A metal-frame modular wall system looks simple on a mood board: uprights, brackets, shelves, maybe some lighting and a door or two. On site it is one of the most coordination-heavy items in a joinery package, because it fixes dimensions, finishes, services and load paths long before the fit-out crew arrives. When buyers specify Santerson Metal Frame Modular Systems for a villa library, a hotel lounge or an apartment study, the drawing set they hand over decides whether production runs smoothly or turns into change orders. Below is the project information we ask for on every enquiry, and why each item changes the outcome.
1. The room dimensions you send are the ones we build to
These systems are made to measure, so a tape measure taken at one height is not enough. Report finished floor level and finished ceiling level, because a slab that varies across the wall or a service void above a gypsum ceiling changes the upright length. Note skirting and architrave depths, fixed panels or access hatches on the wall, switch plates, sockets and any recess the system must sit into. Send dimensions in one consistent unit, and mark which side of each opening you measured from.
Tell us what is on the wall today. A metal-frame system transfers load through the frame, so we need to know whether the background is masonry, light-gauge steel studwork, timber battening or an existing cavity, and where the structural elements sit. If shelving will carry books, ceramics, barware or equipment, state the intended load per shelf bay rather than assuming a generic figure; that is what determines bracket spacing and panel thickness.
2. Layout intent: open display, closed storage, or both
Decide how much of the wall should read as open shelving and how much should be concealed. Mixed arrangements are the usual answer in residential work, and they need a clear rule about where open bays end and doors begin. Share the room layout with furniture positions marked, since a shelf bay that collides with a door swing or a chair arm is a very expensive discovery at handover.
If the wall runs floor to ceiling, say so early. Santerson Floor to Ceiling Systems are configured differently from a waist-height run: the upper bays need access planning, and heavier or taller items belong lower down. For a lighter look, Santerson Floating Modular Shelves can be combined with the frame in some layouts, which affects where blocking must be built into the wall.
3. Materials and finishes, matched to the rest of the joinery
Frame colour, shelf material and surface finish are specified per project, not chosen from a fixed shortlist. Send the finish references you are already using elsewhere in the building so frames, panels and door fronts can be matched across rooms; a bronze frame that reads warm next to oak shelves can look completely different beside dark stone. If the system sits near kitchen cabinetry or wardrobe runs, share those drawings too, so one supplier can align handles, reveal lines and shadow gaps.
Environment matters as much as appearance. A wall system in a poolside villa room, a spa corridor or a coastal apartment needs different surface choices from a dry interior study. Describe the space honestly, including humidity sources and cleaning products planned by the facilities team, and we will confirm which materials and finishes suit that condition.
4. Integrated lighting and services
Lighting is where late decisions cause the most rework. If shelves are to be lit, decide at design stage whether you want shelf-edge lighting, vertical channel lighting or a lit niche, because cabling routes and driver positions must sit inside the frame build. Our Santerson Integrated Lighting Systems configuration is planned together with the layout, so drivers stay reachable for maintenance and cable exits land where the electrical contractor can actually chase them.
Send the electrical drawing or a marked-up sketch showing switch positions, dimming method, and whether the circuits are on site power or a dedicated feed. Confirm the supply voltage and plug standard for the destination country. Media walls need the same treatment: state the screen size, mounting method, and where set-top boxes, consoles and their ventilation will live.
5. Project schedule, delivery address and site access
Give us the practical dates: when drawings must be frozen, when the wall substrate must be finished, and when the system needs to arrive on site. Modular systems are installed after wet trades and ceiling work are complete, so an early delivery to a dusty, unfinished room creates damage claims nobody wants.
For international projects, the delivery address and access route change the packing plan. Confirm port or site address, container or air freight preference, who handles customs clearance, and whether there is a lift, goods hoist or stair constraint for long uprights. Our logistics and door-to-door delivery service covers freight arrangements, packaging and documentation; Incoterms, duties and transit windows are confirmed case by case for each destination.
What to send with your enquiry
| Information | Why it matters |
|---|---|
| Room type and country | Sets environmental exposure, supply voltage and freight route. |
| CAD or marked-up elevations with finished levels | Determines frame heights, bracket positions and clear openings. |
| Substrate and wall construction | Determines fixing method and load capacity per bay. |
| Intended loads and item types | Sets shelf span, panel thickness and bracket spacing. |
| Finish references from other joinery | Keeps frames, panels and doors consistent across the project. |
| Lighting and media requirements | Fixes cabling routes, driver access and switch positions. |
| Drawing freeze date and site delivery window | Aligns production with wet trades and installation sequence. |
A useful test before you send drawings: walk the wall with the layout in hand and name what sits on every shelf. If you cannot answer, the design is not ready for production.
How a SANTERSON enquiry moves from drawing to site
SANTERSON has operated as a furniture and building materials manufacturer in China since 2008, supplying project packages that combine joinery with the surrounding fit-out. Send your drawings through our project services team, who confirm space planning, material selection and product specification before production begins. Where a project needs non-standard dimensions, bespoke finishes or branded elements, the custom and OEM service covers prototyping and finish development alongside standard configurations, so a single supplier handles the wall system together with the cabinetry around it.
Installation follows delivery. Our installation and after-sales support covers on-site fitting, inspection and snag resolution, with spare parts available for later replacement. For Australian villa and apartment work, we have delivered joinery and furnishing packages on residential projects in Sydney, Melbourne, Perth and Willoughby, which helps when coordinating freight documentation and site sequencing across time zones.
Send your elevations for a modular wall quotation
Email drawings, finish references and your target delivery window to santerson@qq.com, or contact PHILLIP on WhatsApp +86 13928214007. Include the room type, wall construction and intended shelf loads so the first response can address configuration rather than ask for basics.
Configurations, material options and service scope are confirmed against the drawings and destination for each project; specifications quoted for one project do not automatically apply to another.