A rendering of a media wall is the easy part. What stalls a joinery package is usually the gap between that picture and a quotation: nobody has said which compartments are open, which are behind doors, how the unit meets the floor and ceiling, or who signs off the finish sample. This guide walks through the enquiry path for Santerson Open & Closed Combo Units, our configurable media unit line, and shows exactly what a buyer, contractor or designer needs in the file before production coordination can begin.
What This Product Line Actually Is
Open & Closed Combo Units sit inside our TV Cabinets / Media Units collection. The listing is deliberately configurable rather than a fixed model: layout, dimensions and finish are specified per space, so the same family of units can read as a low media cabinet under a wall-mounted screen or as a full-height living room wall with display niches and closed storage below.
Because the range is configured project by project, the product page does not publish one set of dimensions, one board material or one hardware schedule. Treat any specification you need for a tender as something to confirm for your own unit during detail confirmation. That single habit prevents the most common dispute in custom joinery: an assumption carried forward from a showroom photo into a purchase order.
Step 1: Read Your Own Brief Before Writing Ours
Before you send anything, settle three questions internally. They decide how much of the work is ours and how much is yours:
- Is this one unit or a wall system? A standalone media unit behaves like furniture; a wall that also carries the television, cabling and possibly an integrated panel behaves like a fit-out element and needs coordination with the wall build.
- Who is accountable for site dimensions? Site-verified openings, skirting heights and floor levels must come from someone on the ground. Design drawings alone are not enough for fixed joinery.
- What has already been decided? Finish, handle style and whether appliances or a screen are included change what we can price. Undecided items should be listed as options, not left silent.
Step 2: Send an Enquiry That Can Be Quoted
A workable enquiry for a media unit package is short but specific. Use this checklist; anything you leave out becomes a round of questions or, worse, an assumption.
| Item | What to state |
|---|---|
| Project and location | Project name, city, and whether it is a private villa, hotel guest room or common area. Usage type drives hardware and wear expectations. |
| Room and quantity | How many units, in which rooms, and the sequence of rooms if finishes differ. |
| Opening dimensions | Width, height and depth available, plus clearances for skirting, cornices, radiators or air returns. |
| Open-to-closed split | Which bays stay open shelves, which are doors or drawers, and what will be stored in each. Say plainly whether devices sit in view or must be concealed behind doors. |
| Television and services | Screen size and mounting method, plus where power, data and any speaker cabling terminate. Note whether cable routing is in your scope or ours. |
| Finish direction | Reference a finish from our range or send your own sample requirement: wood tone, lacquer sheen, matte or gloss, and any matching to existing cabinetry. |
| Drawings on hand | Layout plans, elevations, a mood board, or photographs of the wall. Even rough sketches speed up the first pass. |
| Programme | Target installation month and any site handover date that cannot move. |
| Delivery terms | Destination address and your preferred Incoterms. Freight, customs paperwork and door-to-door delivery are services we arrange, but the commercial terms stay yours to set. |
Step 3: What Happens After You Send It
Media units follow the same route as our other custom work: a design proposal and quotation with detail confirmation, then production, shipment and follow-up. For this product family the useful questions at the detail stage are concrete:
- Which carcass material and edge treatment apply, and are they stated on the drawing you approve?
- Do door fronts match the specified sample by name, not just by photograph?
- Are hinges, runners and handles identified, and are soft-close or push-open options priced in?
- Is any integrated lighting included, and where does its transformer and access point sit?
- How is the unit delivered — assembled, flat-packed, or in sections sized for the lift or stairwell?
If you want help before that stage, our interior design services cover space layout planning, furniture layouts and 3D visualisations, plus drawing and production coordination with on-site guidance. That is the route projects take when the media wall has to resolve together with flooring, wall panelling and lighting rather than arrive as a separate purchase.
Step 4: Decide How Far the Scope Goes
Most media wall enquiries start as one item and end as a small package. Where that happens, it is usually cheaper to coordinate the whole run of built-in furniture in one production batch:
- Adjacent storage: Santerson Full Height Storage Walls for pantries, linen and concealed storage on the same wall line.
- Screen-led walls: Santerson Full Height Media Walls where the television is recessed into a panelled composition rather than sat on a cabinet.
- Matching cabinetry elsewhere in the property, from wardrobes to kitchen units, so doors, veneers and hardware schedules stay consistent across rooms.
Our turnkey solutions cover villa, hospitality and office projects end to end — design consultation and space planning, material selection and product specification, manufacturing and quality control, project management with site coordination, then installation and handover. On Australian work we have published villa and apartment project references in Sydney, Melbourne, Willoughby, North Turramurra and Perth; scope details for each case are on the individual project pages.
A note on specifications
Configurable listings such as Open & Closed Combo Units do not carry a fixed technical sheet. Dimensions, board material, hardware, load ratings and any certification must be confirmed for your specific unit at detail confirmation. Do not enter figures from photographs or similar projects into a tender document.
Common Enquiry Problems, and How to Avoid Them
A finish chosen from a screen
Wood tones and lacquer sheens read differently on a monitor than under site lighting. Ask for the finish by its stated name in our range, and for larger packages request a sample before the full production run is released.
Open shelving specified without knowing what goes in it
Shelf spans, shelf heights and load capacity all follow from contents. Books, records, glassware and a soundbar need different shelves. Send the intended contents with the layout.
Cabling left to the installer
Where the television is fixed to the wall behind the unit, chase work and back boxes belong to the building trades. Agree that interface in writing before production, so cut-outs exist in the panels we manufacture.
Delivery terms decided too late
We arrange sea, air and rail freight with customs paperwork and door-to-door delivery, but duties, import requirements and site access conditions are destination-specific. Confirm them for your project rather than assuming a previous shipment applies.
Send the Enquiry
Send us the drawings, dimensions and finish direction you already have — an incomplete but specific brief is more useful than a polished rendering with no numbers. We will come back with a proposal and a detail list for your unit.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiry form: santerson.com/contact