A dining cabinet enquiry is settled long before the first drawing is made. If the brief you send amounts to "one tall unit, floor to ceiling, in the kitchen wall", the quotation that comes back will not match what your client pictured, and the change orders arrive once production has started. Here is how to turn a design brief into a Santerson Tall Dining Cabinet enquiry that a factory can price, build and deliver without three rounds of clarification.
This cabinet is made to measure: finish, layout and dimensions are specified per project. The sizes, materials, internal fittings and lighting you see in catalogue photographs are examples rather than a fixed specification, so confirm every detail of your own configuration before approving production.
Why a vague brief costs more than a late one
A tall dining cabinet sits at the junction of several trades: joinery, electrical and, in many layouts, the stone worktop that runs into it. It also carries loads a sideboard never has to - stacked glassware, heavy serving dishes, dry goods bought in bulk. When a brief leaves those requirements unstated, the factory prices a generic carcass, and everything you actually needed appears later as an addition: a reinforced shelf, a transformer for integrated lighting, a different door specification because the aisle is narrower than assumed.
For project buyers - villa fit-outs, hospitality schemes, apartment handovers - the enquiry is also the document that becomes your purchase order. Treat it as a specification, not as a request for a price.
What to send with your Santerson Tall Dining Cabinet enquiry
Everything below can be answered from drawings you should already have at concept stage. Where a number is not yet fixed, say so and give the range instead of leaving it blank.
| Item in the brief | What to state | Why the factory needs it |
|---|---|---|
| Location and room | Floor plan reference, wall elevation, the room's use (family dining, guest suite, staff pantry, show apartment) | Determines wear tolerance, door type and how much open display is appropriate |
| Envelope dimensions | Overall width, height and depth; whether the unit runs to the ceiling or stops below it; skirting, cornice or rebate details | Carcass size, transport split and on-site assembly method follow directly from these numbers |
| Obstructions | Switches, sockets, radiators, downstands, structural columns, floor level differences, door swing paths | Cut-outs and scribing must be designed in, not trimmed on site |
| Internal layout | Shelf positions and clear heights, drawer count and depth, whether you need glass-front display zones, appliance housing or a dedicated larder zone | Governs shelf strength, hardware grade and the cost of the internals |
| Doors and access | Hinged, sliding or open; handle or handleless; which side the hinges go; how many doors you expect to open at once in the aisle | Hardware selection and clearance requirements differ by access type |
| Finish | Door face material and sheen, colour reference taken from a sample rather than a description, matching requirement against existing cabinetry or wall panelling | Colour consistency across a batch has to be booked at the same production stage as the carcass |
| Electrical | Cabinet interior lighting or not, switch position, transformer location, who supplies and installs the cable | Prevents a second visit for drilling and wiring after installation |
| Quantities and phasing | Number of identical units, whether one unit is a prototype for approval, delivery site address and access constraints | Prototype approval and batch production are scheduled differently |
| Scope around the cabinet | Whether worktops, splashback panelling, adjacent tall kitchen units or flooring also form part of the same order | Tolerances where items meet have to be resolved in one drawing set |
Reading the configuration options on the product page
The tall dining cabinet sits in the Dining Cabinets / Sideboards collection for residential living projects, and its configuration list names made-to-measure sizing, material and finish options and project-tailored layouts. Read that as a description of how the reply to your enquiry will look: a proposal built around your dimensions rather than a fixed catalogue item with a sticker price.
If part of your display requirement is glazed, compare the glass-front dining cabinets in the same collection before you send anything. Choosing a solid-door tall unit over a glazed front changes shelf depth, backing material and lighting, so it is cheaper to decide now than after the carcass has been cut. And where you need a lower storage line beside the dining table rather than a full-height unit, the decorative dining cabinets are the companion range.
How the enquiry becomes production
SANTERSON works as a China-based manufacturer and one-stop supplier of furniture and building materials, so an approved cabinet drawing is usually only one line in a larger package. The cooperation steps set out on the interior design service page are project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up.
- Brief and proposal. Your drawings and the table above come back as a proposed layout with materials identified. Read this against the room, not against the render.
- Quotation and detail confirmation. Hardware grade, edge treatment, interior fittings and any integrated lighting are fixed here. Ask what is included in the quoted price and what is carried separately.
- Custom and OEM route. Where the cabinet has to match an existing joinery package or carry your own branding, the custom and OEM service covers bespoke finishes and materials. Confirm available options and minimum order quantities for your project.
- Production, logistics and handover. The logistics and door-to-door delivery service covers freight, packaging and container loading; the installation and after-sales support page lists on-site installation and inspection. Agree in writing which party handles site installation and local compliance in your country.
Freight terms, duties, transit time and the extent of local installation vary by destination and should be confirmed case by case for each project rather than assumed from marketing material.
Before you send it: a final check
Confirm these nine points, then attach your drawings
- Wall elevation with overall width, height and depth - or the range you are still deciding between.
- Clear internal heights you need for the tallest item you intend to store.
- Door type, hinge side and handle choice, checked against aisle clearance.
- A physical or coded finish reference, plus anything it must match on site.
- Whether lighting is required, and who runs the cable.
- Quantities, and whether one unit is a prototype for sign-off.
- Delivery address, access limits and lifting or stair constraints.
- Which adjacent items - worktops, panelling, tall kitchen units - share the same order.
- Your programme dates, stated as required on-site date rather than preferred date.
Send the brief while there is still time to change it
A complete enquiry costs you an hour of mark-up on drawings you already own. A thin one costs a re-draw, a re-quote and a delayed handover. If your tall dining cabinet has to sit inside a wider fit-out - kitchen cabinetry, wall panelling, flooring and lighting for the same building - send the whole package together so the tolerances where items meet are resolved once, by one team.
Start your enquiry
Open the tall dining cabinet page, attach the elevation and internal layout you have marked up, and use the contact page to send your required on-site date together with the rest of your project scope.