A mahogany solid wood wardrobe is made to measure, so the dimensions you send and the drawing that reaches the factory floor have to match. Settling the brief at enquiry stage is what keeps a bedroom joinery item on schedule: it fixes what the unit must clear, where it must stop, and which details the buyer and the manufacturer have agreed before anything is cut.

The Mahogany Solid Wood Wardrobes sit in the Solid Wood Wardrobes collection and are built for residential wardrobe projects, with finish, layout and dimensions specified to suit each space. Three things are always confirmed on a project: made-to-measure sizing, the material and finish selection, and the internal layout. Below is the information we ask a buyer, designer or contractor to supply with an enquiry, and what each item decides downstream.

The measurements that have to be right before anything is drawn

Send dimensions as a set of room drawings rather than one number per wall. For each wall the wardrobe will occupy we need:

  • Width at three heights. Floor, mid-height and ceiling. Older villas and renovated apartments rarely give the same figure twice, and the gap between them tells us whether to scribe the carcass or pack out the reveal.
  • Depth at floor level and at the back plane. Skirting, radiators, pipework and recessed power points all take usable depth, and a shallow carcass behaves very differently from a full-depth hanging one.
  • Floor to ceiling height at both ends of the run. This decides whether the unit can be built as a single full-height carcass or has to arrive in sections that join on site.
  • Position and swing arc of every door, plus the furniture already in the room. A hinged wardrobe door needs clearance to open fully; a sliding door needs a track zone instead.
  • Floor finish build-up. State whether the screed, tile or timber floor is already laid or still to come, and what thickness it will add. A wardrobe set down before the final floor level drops leaves a gap no trim will disguise.
  • Ceiling condition. Exposed beams, bulkheads, coving, sprinkler heads, recessed light fittings and air grilles all have to be drawn in, because a full-height built-in has to meet them cleanly.
Where the site is still open, as-built dimensions with the finishes noted are worth more than a nominal architectural plan. If no survey can be carried out, mark every measurement you are not confident about and it will be queried before production.

Project inputs that shape the specification

Dimensions set the envelope. The rest of the brief sets what sits inside it and how the unit reads in the room.

InputWhat we need from youWhat it decides
Room and useMaster bedroom, guest room, children's room, dressing room; number of users and what they storeRatio of hanging to shelf to drawer storage, and single or double hanging rails
Door typeHinged, sliding, corner or open configuration, plus the clearance availableCarcass depth, track allowance, handle detail, clearances to adjacent furniture
Internal layoutTrouser rail, jewellery drawers, laundry hamper, safe, ironing bay, lighting in nichesDrawer stack heights, shelf spans, wiring routes for internal lighting
Finish and edge detailStain or paint colour, sheen, panel profile, the joinery it has to matchSample approval before production starts; the finish reference written on the drawing
Fixing conditionsWall build-up, whether the wall takes a load, ceiling type, adjacent servicesCleat and bracket design, whether the unit is wall-hung or floor-supported
Package contextWhether the wardrobe travels with other cabinetry, doors, flooring or wall panelling on the same orderConsolidated shipment, sequence of site delivery, one trade interface instead of several
Site access and phasingLift size, stair width, delivery window, whether the unit must pass a narrow landingWhether the carcass is built as sections assembled on site

How the brief moves through custom production

As a furniture and building materials manufacturer in China, SANTERSON puts wardrobe work of this kind through the same custom and OEM route as the rest of our cabinetry. The sequence on a typical project runs: your dimensions and layout notes, a shop drawing for sign-off, a finish sample for approval, production, then door-to-door delivery with installation and after-sales support arranged around the site programme.

Two points are worth stressing because they are where projects lose time. First, nothing should be cut until the shop drawing is signed against the dimensions supplied; a revision after that point is not an edit, it is a rebuild. Second, if the wardrobe is one line item in a wider fit-out, put the whole set of drawings in front of us at once. When custom bedroom storage, internal doors and wall panelling are drawn together, reveals, architraves and shadow gaps line up across trades instead of being reconciled on site with sealant.

Comparing within the Solid Wood Wardrobes collection

Mahogany is one species option in this range, not the only one. Projects that want a lighter tone look at Oak Solid Wood Wardrobes, and those working to a darker or more figured scheme compare walnut and cherry in the same collection. Panelled doors in solid wood are also specified on classic bedroom schemes, where the profile matters as much as the species.

A practical way to read the choice: if the design intent is a warm, deep-toned built-in that carries a traditional or transitional interior, mahogany with a panelled door is the straightforward answer. If the room already has strong timber flooring and the wardrobe should recede rather than lead, a lighter species or a veneer front from the wider wardrobe range usually sits better. Send the flooring sample and the joinery reference with the enquiry and the comparison can be made against the actual colours on site rather than on a screen.

A short checklist for the enquiry

  • Room drawings with width at three heights, depth at floor level, and floor-to-ceiling height at both ends of the run
  • Floor finish build-up, and whether that finish is already laid
  • Door swing arcs, ceiling services, skirting and every obstruction drawn to scale
  • Door type confirmed: hinged, sliding, corner or open
  • Internal layout listed item by item, with what has to be stored in each zone
  • Finish reference and the joinery or flooring it must match
  • The access route from delivery vehicle to bedroom, measured
  • Whether the wardrobe travels within a larger cabinetry and interior package

Send that set and the shop drawing stage moves quickly, because nothing is left to infer. Where a measurement is uncertain, mark it on the drawing; it is far cheaper to query in the office than at the point of installation. If the wardrobe forms part of a broader fit-out, turnkey project solutions allow joinery, doors, flooring and wall finishes to be drawn, produced and shipped as one package.

To price a made-to-measure wardrobe, send room drawings, internal layout notes and the finish reference to SANTERSON, together with the site location and intended delivery window, so the joinery can be planned against the rest of the programme.