A high gloss lacquer finish is the part of a made-to-measure wardrobe that shows damage first. Corner chips, surface scratches and pressure marks often stay hidden inside the crate and only become visible once the doors are unpacked on site — by which time the panels may already be installed in the opening. For buyers ordering High Gloss Lacquer Wardrobes for a villa or apartment project, packaging is not a logistics detail to be settled at the end. It is a specification item that should be confirmed in writing before production starts.

The product page for this collection describes made-to-measure sizing, selectable material and finish options, and a layout tailored to each project. That means the packaging has to be designed around the same drawings as the panels themselves: sizes differ from job to job, so there is no standard carton that fits every order.

Why Gloss Surfaces Need Their Own Packaging Brief

Lacquered panel packaging is usually specified by its layers rather than by a single material. Buyers should ask for each layer to be named in the packing list, not accepted as "export packing":

  • Surface protection. A protective film on the gloss faces, plus corner guards on every panel edge. Edges and corners take the first impact during handling.
  • Rigid outer layer. Plywood cases or timber-framed crates sized to the actual panel dimensions, with the panels standing or lying as the finish requires.
  • Cushioning and separation. Foam or EPE between panels so that two gloss faces never contact each other, and filler to stop any movement inside the crate during sea transit.
  • Moisture control. Desiccant and a moisture barrier, particularly for ocean freight, where condensation inside a container is normal.
  • Marking. Handling symbols (this way up, fragile, keep dry), crate numbers that match the packing list, and clear labels identifying which room or elevation each crate belongs to.

Ask whether doors, carcass panels, hardware and mirrors travel in the same crate or in separate ones. Mixed crates make on-site sorting harder and raise the chance of a gloss door being dragged across a rough panel edge.

The Five Packaging Questions to Put in Writing Before Production

Question to askWhy it matters for a gloss wardrobe order
Which packaging standard applies, and can the layer list be confirmed in writing?"Export packing" means different things between factories. A written layer list becomes the reference if a claim is made later.
Who pays for replacement panels and re-delivery if damage appears on arrival?The responsibility boundary should be agreed before shipment, not after the crates are opened on site.
How are crates numbered against the drawings and room schedule?Made-to-measure panels only fit one opening. Matching crate numbers to elevations keeps installation in sequence and avoids panels being cut open in the wrong flat.
What is the crate footprint, and does it fit the site access?Lift cars, stairwells and corridor turns in apartments and villas limit crate size. Confirm crate dimensions against the site access route before loading.
What inspection evidence will be produced before dispatch?Photographs of packed crates, plus film left on the gloss faces until installation, make it far easier to establish when any damage occurred.

Packaging and Delivery Are Coordinated as One Scope

SANTERSON lists freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery under Furniture Logistics and Door-to-door Delivery. Because the crate design determines how many crates fit a container and how they are loaded, buyers who confirm the packaging specification early also get a realistic picture of the shipment split. Where a project orders wardrobes together with other built-in furniture, ask for one combined packing schedule rather than separate lists from each product line.

The Custom & OEM Service covers bespoke finishes and brand customisation, including packaging. Buyers who need their own labelling or a specific crate standard for onward distribution should raise that at the quotation stage, since it changes both the packing method and the crate dimensions.

Receiving the Crates on Site: What to Do Before Installation

  • Check crate count against the packing list before the carrier leaves, and photograph any damaged outer crates at that moment.
  • Open one crate and inspect a panel from each gloss colour or finish in the order, rather than inspecting only the top panel of the first crate.
  • Keep the protective film on until the panels are in place. Film removal is the point at which responsibility for the visible surface effectively transfers to the site team.
  • Record crate numbers next to any defect found, with photographs, so the replacement discussion refers to specific items rather than a whole shipment.

If gloss wardrobe panels arrive alongside other finishes from the same supplier — Matte Lacquer Wardrobes or kitchen fronts in a matching lacquer — inspect each finish separately. Matte and gloss panels show handling damage differently, and a defect that is invisible on a matte surface can be obvious under the raking light a gloss door sits in.

A Short Checklist Before You Place the Order

  • Packaging layer list confirmed in writing, including film, corner protection, cushioning and moisture control.
  • Crate dimensions checked against site access: lift, stairwell, corridor and door widths.
  • Crate numbering matched to room schedule and shop drawings.
  • Damage responsibility and replacement terms agreed before production.
  • Pre-dispatch packing photographs received and filed with the order.
  • Inspection sequence agreed for arrival, including film-on installation.

Confirming these points costs nothing at quotation stage and removes the most common dispute on a gloss wardrobe order. Send your drawings and room schedule to SANTERSON and ask for the packing specification to be quoted alongside the wardrobes, so packaging appears as a defined line in the offer rather than an assumption.

For project enquiries about lacquer wardrobe collections, made-to-measure sizing and delivery scope, contact SANTERSON: Contact Us.