Why the Details in Your Enquiry Decide the Price You Get
An L shaped walk in wardrobe is not a catalogue item you order off a shelf. It is made to measure, with the layout, materials and finishes specified for one particular room. That means two buyers can send very different enquiries for what looks like the same wardrobe and receive prices that are not comparable at all. A request for quote is where you control the outcome: the more complete the information, the closer the quotation will be to the final delivered cost.
As a manufacturer of custom wardrobes and built-in furniture, we answer enquiries every day. The ones that come back with an accurate number in one round share the same structure. Below is what to put in your request, and why each item matters.
1. Room Dimensions and a Sketch of the Two Walls
An L shaped layout runs along two adjoining walls and meets at an internal corner, so the quotation depends on both leg lengths as well as the depth of each run. Send us:
- The length of wall A and wall B, measured in millimetres, plus the clear depth you want for each run.
- Floor to ceiling height, and whether the wardrobe should reach the ceiling or stop below it.
- Position of doors, windows, skirting, architraves, radiators, downlights and any air conditioning return.
- Out of plumb or out of square walls, uneven floors or suspended ceilings - tell us if you already know about them.
A hand sketch with dimensions marked is enough at the enquiry stage. If you have a measured drawing or an architectural plan in PDF, DWG or SketchUp, attach it. Where we can see the corner condition, we can price the corner carcass correctly instead of allowing for site adjustments later.
2. The Layout You Actually Want Inside
Walk-in wardrobe pricing is driven by what goes inside the carcass, not just by its footprint. Tell us how you intend to use each leg of the L:
- Hanging: short hanging for shirts and jackets, long hanging for dresses and coats, and how many rails you expect.
- Shelving: shelf heights, whether shelves are fixed or adjustable, and where you need deeper shelves for folded knitwear or bedding.
- Drawers: quantity, width, and whether you want shallow drawer sets for accessories or deep drawers for bulky items.
- Open versus closed: open shelving and rails, or doors on the run. Doors can be hinged, sliding, glass, mirror or solid panel.
- Extras: shoe racks, tie and jewellery trays, trouser pull-outs, laundry basket housings, ironing board housings, luggage shelf above the door opening.
- Lighting: whether you want integrated LED strips in the rails and shelves, and where the power feed will be located.
A simple room elevation with these items labelled is more useful than a paragraph of description. If you are still deciding, send the dimensions and your storage requirements and we can propose a layout for your review before quoting.
3. Materials, Board and Finish
Our walk-in wardrobes are made to measure with material and finish options selected per project, so state your preference or your budget direction. Specify separately:
- Carcass board: the substrate and its grade, and whether you need a moisture-resistant board for an ensuite-adjacent room.
- Door fronts: melamine, lacquer, acrylic, wood veneer or solid timber; matte or high gloss; flat panel, shaker or paneled profile.
- Colour: send a RAL, Pantone or a manufacturer colour code. A photo of a sample is not reliable for matching.
- Interior finish: whether the inside of the carcass matches the outside or uses a lighter decorative board.
- Edge treatment: edge banding colour and thickness, especially on open ends that face into the room.
- Glass and hardware: glass type where used (clear, bronze, smoked, frosted), hinge and slide brand preference, handle style or integrated handle profile.
If you have a finish already specified elsewhere in the project - kitchen cabinetry, wall panelling or doors - say so. We can match boards and profiles across built-in furniture so the joinery reads as one set of works.
4. Quantities, Project Type and Programme
One wardrobe for a single villa and twelve wardrobes across an apartment scheme are quoted and produced differently. Include:
- Total number of wardrobes, and the number of identical or repeated units.
- Project type: private residence, villa development, hotel, serviced apartment or show home.
- Required delivery month, and any site milestone the joinery must be ready for.
- Whether the room dimensions are already fixed by completed plastering and flooring, or still subject to change.
Programme information lets us confirm feasibility before you commit to a supplier. It also tells us whether repeated units can share tooling and production runs, which affects price on multi-unit enquiries.
5. Delivery Terms, Destination and Installation
A wardrobe quotation that stops at the factory gate is not a landed cost. Put these in the same request:
- Destination city and country, and whether delivery goes to site or to your warehouse.
- Your preferred Incoterm - FOB, CIF or door-to-door - and who currently handles customs clearance.
- Container situation: do you have consolidated shipments coming from other suppliers, or do you need us to plan the load?
- Installation: are you using local fitters, or do you want installation support? Tell us whether on-site guidance is needed for the corner units in particular.
- Packaging requirements if the wardrobes travel with other goods or need extra protection for glass fronts.
What to Expect Back From a Complete Request
When the request contains the items above, the reply you receive should be specific enough to compare against other suppliers. Check that it covers:
| Item in your request | What the quotation should state |
|---|---|
| Both wall lengths and depth | Carcass sizes per run, including how the corner unit is built and priced |
| Interior layout | Rails, shelves and drawers listed by quantity and size, not a lump sum |
| Board and finish codes | Named substrate, named colour code, door profile reference |
| Quantities and repeats | Unit price per wardrobe type, with repeated units identified |
| Delivery terms | Incoterm, destination, packing volume or container plan |
| Programme | Production timeline from confirmed drawings, and the drawing approval step |
Working Drawings Before Production
For made-to-measure joinery, the order should not start from an email price alone. We prepare production drawings from your dimensions and agreed layout for your approval, so every dimension, drawer stack and door opening is on paper before cutting begins. That step protects you on site: it fixes what was quoted, and it gives your fitters a reference to work to. For projects where we also handle design coordination, the same drawings feed into turnkey interior project solutions alongside the other joinery and finishes in the building.
A Short Checklist to Paste Into Your Enquiry
- Wall A length, Wall B length, depth per run, ceiling height - in millimetres
- Sketch or plan of the room with doors, windows and services marked
- Hanging lengths, shelf count, drawer count, door type and glass type
- Board grade, colour code, door profile, handle style, hardware preference
- Quantity of wardrobes, number of repeats, project type
- Required delivery month and site milestone
- Destination, Incoterm, packaging and installation expectations
- Drawings or photographs of the space, if available
Send that much information and a made-to-measure quotation can be prepared from one round of correspondence rather than several. If your drawings are not finished yet, send what you have along with your storage requirements - we can review the space and propose a layout before pricing.
Send us your dimensions and layout. Our team reviews each walk-in wardrobe enquiry against the actual room conditions and returns an itemised quotation for the carcass, interior fittings, doors and finishes you specified. See the L Shaped Walk in Wardrobes collection for layout references, or contact us to start a quotation.