A curio cabinet is one of the few built-in items in a villa or apartment fit-out that is judged at close range. Guests stand in front of it, look through the glass, and notice the edge of every shelf. Because Santerson Curio Cabinets are made to measure and specified project by project, the finished result depends almost entirely on what was written down and signed off before production started. This guide lists the finish details buyers should confirm, and how to confirm them in a way that survives site installation.
Start From the Product Record, Not From a Photo
The catalogue page for these cabinets describes configurable display cabinets for residential living projects, with finish, layout and dimensions specified to suit each space, and lists made-to-measure sizing together with material and finish options. That description is deliberately open. It tells you the item can be built to your opening and your finish palette, but it does not name a single board, hinge or glass thickness. Treat the product page as the starting point of a specification conversation, and put every decision into an approved drawing and finish schedule before an order is released.
A practical rule: if a detail cannot be pointed to on a drawing or in a written schedule, it has not been specified. Verbal agreement on "the same grey as the kitchen" is where most disputes begin.
The Finish Details Worth Confirming
1. Carcass and door substrate
State what the cabinet body, doors and shelves are actually made of, and keep that answer consistent across the whole unit. The site's custom and OEM material notes refer to wood, metals, engineered stone and laminates as the general material families available for bespoke work; confirm which of these applies to your cabinet, in which part of it, and at what thickness. For a display cabinet, the substrate matters most where the shelf spans an open width, because a thin board under glass and ornaments will sag over time.
2. Surface finish and sheen level
"White" or "oak" is not a specification. Confirm the finish system (paint, laminate, veneer or foil), the colour reference, and the sheen. A high-gloss door reads very differently under internal lighting than a matte one, and fingerprints show up in the opposite way. Where the curio cabinet must match cabinetry already specified elsewhere in the project, ask for the same finish code on both schedules rather than asking two workshops to match by eye.
3. Glass type, thickness and edge treatment
Confirm whether the panels are clear, low-iron, tinted or textured, the glass thickness, how the glass is seated and retained, and whether edges are polished. Tinted glass changes how contents look; a green cast on porcelain or collectibles is one of the most common complaints after handover. Also confirm which faces are glass and which are solid panels, since that decision affects both cost and cleaning access.
4. Lighting specification
If your scheme includes lit shelving rather than ambient light from the room, settle this early. The Santerson Illuminated Display Cabinet page notes that lighting specification and electrical details must be confirmed for the project, and that applies equally to any curio cabinet you intend to light. Confirm fitting positions, cable routes, transformer or driver location, switching, colour temperature, and which party supplies and connects the electricity on site. Lighting is the detail most often left to the last week and then resolved by surface trunking.
5. Hardware and door operation
Confirm hinge type and brand where a brand is required, soft-close or standard, handle or push-open, and whether doors are hinged or sliding. Sliding doors need clearance for the track; hinged doors need swing clearance from adjacent walls and furniture. Confirm lock requirements if the cabinet holds valuables, and who holds the key at handover.
6. Shelf layout and adjustability
Fix the number of shelves, whether they are fixed or adjustable, the pitch of the adjustment holes, and the clear height of each compartment. Collectors change their displays over the years, so a shelf that is glued or pinned in place becomes a limitation. Confirm load capacity per shelf for the items actually intended for display.
7. Tolerances, plinth and site interface
A made-to-measure cabinet meets a real wall, floor and ceiling that are rarely square. Confirm which dimensions are nominal and which are critical, how the unit is levelled and packed, whether a scribe or filler strip is provided, and how the finish is detailed at the plinth and at any skirting. Agree who measures the opening on site and at what stage of the building works, because a floor covering installed after measurement changes everything.
8. Protection, delivery and installation sequence
Glass-front cabinets are damaged most often in transit and in the weeks after installation while other trades are still working. Confirm packaging method, container or pallet handling, storage location on site, and where the cabinet sits in the installation programme. The services the site lists for project work include door-to-door logistics and on-site installation support, so it is worth confirming which scope applies to your order and what inspection items are signed off at handover.
A Simple Sign-Off Table
| Detail | What the written answer should contain |
|---|---|
| Carcass and shelf substrate | Material, thickness, moisture resistance where relevant |
| Finish system | Paint, laminate, veneer or foil; colour reference; sheen level |
| Glass | Type, thickness, edge polish, retention method, which faces are glazed |
| Lighting | Fitting type and position, driver location, colour temperature, switching, electrical responsibility |
| Hardware | Hinge or slide type, soft close, handle style, lock and keys |
| Shelves | Count, fixed or adjustable, compartment heights, load rating |
| Dimensions and tolerances | Made-to-measure drawing, who measures on site, scribe and packer details |
| Delivery and installation | Packaging, delivery point, storage plan, install date, snag list |
How This Fits a Custom Order
Because these cabinets are bespoke rather than stocked items, the same specification sheet works for other built-in display work in the project. If you are also specifying Santerson Wall Mounted Display Cabinets or matching tall cabinets, group them on one schedule so the finish codes, glass and hardware are decided once. Under the site's Custom & OEM Service, custom furniture design and prototyping, bespoke finishes and material choices are part of the normal enquiry process — so send the schedule with your enquiry instead of after a first quotation.
Send your opening dimensions, room drawings and finish references for the project, and the display cabinet specification can be reviewed against them before production is scheduled. Contact details are on the contact page.