighting than they do on a sample card. Where the cabinet must match existing or adjacent joinery, we ask for a physical sample of the surface to be matched, not a colour code, and we confirm the sheen level as well as the tone. For projects in which several product families have to look like one scheme, we place the Santerson Freestanding Cabinets for bathroom and utility areas alongside the living-area units at specification stage, so doors, handles and tones are decided once instead of twice.

Step 4: Issue a coordinated shop drawing for sign-off

We return a production drawing that reflects your verified site dimensions and the agreed internal make-up. This is the document worth spending time on, because it is the last point at which a change costs nothing.

Drawing elementWhat to check before you sign
Overall size and orientationHeight, width and depth against the site sheet; left-hand and right-hand handedness of doors and drawers.
Setting-out linePosition in the room relative to a fixed datum, plus the shadow gap or scribe allowance at each reveal.
Internal make-upShelf positions and adjustability, drawer counts and runners, fixed versus adjustable sections, load-bearing shelves.
ServicesCut-outs for sockets, cable routes, driver locations, and access panels that remain reachable once the unit is in place.
FinishesNamed surface on every visible face, including carcass edges, interior faces, plinth and any scribe panel.
Installation notesFixing method to the wall type on site, levelling range, packing allowance, and how the unit is brought in.

Sign-off should come from one named person per discipline. When an interior designer, a contractor and a client representative each approve a different revision, the version that reaches production is never certain, and neither is the price attached to it.

Step 5: Sequence the site works around the delivery date

A made-to-measure cabinet cannot be installed into a room that is still wet, dusty or being touched by other trades. The practical sequence is: floor finishes complete, paint and wall finishes complete at the setting-out line, electrical first fix signed off with final socket positions confirmed, then delivery and installation. Where that order cannot hold, we agree a protective plan instead of leaving it to chance.

  • Confirm the delivery window against the access route measured in Step 1, including lift booking if the unit is being taken up.
  • Keep the installation zone clear and dry, with floor protection laid where the crate will be moved through.
  • Have the electrician present, or on call, for any unit with internal lighting or a cut-out that has to land on a live circuit.
  • Walk the room with the site supervisor before the installers leave and record snags on the spot rather than at handover.

Step 6: Inspect, snag and hand over against the signed drawing

The inspection is short when the earlier steps were done properly. Doors are checked for consistent gaps and alignment; drawers for smooth travel under load; shelves for level; the unit for plumb and level across its own face rather than relative to a crooked floor. Any scribe or filler panel is checked against the wall it was cut to, and lighting is checked with the driver accessible for future maintenance.

Our installation and after-sales service covers on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. The response times quoted on our service pages are stated aims rather than guaranteed levels, so we record what applies to your project in the order documentation instead of assuming it.

A short checklist for procurement teams

  • Do not release a made-to-measure order on model dimensions. One site visit with a laser measure removes most of the rework risk.
  • Name one revision-controlled drawing as the production reference, and state its number on the purchase order.
  • Specify the access route early; a split carcass costs less in planning than a crane lift costs on site.
  • Decide lighting, glass and hardware at quotation stage. Late changes to those items change both price and lead time.
  • Send physical finish samples when the cabinet has to match existing joinery.
  • Book the installation window with the room already finished, and keep the electrician available.

If you are specifying storage for a villa or hospitality fit-out and want the drawing review, made-to-measure production, delivery and installation handled as one package, send us your drawings and site dimensions through our turnkey project service and we will come back with a coordinated proposal.