A ten-metre swim spa rarely arrives on site as a single line item. When the same villa or resort package also carries outdoor lounge sets, paving, lighting and bathroom fixtures, the swim spa becomes a coordination problem before it becomes a purchase. The notes below use our Outdoor Swim Spa WS-S10-T to show how procurement teams on multi-product projects should scope, price and sequence this category so the number in the budget is the number that lands on site.

Start With the Configuration, Not the Model Number

Two projects can both write "WS-S10-T" into a bill of quantities and end up with different quotations. The catalog specifications for this model list overall dimensions of 10000 x 2200 x 1420 mm, one control system, one swim training system, two water pumps, one filter pump, 76 jets in total, one LED fitting together with 40 small LED lights, and a total power figure of 7.65 kW. Those figures describe the standard catalog build. What changes the price is everything sitting outside that list.

The optional accessories catalogued for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one moves the cost, and each one also moves something else: the electrical load, the plant space you need beside the shell, the lead time, and sometimes the structural allowance under the deck. Budget the configuration first, then match model numbers to it.

The three questions that decide the quotation

  • Which treatment and heating package? Ozone appears in the standard feature set for this model. UV sterilisation, a heat pump and sand filtration are separate selections, and they are usually where a low early estimate starts to drift.
  • Is the swim training system included in your build? The WS-S10-T catalog entry lists one swim training system as fitted equipment. A closely related model in the same series carries the same shell dimensions but does not list that system, which is exactly why a specification should name the equipment schedule and not just the size of the pool.
  • What does site access allow? A 10 m x 2.2 m shell needs a delivery route, a crane or lift plan, and a prepared base. None of that shows up in a product price.

Budget Line by Line: Base Unit, Options, Site Works, Logistics

On multi-product projects the swim spa line usually splits into four cost buckets. Collapsing them into one number is the most common cause of a late variation.

Cost bucketWhat to lock down before you price it
Base unitCatalog dimensions, jet count, pump set and control system as listed for the selected model; confirm which features are standard rather than reading them off a marketing summary.
Options and accessoriesHeat pump, UV sterilisation, sand filtration, insulation, steps and any additional pumps. Price these against the electrical and plant space you actually have.
Site and services worksDeck or plinth preparation, access route and lifting, power supply sized to the confirmed equipment load, drainage, and any local approvals. These are local costs and belong with your local contractor.
Inbound logistics and installationPackaging, container loading, freight mode, customs paperwork and delivery scope. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail with the accompanying documentation; installation and after-sales support are handled as a separate stage of the project.
Figures quoted above come from the catalog specification sheet for this model. Treat them as the starting point for a configuration review, not as a fixed price or a guarantee of performance, compliance or delivery time for your site.

Scope It With the Rest of the Outdoor Package

Where a swim spa creates real value on a project is in what surrounds it. Poolside loungers, an outdoor furniture collection for villas and resorts, pergolas and screens, plus the wall and ceiling finishes of the adjacent loggia are normally bought from different suppliers on different schedules. That is where the coordination cost sits: mismatched deck levels, cladding installed before the plant access panel was located, lighting positioned around a splash zone nobody had defined.

Working through one supplier for furniture and building materials keeps those interfaces in a single production plan. Our turnkey project solutions cover villas, hospitality and office projects across design consultation, material selection, manufacturing, project management and site coordination, with custom and OEM work available where finishes or dimensions need to match the rest of the package.

Sequence the swim spa early

  • Concept stage: confirm the intended use — lap training, hydrotherapy, or family recreation. That decision drives length, jet layout and whether a separate relaxation area is required.
  • Design stage: fix the equipment schedule, then hand the electrical and plant requirements to the services engineer rather than waiting for production drawings.
  • Procurement stage: order the shell and options together so the base unit and accessories arrive in one shipment window.
  • Site stage: complete the base, power and access before the shell arrives; book the lifting operation with the same window as delivery.

A Practical Specification Checklist

  • Catalog dimensions and the tolerance you will build the deck to.
  • Confirmed equipment list: pumps, jets, control system, lighting count, and whether the swim training system is included.
  • Total power figure for the selected configuration, signed off by your electrical contractor against local supply conditions.
  • Water treatment choice — ozone, UV, sand filtration — recorded in writing, not assumed from a brochure.
  • Insulation and steps if the project sits in a cooler climate or has limited poolside access.
  • Named delivery address, Incoterms and who carries customs clearance.
  • Snag list and handover record at installation, with spares identified before shipment.

Common Budget Traps on Multi-Product Projects

The first is comparing models across a catalogue by size alone. Two shells of the same length can carry different pump counts, different jet totals and different swim training arrangements, so the price gap is usually explained by equipment rather than by the builder's margin. The second is pricing the unit without the accessories and then absorbing them as a variation once the configuration review is done. The third is leaving site works out of the supplier conversation entirely — the base, power supply and lifting are local costs, and they need to be in the project budget from day one even when the shell ships from our factory.

Send us your swim spa configuration

Share the model reference, the options you want included, the delivery location and the rest of the outdoor or interior package on the same project. We will confirm the equipment schedule and quote the supply scope against it.