Comparing swim spas across suppliers is rarely straightforward. One quotation lists a jet count, another lists horsepower, and a third says only "fully equipped". This article uses the catalog data published for Outdoor Swim Spa WS-PC05CH as a worked example, so you can see exactly which line items to request from every supplier before you place an order.

1. Shell Dimensions and Water Depth

The first number to check is not length but depth, because depth decides what the unit is actually for. WS-PC05CH is listed at 5000 x 3000 x 900 mm. At a 900 mm shell depth you are sitting or lying in the water with your head above the rim; you are not standing, and you are not swimming laps. That makes this a hydrotherapy and relaxation cabinet rather than a swim trainer.

Within our own catalog the difference is easy to see side by side. WS-PC04CH measures 4500 x 3000 x 900 mm, while WS-PC06CH runs 6000 x 3000 x 900 mm. Same depth family, different plan area. If your site is a terrace, rooftop deck or a villa garden with a low retaining edge, the shallower cabinets sit more easily into a raised platform than a deep plunge shell.

Ask every supplier for three separate figures: outer length, outer width and internal water depth. Then confirm which one the quotation price refers to. A unit that fits through your access route but is 200 mm deeper than your deck allows will still fail on site.

2. Jet Count Against Pump Configuration

Jet count is the most commonly inflated number in swim spa marketing, and it means very little without the pump data next to it. The WS-PC05CH catalog entry lists 30 jets served by one water pump and one filter pump. Compare that with WS-PC04CH: a shorter 4500 mm shell, but 46 jets on the same single water pump and filter pump arrangement. A longer cabinet does not automatically mean a stronger massage.

The practical question for a buyer is whether the jet count is fixed or configurable. On our production line the jet layout follows the model variant and the options you select, so two quotations carrying the same model code can differ. Request the jet schedule for the exact configuration you are buying, together with the pump flow rate, not just a marketing headline number.

3. Total Connected Power

WS-PC05CH is listed at 2.45 kW total power. WS-PC04CH carries the same 2.45 kW figure with a different jet count, while WS-PC06CH rises to 3.25 kW because it moves to two water pumps for its longer shell.

Connected power is what your electrician needs, and it is where most sourcing mistakes happen. An electrical contractor in Sydney or Melbourne cannot size a circuit from the word "standard wiring". Ask the supplier for:

  • Total connected power in kW for the exact configuration quoted.
  • Supply voltage and phase (single-phase or three-phase).
  • Whether the heat pump is included in that figure or added separately.
  • Circuit protection and earthing requirements for the installed unit.

This matters more than it seems: a heat pump changes the load profile completely, and our catalog lists heat pumps as an option rather than as standard on this model. Never assume the base figure covers a heated configuration.

4. What Is Standard and What Is Optional

Read the equipment list twice. For WS-PC05CH the catalog shows one control system, one water pump, one filter pump, 30 jets and one LED light, with water jets, LED lighting and ozone as the stated features. The options are listed separately: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps.

Three of those options change the total landed cost materially:

  • Heat pump — decides whether the cabinet runs as a year-round spa or a warm-season one, and changes the electrical load.
  • Insulation — relevant for cooler highland or southern sites; it affects heat retention and running cost.
  • Steps — often treated as an accessory on a quotation but impossible to retrofit neatly once the cabinet is set into a deck.

Get two prices from each supplier: base configuration and fully optioned configuration. Comparing one against the other across three suppliers is the fastest way to spot a quotation that quietly excluded insulation or a heat pump.

5. Where WS-PC05CH Sits in the Range

ModelCatalog dimensionsJetsWater pumpsTotal power
WS-PC04CH4500 x 3000 x 900 mm4612.45 kW
WS-PC05CH5000 x 3000 x 900 mm3012.45 kW
WS-PC06CH6000 x 3000 x 900 mm3823.25 kW

The table shows why you should not read length as capability. WS-PC05CH sits between its two siblings on plan area, carries fewer jets than the shorter model, and shares its power figure with that shorter model. If your priority is massage intensity in a compact footprint, the 4500 mm variant deserves a look. If you need more seating length at the same depth, the 6000 mm variant is the next step up.

If your project calls for something other than a rectangular cabinet, our Customizable Shape Outdoor Spa covers square, round, oval and curved shells with an acrylic interior and structural reinforcement. For villa and resort schemes where the spa is a design feature rather than purely functional equipment, that route lets the geometry follow the landscape instead of the other way around.

6. Site Preparation and Access

A swim spa cabinet arrives as a manufactured shell, not as a civil work. Before you confirm an order, settle these with your builder or landscape contractor:

  • A level, load-bearing base sized to the outer footprint, with the plant access side kept clear.
  • Delivery route dimensions — gate width, turning radius, overhead clearance.
  • Drain and overflow arrangement, plus a plan for draining and refilling during maintenance.
  • Water supply point and, where relevant, the location of the control system for service access.
  • Dedicated electrical run with the correct phase and protection, installed before the cabinet is set.

Buyers who order the cabinet before the base and power are specified almost always end up paying twice: once for the unit and once for rework on site.

7. Freight, Documentation and After-Sales Scope

For an imported swim spa the equipment list is only half the deliverable. Our logistics service covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Confirm in writing which Incoterms apply to your quotation, who handles import clearance at the destination port, and whether cargo insurance is included or optional.

Then pin down the after-sales scope: warranty period and exclusions, availability of spare pumps, jets, controls and LED modules, and how a fault is handled when you are several thousand kilometres from the factory. A quotation that says "after-sales support" without naming parts and response arrangements tells you nothing.

Specifications quoted above are the catalog figures published for each model. Included equipment, jet layout and electrical requirements vary with the configuration you select, so confirm them against your own order documents before ordering.

8. A Six-Line Comparison Sheet

Send this to every supplier on your shortlist and compare the answers in one spreadsheet:

  • Outer dimensions and internal water depth for the exact model.
  • Jet count with pump type, quantity and flow rate.
  • Total connected power, voltage and phase for the quoted configuration.
  • Standard equipment versus optional items, priced separately.
  • Incoterms, freight mode, and who clears customs at destination.
  • Warranty terms, spare parts list and support arrangements.

Any supplier who cannot answer those six lines cleanly is asking you to buy on trust. Browse the full Swimming Pools and Swim Spas range to see how each model's figures differ, then send us the configuration you are considering — we will confirm equipment, power requirements and delivery scope for your site.

SANTERSON manufactures swim spas, outdoor furniture, bathroom ceramics, lighting, cabinetry and building materials in China and delivers to villa, hotel and resort projects worldwide. Send us your model, site dimensions and required options for a written specification and quotation.