A wardrobe line item that reads "high gloss lacquer, as per sample" survives about one round of site questions before it starts causing trouble. Gloss level, substrate, panel thickness, edge treatment and who signs off the colour are all still open, and each of them changes price, lead time and how the finished joinery looks against the rest of the room. This guide sets out what to put in a procurement brief for high gloss lacquer wardrobes so that the quotation you receive is comparable, and so the production drawings match what the design team intended.

Why high gloss lacquer needs a more precise brief than other finishes

Lacquer is a sprayed, cured finish rather than a foil or laminate surface. That gives it depth of colour and a reflective surface that reads well in bedroom schemes and in tight corridors where a mirror-like door panel helps the space feel larger. The same property makes it less forgiving on paper: a lacquered wardrobe is built up from a chosen substrate, a chosen number of spray and cure passes, and a chosen edge detail, and the brief has to name all three. Matte options in the same family, such as matte lacquer wardrobes, are specified the same way, but the visual risk shifts from glare and fingerprints to colour depth and uniformity.

Reflective surfaces also reveal how carefully a project is coordinated. A door that meets a skirting line, a ceiling cornice or an adjacent wall panel at an uneven angle is invisible in a textured finish and obvious in gloss. If the wardrobe is part of a wider joinery package, the brief should state which other elements share the same lacquer specification so the supplier can batch them together.

What the brief must state before a quotation is useful

The following items are the ones that most often come back as "please confirm" after a first review. Writing them into the brief at issue stage removes most of the "please confirm" correspondence that usually delays a joinery order.

1. Room schedule and dimensions

  • Room-by-room wardrobe list with clear opening widths, heights and depths, plus ceiling height where the unit is floor to ceiling.
  • Whether the unit is built into a recess, butted between walls, or free-standing, and whether skirting, architrave or cornice has to be scribed around it.
  • Obstructions: extract ducts, downlights in the soffit, radiator positions, door swings, and switch or socket locations that fall behind the carcass.
  • Floor finish build-up and whether the finished floor level is fixed, because made-to-measure sizing depends on knowing which dimension is final.

2. Finish and colour reference

  • The colour reference you are actually working from: a manufacturer code, a RAL number, or a physical sample number held on site. State which one governs if they disagree.
  • The gloss level you expect, described in words and confirmed against a physical panel rather than a photograph.
  • Which surfaces are visible. A wardrobe in an open alcove may need both faces finished; a unit inside a recess usually needs only the front and returns.
  • How many colour and gloss samples you require before production release, and who signs them off.

3. Door type and hardware

  • Hinged, sliding or folding doors, and the clear circulation space available for each. Sliding doors need track depth; hinged doors need swing clearance.
  • Handle style or a handleless groove detail, since the edge profile of a gloss door changes with the hardware choice.
  • Hinge and runner quality level, soft-close requirement, and whether hardware is supplied by the joinery supplier or by your own ironmongery package. Splitting this responsibility across suppliers is a common source of snags at handover.

4. Interior layout

  • The mix of hanging rails, shelves, drawers, trays and pull-out accessories per unit, drawn to scale where possible.
  • Rail heights for long garments and double hanging, which are easy to get wrong when a drawing is prepared from a generic layout.
  • Integrated lighting or a provision for it, including where the transformer and switch are permitted to sit.
  • Whether the interior carcass finish matches the exterior or is a standard light tone.

5. Scope of supply and site responsibility

  • Who measures the openings, and at what stage: measure on completion of wet trades and floor finishes is the safer sequence for made-to-measure joinery.
  • Whether delivery goes to a central store or direct to each apartment or floor, and what packaging protection is required on site.
  • Who installs, who removes protective film, and who clears the snags list afterwards.

Reading the supplier's response

Once the brief is complete, compare quotations on the same basis rather than on headline price. A useful comparison sheet records: the stated substrate and panel thickness; the number of lacquer passes and whether primer, base and top coat are all included; edge treatment on visible edges; hardware brand and model; tolerances for out-of-plumb walls; packaging standard for export or long-distance freight; and what is excluded. Two quotations that look identical in price can differ materially once these lines are filled in.

Ask for production drawings with dimensions and finish callouts before release, and check them against your room schedule line by line. This is the point at which a made-to-measure supplier proves its value: if the drawings come back with the openings questioned, the scribing allowance shown and the interior layout drawn to your specification, the package will arrive ready to install.

How a made-to-measure lacquer wardrobe package is coordinated

SANTERSON works as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. Wardrobe joinery in the Lacquer Wardrobes collection is supplied to made-to-measure sizing with material and finish options and a layout tailored to each project; the site also asks that dimensions and selected specifications be confirmed for every project. For two tone lacquer wardrobes and other variants in the same collection, the specification discipline above applies unchanged, with one extra decision: which surfaces carry which colour.

Because wardrobes rarely travel alone on a project, coordinating them with the rest of the fit-out reduces the number of separate suppliers you have to manage. The built-in furniture range covers cabinetry and joinery that shares finishes with bedroom, hallway and utility storage, while interior fixtures cover the complementary elements of a room package. The service scope the company describes runs from design consultation and material selection through manufacturing, project coordination, logistics and door-to-door delivery to installation and after-sales support, which means one supplier carries the interface between joinery, freight and site fitting rather than leaving it to the main contractor.

The project cases published on the site include villa and housing work in Willoughby, Perth, North Turramurra, Melbourne and Sydney. Australian enquiries therefore share the same practical points as anywhere else, with freight added on top: confirm finished floor levels before measurement, agree Incoterms and delivery address early, and build container loading into the packaging specification so gloss panels arrive without chipped edges.

Specification summary to paste into your brief: room schedule with clear dimensions and obstructions; colour reference and gloss level confirmed on a physical sample; door type, hardware source and clearance; interior layout drawing; visible-face definition; measurement stage; delivery point; installation responsibility; snag and replacement process. Attach a signed sample reference to the purchase order.

Common specification mistakes and how to avoid them

  • Specifying gloss from a photograph. Screen and print reproduction cannot carry a reliable gloss value. Require a physical panel, held on site, as the governing reference.
  • Measuring before the floor finish is laid. Made-to-measure joinery sized against an unfinished level will not sit correctly once the screed or flooring is in.
  • Leaving hardware to a different supplier without a written interface. Door weight, groove profile and hinge type have to match; state the responsibility in the brief.
  • Treating all rooms as identical. Alcove units, recessed units and free-standing runs need different scribing and fixing details, and should be listed separately.
  • No spare panel provision. Gloss panels are difficult to colour-match years later. Agree a small spares allowance at order stage for projects with repeat room types.

If you are preparing a wardrobe package for a villa, apartment or hospitality project and want the specification reviewed against made-to-measure lacquer joinery, send your room schedule and finish reference to SANTERSON and we will return production drawings and an itemised quotation.