A shaker front reads as classic without being fussy, which is why it keeps appearing in villa kitchens, serviced-apartment pantries and hospitality back-of-house joinery. The difficulty is not choosing the profile. It is writing a brief precise enough that three suppliers quoting the same drawing do not hand you three different cabinets. Below is the field structure we use for Santerson Shaker Style PVC Cabinets, so your procurement team can specify the door, the substrate behind it, and the tolerances that decide whether the site installation goes to plan.
What the product name actually commits you to
Read the catalogue entry twice before it reaches your bill of quantities. On santerson.com this line sits in the PVC Kitchen Cabinet collection under the title Santerson Shaker Style PVC Cabinets, while the body copy on the same page describes a plywood cabinet design from the Plywood Kitchen Cabinet collection. Both descriptions stop at the same functional promise: made-to-measure sizing, material and finish options, and a layout tailored to the project, with dimensions and selected specifications to be confirmed for each order.
That naming gap is not a problem as long as your brief does not inherit it. If you copy "PVC cabinet" into a specification sheet as though the core were PVC, you may receive a foam-core or PVC-extrusion door when you wanted a plywood-cored door with a PVC finish, and vice versa. Neither reading is wrong on its own; what is wrong is leaving the substrate undefined while pricing and approving a finish. State the door construction in your own words, attach the profile drawing, and require the supplier to confirm the core material in writing against that drawing.
Rule of thumb for the brief: the collection name belongs in the line item, the substrate and profile belong in the description, and neither is a substitute for a confirmed shop drawing.
Section 1: Door specification
The shaker profile is defined by a recessed centre panel inside a square frame. Four variables decide how it looks and behaves once installed, and all four should appear as separate rows in your schedule rather than one sentence.
- Rail and stile width. A slim frame suits compact apartments and handleless-adjacent schemes; a wider frame carries more visual weight and works better in high-ceilinged villas and lobbies where the joinery has to hold its own. Fix the width per elevation, not per project, so the kitchen and the pantry can differ deliberately.
- Centre panel. Flat or moulded, and whether the panel is applied or integral. Applied panels have a joint line that movement can open up over a heating season; note which construction you are accepting.
- Finish system. Santerson's kitchen range covers matte, high gloss, textured and wood-effect surfaces across several door families, so a colour code alone is not a specification. Request a physical sample panel in the selected finish, signed and dated by your project team, before releasing production.
- Edge and corner treatment. Hospitality doors get slammed and knocked. Ask what the edge build-up is and how corners are protected, then write the answer into the brief for the next project instead of re-litigating it.
Section 2: Substrate, core and where PVC earns its place
The reason a PVC-finished door is worth specifying at all is surface behaviour: a vinyl film wraps the profile, so the routed corners of a shaker frame stay covered rather than showing a bare edge the way a sprayed finish can on a badly machined door. It also cleans with a damp cloth, which matters in a rental kitchen or a staff pantry where nobody is treating the joinery gently.
What PVC does not do is make the substrate irrelevant. Moisture exposure, fixing loads and hinge pull-out all depend on what sits under the film. For wet zones, decide whether you require a moisture-resistant board grade and say so explicitly; do not assume a PVC label carries that answer. Where a project genuinely needs a water-tolerant cabinet body, look at it as its own line item — Santerson publishes Outdoor Ready PVC Cabinets in the same collection for situations outside a standard internal kitchen.
If the brief calls for plywood construction instead, keep that decision inside the door schedule and have the supplier confirm it against the drawing. If the brief calls for a different shaker family altogether, say which one: Santerson's Shaker Kitchen Cabinets collection includes Grey Shaker Cabinets and several other finish variants, and quoting the wrong family name is a common source of change orders at site stage.
Section 3: Carcass, hardware and interior fit-out
Doors sell the drawing; carcasses and hardware decide whether it survives handover. Specify these separately:
- Carcass board and thickness, plus edge banding colour and material. Note which units are visible open ends, because those need matching banding rather than a standard closure panel.
- Hinges and slides by brand and series where you have a house standard, including the closing action and the number of cycles your operator expects from them.
- Handle strategy. Shaker frames invite a pulled handle; if you want finger pulls or integrated profiles instead, dimension them on the elevation so the frame width can accommodate them.
- Interior fittings — drawer boxes, tall-unit pull-outs, corner solutions. Each one changes the internal dimension and therefore the carcass build, so late additions are expensive.
- Integrated lighting. If under-carcase or in-cabinet lighting is on the drawing, the carcass needs cable routes and transformer access agreed at design stage, not chased in on site.
Section 4: Tolerances, measurement and interface details
Custom cabinetry fails at interfaces more often than at doors. Put the following in writing:
| Interface | What to state in the brief |
|---|---|
| Floor and ceiling | Finished floor levels, floor-to-ceiling heights taken on site after the screed and plaster are complete, and who supplies scribes, plinths and pelmets. |
| Walls | Whether walls are square or out of plumb, and whether gaps over a stated threshold are filled by the cabinet maker or closed by the builder. |
| Worktops | Stone thickness, front edge profile, splashback return, and the exact cut-out dimensions for sink and hob before the carcass is assembled. |
| Appliances | Model numbers and installation drawings for every integrated unit. An oven that changes model after release moves the tall-unit dimensions. |
| Services | Plumbing, drainage and electrical positions on a dimensioned setting-out drawing, cross-checked against the cabinet layout you approved. |
Section 5: Sampling, approval and production release
For anything beyond a single dwelling, ask for one sample door in the specified finish and core before the full order is cut. It costs little and it settles three arguments at once: colour under your lighting, the look of the routed corners, and whether the handle you chose sits correctly on the frame width you chose. Record the approval as a dated sign-off with the sample retained, because the person inspecting delivery is rarely the person who approved the design.
Section 6: Packaging, freight and site sequencing
Cabinetry travelling internationally needs protection at the corners and clear carton marking tied to the room-by-room layout drawing. Ask how doors are packed separately from carcasses, and confirm that carton labels reference your elevation numbers rather than the factory's internal job codes — a delivery crew that cannot match a box to a wall loses a day.
Then sequence the trade properly. Site-measure after wet trades have finished; release production only after appliance models are fixed; deliver only once the room is enclosed, sealed and dust-controlled. SANTERSON operates as a furniture and building materials manufacturer with custom and OEM service, door-to-door logistics and installation support, which means one supplier can carry the joinery alongside the rest of the fit-out package. That convenience only pays if your procurement brief keeps the interfaces between packages defined.
A ready-to-use line-item template
| Field | Entry format |
|---|---|
| Item name | Kitchen cabinets, shaker profile — as per Santerson Shaker Style PVC Cabinets catalogue entry |
| Door construction | Shaker frame and centre panel; core material to be confirmed against drawing No. ____ |
| Finish | Colour / texture code, sheen level, sample reference and sign-off date |
| Rail & stile | ___ mm front elevation, per elevation drawing |
| Carcass | Board type, ___ mm thickness, edge banding to doors / white inside |
| Hardware | Hinge series ___, slide series ___, closing action, handle type |
| Interior | Drawer bank schedule, tall pull-outs, corner units, lighting routes |
| Measurement | Site-measured after finishes; tolerances ± ___ mm at interfaces |
| Approvals | Shop drawing revision ___ dated ___; sample door reference ___ |
| Delivery | Carton marking to elevation numbers; delivery window and storage location on site |
Frequently asked questions
Is this a PVC cabinet or a plywood cabinet?
The catalogue lists the item under both collections, so treat the name as a reference and settle the question in your own specification: state the core you require and have the supplier confirm it against the drawing before release.
Can shaker doors be made handleless?
Yes, provided the rail and stile widths are dimensioned to take a finger pull or an integrated profile. Fix this on the elevation; it cannot be resolved at hardware order stage without changing frame proportions.
What is the minimum information needed for a quotation?
Layout drawings with finished levels and appliance positions, the door schedule fields above, and your target completion date. A price built on a plan alone will move once site measurement happens.
Should the joinery be ordered separately from the rest of the fit-out?
Only if you want to manage the interfaces yourself. Sourcing cabinetry, wall panelling, doors and flooring through one manufacturer reduces interface disputes but does not remove them — the brief still has to say who closes each gap.
Specify the profile, name the core, fix the interfaces and sign off a sample door. Do that and a shaker kitchen stops being a decorative preference and becomes a line item your site team can install without a phone call.