A cabinet proposal that looks complete on paper can still leave a buyer exposed at the quotation comparison stage. Two suppliers may both quote a glass front PVC cabinet, yet deliver very different drawings, hardware sets and tolerance statements. The checklist below shows what to verify in a written proposal before you place an order for this Santerson Glass Front Pvc Cabinet or any comparable PVC kitchen cabinet in a villa, apartment or hotel fit-out.

1. Does the proposal state what is configurable and what is fixed?

The product information published for this line describes made-to-measure sizing, material and finish options, and a layout tailored to the project, with dimensions and selected specifications to be confirmed for each order. That wording matters. A serious proposal should mirror it item by item rather than selling you a standard catalogue size.

Read the specification block and ask whether each of the following is written down or left implied:

  • Overall height, width and depth for every unit, including wall units, base units and any tall housing
  • Door construction and how the glass is retained in the door frame, including the glass type and thickness you are being quoted
  • Carcass material and edge treatment, and the finish specified for the doors
  • Interior fittings: shelf spans and thickness, drawer configuration, and any integrated lighting

If a line item simply says "as per standard", request the drawing that defines that standard. Ambiguity here is where variation orders appear later.

2. Are the drawings at project scale, not a mood image?

A render sells the look; a dimensioned drawing protects the budget. In our review of typical proposals for this product family, the useful difference is whether the manufacturer supplies elevations keyed to your room, with clear opening widths, appliance recesses and service gaps shown.

Ask for:

  • Plan and elevation drawings with levels referenced to your finished floor level
  • A setting-out drawing where the run meets a wall, doorway or window reveal
  • Cut-out schedules for any integrated appliance, sink or worktop
  • Confirmation of how the glazed doors align with adjacent solid doors in the same run

Where a manufacturer offers design and production coordination, as SANTERSON describes on its interior design service page, use it before you sign. Getting drawings reconciled with your architect or site team in advance is far cheaper than resolving them during installation.

3. Is the glass front specified, not just named?

"Glass front" covers a wide range of assemblies. In the proposal, look for the glazing description, the frame profile that holds it, and the finish of that profile. SANTERSON publishes several related configurations under the same roof, so comparing your quotation against the published pages is a quick way to check that what you are being quoted matches what you pictured:

Ask the supplier to name the exact finish code and glazing option for each door in the schedule. A proposal that lists finishes by name is easier to check on delivery than one that says "white gloss".

4. What does the price actually include?

Cabinet quotations diverge most often on scope, not unit rate. Before comparing numbers, put every offer into the same column structure:

Scope itemWhat to confirm in writing
GoodsUnit list with sizes, finishes and hardware per line; spares such as extra shelves or handles
PackagingPack type and container loading plan for the quantity ordered
Freight and clearanceIncoterms for your order, documents supplied (commercial invoice, packing list, certificate of origin), who handles customs clearance at destination
Site deliveryWhether delivery reaches the project address or a port or depot, and who moves goods on site
Installation supportWhether installers attend, or whether the manufacturer supplies fitting drawings and guidance for your local trades
After-salesWhat is covered, how replacement parts are supplied, and the process for reporting a snag

SANTERSON's service pages describe freight forwarding with customs paperwork and door-to-door delivery, plus installation, inspection of snags, spare parts and maintenance support. Treat those as service descriptions to be confirmed against your own order terms: transit time, duties, installers attending your site and warranty scope should all appear in your contract documents rather than be assumed from a website.

5. How are tolerances and site conditions handled?

A made-to-measure cabinet is only as good as the survey behind it. Ask who measured, when, and against what reference. For a project where you are not the party taking the measurements, request the manufacturer's tolerance sheet — the acceptable variance for floor level, wall plumb and corner squareness — and pass it to your site contractor before the first fix.

Also settle in writing:

  • Which party re-measures after flooring and plasterboard are complete
  • The cut-off date after which dimension changes carry a cost
  • How site deviations discovered on delivery are resolved, and by whom

6. Is the sample or prototype stage real?

For PVC door faces and glazed fronts, order a finished sample door or a small test section before signing off a full set. You are checking three things that photographs cannot show: how the finish reads under your own lighting, how the glazing sits in the frame at close range, and how the edge detailing holds up on a cut sample. SANTERSON's custom and OEM service page describes design and prototyping work alongside material and finish selection, so ask which stage of that process your order sits in and what you receive at each step.

7. Does one supplier understand the whole fit-out?

Kitchens rarely sit alone in a project package. Flooring, wall panelling, doors, lighting and bathroom fixtures all touch the same drawings and the same site programme. When you assess a proposal, note whether the manufacturer can coordinate cabinetry with those adjacent trades — matching veneers, aligning reveals, sequencing deliveries so the kitchen arrives when the room is ready.

For multi-room work this is where a single supplier reduces administrative load: fewer drawings to reconcile, one production schedule and one delivery window instead of several. It also keeps finish names consistent across packages, which prevents the common problem of two "oak" tones that do not match on site.

Before you sign: confirm every dimension and finish in your own specification sheet, and ask the manufacturer to countersign it. The published product description for this line states that dimensions and selected specifications are confirmed per project — hold that as the contractual baseline.

Putting the checklist to work

Score each proposal on the seven points above. A manufacturer that answers all of them with documents — dimensioned drawings, a finish schedule naming each door, a scope table covering freight through after-sales, a tolerance sheet and a physical sample — is quoting from an understood process. One that answers with assurances will transfer risk to you at installation.

Send your room drawings and target programme, and we will return dimensioned proposals for the kitchen cabinet package, including glazed PVC doors, matched to the rest of your project fit-out.