A custom arched niche and a full house of built-in wall cabinets rarely fail at the drawing stage. They fail earlier, in the brief. Arched openings, flush wardrobe fronts, integrated vanities and stone countertops all have to agree with each other before a single panel is cut, which is why the information you hand over matters more than the mood board. The arched niche & full house custom wall cabinet project we delivered shows what a complete brief makes possible: an arched display niche with built-in lighting, floating shelves, a full-height seamless wardrobe across one bedroom wall, a vanity table with an arched textured glass window, and a double sink vanity countertop in natural green marble for the bathroom.

The list below is the information we ask project owners, designers and builders to send at first contact. Everything after it is production detail.

1. The rooms, in the order you want them treated

Tell us which walls are involved and what each one has to do. "Bedroom wall: full-height hidden storage plus a display niche" is a usable sentence. "We want built-ins" is not. For a whole-house package, list the spaces in priority order, because cabinetry for one room often sets the material palette for the rest.

  • Which rooms get custom cabinetry, and which stay off-site furniture
  • For each wall: storage type (hanging, drawers, shelves, closed display), plus anything that must be open
  • Appliances, basins, taps, lighting and sanitaryware already chosen for those rooms, with their model sheets

2. The arch itself: what actually has to be specified

An arch is the item most often described in words and never measured. To quote an arched niche or an arched wardrobe door precisely, we need geometry, not adjectives.

ItemWhat to send
Arch typeFull semicircle, segmental (shallow) arch, or a soft-radius head. The curve changes both tooling and cost.
Span and riseOpening width plus the height of the curve from its springing line. If the drawing only gives an overall opening height, tell us where the curve is meant to start.
Radius or diameterWhere the designer has fixed it. Otherwise state whether the curve may be adjusted to standard radii.
Arch applicationNiche head, panel detail, door top, or doorway. An arched niche lining and an arched paneled wardrobe front are different fabrications.
ContinuityWhether the arch repeats in other rooms, and whether it should match an existing arched opening on site.

If your design also involves curved openings elsewhere, send those dimensions at the same time. Arched joinery that has to meet arched French doors or a flush wall-aligned door should be dimensioned against the same survey, not two separate ones.

3. Surfaces and materials by name, not by photo

A reference image tells us the look; a material schedule tells us what to build. For every surface in the package state the board or substrate type, the finish (veneer, lacquer, melamine, acrylic, glass), and the colour reference. Warm wood grain across bedroom, hallway and vanity fronts is one of the easiest ways to make a full-house scheme read as one design, so decide that palette before we quote.

  • Panel material and core, with the finish system for each face
  • Colour or grain reference: brand code, physical sample, or a stated tolerance to match an existing floor or door
  • Stone or engineered stone for countertops and niche linings, including slab name and edge profile
  • Hardware: hinge and runner brand if specified, and whether you want handleless fronts

For wet rooms, count the stone and marble surfaces as part of the joinery brief rather than a separate purchase. In our project the bathroom countertop was fabricated as a double sink vanity top in green marble with the veining run across the bowl cut-outs, which only works if the basin type is known before fabrication.

4. Storage logic and internal layout

Full-height wardrobe walls look minimal from the front and are highly specific inside. Send the hanging heights you need, the number and depth of drawer zones, shelf spans, and any items that must be housed exactly: a vanity stool, an ironing station, a laundry hamper column, a coffee machine.

Where the wall mixes closed storage with open display, say how much of each. A full height storage wall with a run of open display niches and floating shelves needs the shelf spacing set to the collection being displayed, so send artwork or object sizes if they matter.

5. Lighting and services, decided before fabrication

Backlit niches and shelf lighting are the detail most often left too late. LED strips inside an arched niche need a rebate or channel in the panel, a driver location that stays accessible, and a switch or sensor point on site. Send the lighting layout with the joinery drawing, along with any vanity power, mirror backing, plumbing wall set-out and floor finishes at their final build-up height.

Where cabinet lighting is part of the package, specify it as integrated cabinet lighting in the schedule with the colour temperature and control method you want, so the wiring allowance is built into the panels instead of added on site.

6. The documents that let us quote accurately

  • Room-by-room plans with overall wall lengths and clear heights, plus ceiling and skirting details
  • Elevations of every wall to be fitted, marked with the arch geometry from section 2
  • A material and finish schedule (one line per surface), and the appliance, sanitaryware and tap schedules
  • Photographs or a site video where existing conditions are irregular: out-of-plumb walls, uneven floors, beams, radiators
  • Target programme: survey date, design sign-off date, required delivery window, and who is on site when the cabinetry arrives

Our own process for these packages runs from space measurement through 3D design, production, delivery and on-site installation, so a brief that already contains measurements and schedules shortens the first loop considerably. Site survey and 3D rendering are part of the one-stop wall solution, but they come after we understand the scope.

A quick test before you send the enquiry

Read your brief and check that four things are written down: which walls, which arch dimensions, which named materials, and which services (power, light, plumbing) sit inside the joinery. If any of those four is missing, the quotation you receive will be an estimate rather than a price.

What good looks like: two worked examples

Arched niche plus bedroom wall and bathroom vanity

In the arched niche project, the brief fixed three things early: the arch was to repeat in the niche head and in a textured glass window next to the vanity; the wardrobe wall had to read as one continuous panelled surface with no visible handles; and the bathroom top had to be natural green marble rather than engineered stone. With those decisions made, the niche could be lined and lit, the vanity table could be built with drawers beneath an arched glazed screen, and the countertop could be fabricated around two basins in one slab.

Whole-house cabinetry with a different brief

A comparable mid-century modern whole house custom furniture project started from the opposite direction: warm wood tones, travertine accents and curved lines, with an entrance cabinet, a living room sideboard combining floating shelves and closed cabinets, an integrated bay window cabinet and bed platform, and a barn door for the bathroom. Same one-stop process, different brief, and the difference in outcome came entirely from what each client specified.

Common gaps in first enquiries

  • Arches drawn but not dimensioned, so the curve has to be assumed for pricing
  • Materials named as "oak look" with no finish system or sample, which invites a substitution later
  • Appliances and basins chosen after the cabinetry is quoted, forcing cut-outs to change
  • Lighting left to the electrician, so panels arrive without channels or driver access
  • No final floor build-up height, which changes every cabinet height on that wall

Questions we are asked most often

Can you match an arch already built on site?

Yes, with a survey of the existing opening. We record its span, rise and springing level and set out the new joinery to that geometry rather than to the drawing.

Can one manufacturer really supply niche, wardrobe, vanity and countertop together?

That is what a full-house wall package is for. As a furniture and building materials manufacturer, we fabricate the panels, doors, vanity units and stone tops against one set of dimensions, so the reveal between a wardrobe front and a niche lining is controlled in the factory instead of on site.

What if my design is still at concept stage?

Send what you have. Space planning and 3D rendering are part of our service, so we can develop a buildable version from a concept layout and return elevations for your sign-off before production begins.

If you have drawings or site measurements for an arched niche or a full house of custom wall cabinets, send them with your room list and finish schedule and we will return a project-specific quotation. Panel material, wood colour, arch shape and storage layout are all made to your space.