A swim spa quote is only comparable once every supplier has priced the same thing. For Outdoor Swim Spa WS-S38, most of the price difference between two offers sits in equipment options, site preparation and freight terms rather than in the shell itself. The checklist below is what we need from you to issue a firm quotation, and it is equally useful as a template when you approach any other manufacturer.

Start with the model reference, not a photo

Product images travel well across catalogues; model numbers do not. Quote the exact reference — WS-S38 — and state whether you want the standard configuration or one of the optional variants. Catalogued shell dimensions for this model are 3760 × 2080 × 1110 mm, which is the figure your designer should check against the planned pad, deck recess or terrace alcove before anything else is specified.

If you are shortlisting several models, list them separately in one enquiry. A request that says "something like this, around 3.8 m" invites an approximation back, and approximations cannot be compared.

State the installed configuration line by line

WS-S38 is a configurable hydrotherapy and swim spa, so the base specification is a starting point. The catalogue entry for this model records the following as standard-listed equipment; ask your supplier to confirm each item in writing for the configuration they are actually quoting.

ItemRecorded in the WS-S38 catalogue entry
Shell dimensions3760 × 2080 × 1110 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jets51 pcs, including 6 water columns
LED lighting4 pcs plus 12 small LED lights
Total power14.05 kW
Features shownWater jets, LED lighting, ozone, waterfall
Swim training systemNot listed for this model — ask if you need one

Options that appear in the catalogue range include additional control systems, UV sterilisation, extra water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option that exists on a longer shell may not be offered on WS-S38. Write the options you want into the request as a numbered list and require the supplier to answer each line with "included", "optional at cost" or "not available for this model".

Why this matters commercially: total power of 14.05 kW is a substantial electrical load. Whether a heat pump, sand filter or extra pump is bundled or added later changes both the quotation and the running cost, and it also changes what your electrician has to install.

Give the site conditions

A quote issued without site information is a quote for the spa only. Include:

  • The installation setting — above-ground on a prepared pad, semi-recessed, or fully recessed into a deck — with a dimensioned drawing or a marked-up plan.
  • Access route from the delivery point to the final position: gate widths, turning radii, steps, overhead obstruction, and whether a crane or long-arm lift would be needed.
  • Power supply available at site: single-phase or three-phase, voltage, available breaker capacity and the distance from the meter or distribution board to the spa.
  • Drainage and water supply arrangements, and who is responsible for the base slab, waterproofing and any surround cladding.
  • Exposure and climate at the position — full sun, coastal salt air, frost — because these affect insulation, cover and finish choices.

Where responsibility ends is the single most common source of dispute on a swim spa project. Say plainly in the request which works you expect the supplier to price and which your builder carries out.

Set the commercial terms you want quoted

As a one-stop furniture and building materials supplier, we receive enquiries that price only the product and then discover freight at the end. Put the delivery terms in the request so the comparison is honest:

  • Quantity, and whether later phases of the project will repeat the order.
  • Preferred Incoterm and destination — port, or door-to-door to a named site address — plus any import documentation you normally require.
  • Target delivery window and the date the spa must be operational, not merely shipped.
  • Packaging expectations for your access route, and whether you want cargo insurance quoted separately.
  • Currency, validity period of the quotation, payment stages, and what happens to the price if options change after deposit.

Ask for the documents that let you verify the offer

Request these with the price rather than after it: a signed specification sheet showing every option included; electrical schematics and the connection requirements for the quoted configuration; the filter, pump and control brand or type actually fitted; dimensional drawings with service access noted; warranty terms with what is excluded; and spare-parts availability for pumps, jets, controls and lighting. A supplier who cannot produce these has not quoted the same product as one who can.

What a good response looks like

A usable quotation should contain:

  • The model reference and a configuration table mirroring your numbered option list.
  • Separate line prices for the spa, each option, freight, insurance and any site items included.
  • Electrical load stated for the quoted configuration, with phase requirements.
  • Dimensioned drawings and a stated lead time from confirmed deposit to dispatch.
  • Named warranty period and scope, plus the spare-parts position.

Bringing it into a wider project package

Where a swim spa sits alongside other fit-out items — pergolas, loungers, outdoor dining sets, paving, wall cladding, bathroom fixtures and cabinetry — procurement runs more smoothly when one party coordinates the schedule. Our project services cover design coordination, custom and OEM production through logistics and door-to-door delivery, then installation and after-sales support, so the spa, the surrounding terrace furniture and the interior finishes arrive on one programme rather than several.

Send the model reference, your option list, a site plan and the electrical details, and we will return a configuration-specific quotation for WS-S38 with freight priced to your site.

Request a configuration-specific quotation
Email santerson@qq.com or contact us through the contact page, quoting "WS-S38 RFQ" with your site plan, option list and available power supply. Include the models you are comparing so we can advise which configurations are actually offered for each.