A wardrobe package that looks flawless in the showroom can still be the wrong buy for a hotel, serviced apartment or villa development once the rooms are handed over to housekeeping. Glossy finish melamine wardrobes sit at the centre of that tension: they read premium under warm lighting, they are usually easier on the budget than lacquered or veneer doors, and they are also the finish most likely to expose edge banding, fingerprint and light-line problems if the specification is thin. Before you sign a purchase order, work through the checklist below and make the supplier answer each point in writing.

Start With the Scope, Not the Door Finish

Most weak proposals are not wrong about materials; they are incomplete. A wardrobe for a commercial project is built furniture that has to survive keys, trolleys, vacuum cleaners and daily cleaning agents, and it has to fit rooms whose walls are never perfectly square. So the first question is not "which gloss level" but what the price actually covers.

  • Are the carcass, doors, internal fittings, plinth or recessed base, and any overhead storage all included, or priced as extras?
  • Is the unit made to measure from site dimensions you supply, or is it a modular run of fixed widths that the drawing has been forced to fit?
  • Who resolves out-of-plumb walls and uneven floor levels — a scribe and adjustable leg detail on the supplier's side, or an allowance left for the local contractor?
  • Does the quotation include the internal layout you actually specified: hanging heights, drawers, shelves, trouser rail, lighting cut-outs, safe recess, luggage space?
  • Which party carries the risk of a mis-measured opening — the supplier who produced from your drawing, or the site contractor who signed off the dimension sheet?

A serious supplier will show you a dimension sheet per room type and ask you to confirm it before production starts. The Glossy Finish Melamine Wardrobes listing on our site states the same working basis: made-to-measure sizing, selectable material and finish, and a layout tailored to the project, with dimensions and selected specifications confirmed for each project. If a proposal does not contain that confirmation step, treat it as an open risk rather than a detail.

Read the Specification Sheet Line by Line

Ask for the make-up of every component in writing. Two quotations that both say "glossy melamine wardrobe, 600 mm wide" can be describing very different products.

Specification itemWhat a good answer looks like
Substrate and panel thicknessNamed board type and thickness for carcass, doors, back panel and shelves — not one blanket line covering the whole unit.
Decor referenceA supplier or laminate colour reference plus a physical sample. Names such as "high gloss white" mean nothing across factories.
Edge treatmentEdge banding material and thickness on all visible edges, including door edges and shelf fronts, with the joint method stated.
HardwareHinge, slide and handle brand or model, load rating for drawers, and whether soft close is standard or an upcharge.
Door systemHinged or sliding, track and wheel specification for sliding doors, and the clearance each system needs in the room.
TolerancesHow the unit is levelled and scribed at the wall, and the maximum floor deviation the design absorbs.
PackagingPanel-by-panel packing list with room and unit marks, so a site team can find parts instead of opening every crate.

Where the finish sits in a wider joinery package, ask for the same sheet for matching items. Wardrobe doors, Matte Finish Melamine Wardrobes in a second room type, and Two Tone Melamine Cabinets in the kitchenette should be specified to the same board, edge and hardware logic, or you will end up managing three different quality standards on one floor.

Test the Gloss Before You Commit to a Room Count

Gloss is where expectation and reality drift apart most often. Request physical samples of the door panel — not a printed brochure image — and evaluate them under the lighting you will actually install.

  • Reflection under raking light. Run a torch or downlight along the face of the sample at a shallow angle. Waves, orange peel and visible substrate telegraphing show up here long before they show up in a photograph.
  • Edge joint. Look at where the edge meets the face. A raised, discoloured or adhesive-starved line will be obvious on every door once a full floor is installed side by side.
  • Cleaning behaviour. Wipe the sample with the cleaning agent your housekeeping team uses, then check for haze and for residue at the edge. Gloss shows fingerprints; the practical question is how fast it comes clean.
  • Corner and handle detail. Check radiused corners, drilled hinge areas and handle fixings on a sample door, since these are the points that chip in transit and in use.

Then place the glossy sample against the other finishes in the scheme — wall panel, flooring, countertop, or Santerson Glass & Glossy Panels if you are using glossy wall surfaces — and confirm the sheen levels still work together. Two high-gloss surfaces in one room can read cheaply, and a wardrobe that photographs well on its own may fight the rest of the joinery once installed.

Check How the Proposal Handles Repeats and Consistency

Commercial work is about batches. A single prototype door can be excellent while a larger production run drifts in colour, sheen and panel flatness. Ask how the supplier controls that.

  • Are all rooms of one type produced from the same board batch, or will production be split across deliveries with different batches?
  • Is there a signed-off reference sample held at the factory and matched against each production batch?
  • What is inspected before packing, and can you see the inspection record for your order?
  • How are replacement panels handled if one arrives damaged — recoloured to match, or produced to the original specification with a known risk of slight variation?

This is also where an OEM and custom service earns its place in the proposal. If your design uses a bespoke decor, a non-standard door height, or a handle detail you have already specified elsewhere in the building, confirm that the factory is quoting it as engineered work with drawings to sign off — not as a "custom" label applied to an existing modular size.

Price the Whole Delivery, Not the Unit Rate

Built-in furniture is where landed cost bites hardest, because the unit price is only part of what reaches site. Break the number down before comparing bidders.

Cost lineQuestion to put to each bidder
Freight and IncotermsWhich term applies, what is included in it, and where the supplier's responsibility ends.
Packing and container planHow many units per container, how panels are protected, and whether partial deliveries are possible by phase.
Customs documentationWho prepares the commercial invoice, packing list and origin documents, and in what lead time.
Site handling and storageWhether crates can be delivered room-by-room or need a holding area on site.
InstallationWhether fitting is done by the supplier's team, supervised guidance for your contractor, or not covered at all.
Snags and sparesWhat happens after handover — who attends to damaged doors, replaced hinges, adjusted slides.

Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail with customs paperwork, packaging and container loading planning, shipment tracking and delivery to site. Our installation and after-sales support page lists on-site installation, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance. Ask for the exact scope, response commitments and exclusions in your contract language rather than relying on marketing copy — including for projects in Australia, where import terms, duties and installer arrangements should be confirmed project by project.

Seven Reasons to Push Back on a Proposal

  • A price with no component-by-component specification behind it.
  • No physical sample offered, or only a printed or digital colour card.
  • Drawings that show the unit in elevation but never in plan against the room and door swing.
  • Hardware listed as "standard" with no brand or model.
  • No dimension confirmation step before production, and no stated tolerance detail.
  • Delivery terms that stop at the port while your team assumes door-to-door was included.
  • Warranty wording that covers panels but not hardware, edges or on-site adjustment.

What to send when you request a wardrobe quotation

Room-by-room drawings with confirmed dimensions, the internal layout for each room type, the door system you want, the decor reference and sheen level, hardware preference, the lighting or safe provisions, your delivery location and phasing, and your target handover date. The more of that a supplier receives up front, the more comparable the bids will be — and the fewer change orders you will pay for after production has started.

Frequently Asked Questions

Is melamine a suitable finish for hotel wardrobes at all?

It is widely used in contract joinery because it is consistent, available in many decors and generally more economical than lacquer. Suitability depends on the board make-up, edge treatment and hardware specified, and on how the doors are cleaned — which is why the specification sheet matters more than the word "melamine".

Should glossy wardrobe doors be hinged or sliding?

Decide from the room, not the finish. Sliding doors save the swing clearance that a compact guest room may not have, but they need track and wheel hardware that can carry a full-height panel for years of daily use. Hinged doors give full opening access and simpler servicing. Specify both options in the same enquiry and compare the price difference.

How many rooms should be produced before the rest are released?

A common approach is to produce a first room type or a small pilot batch, install it, walk the room with housekeeping and the site contractor, then release the balance against that signed-off reference. Confirm the factory can hold the remaining production on the same board batch.

Can wardrobes match other joinery in the project?

They can, if decors, edge banding and hardware are specified together from the start. Ordering bedroom, kitchenette and storage items as one package with a shared specification sheet also simplifies delivery phasing and after-sales support.

SANTERSON has been manufacturing furniture and building materials since 2008, supplying made-to-measure built-in furniture and fit-out products for villa, hospitality and office projects worldwide. Send us your room drawings, decor reference and delivery location and we will return a component-level wardrobe specification and quotation.