A bar unit looks like a single line on a joinery schedule, but it is really an assembly of carcass, door fronts, worktop, glazing, lighting, appliances and fixing details. That is why enquiries for Santerson Integrated Bar Systems move fastest when the buyer sends drawings, room context and a short list of decisions before asking for a price. The checklist below covers what to gather, what the product page deliberately leaves open, and which questions to put in writing so the specification does not drift during production.
What This Product Line Actually Covers
Integrated bar systems sit inside the Bar Cabinets collection on santerson.com, alongside Santerson Compact Bar Cabinets, Santerson Glass Front Bar Cabinets, Santerson Island Bar Units, wall-mounted units and tall bar cabinets. The collection is written for residential living projects, where the joinery has to read as part of the interior rather than as a stand-alone piece of furniture.
The published configuration options are short: made-to-measure sizing, material and finish options, and a layout tailored to the project. The page does not fix a standard width, a standard height, a named board substrate or a hardware brand for this line. Treat that as an invitation to specify rather than a gap to guess at. In practice your enquiry carries the specification: what you send in week one becomes the basis of the drawing, the quotation and the production order.
Documents Worth Having Ready
You can send a photograph and a rough width and still get a reply, but that reply will come back as a list of questions, and every round trip costs days. These are the documents that let a manufacturer price the work in one pass.
| Document | Why it matters for a bar unit |
|---|---|
| Floor plan with the bar wall dimensioned | Sets overall length, height and depth, plus how the unit meets returning walls, skirting and the finished floor level. |
| Elevation of the bar wall, including adjacent joinery | Shows where the bar starts and stops relative to kitchen cabinetry, panelling and openings, so the run is coordinated instead of patched on site. |
| Section through the counter zone | Clarifies worktop thickness, splashback height, toe recess, and whether services run behind or beneath the unit. |
| Appliance list with model numbers | Fridge, wine cooler, ice maker, dishwasher or kegerator each need their own cut-out, ventilation route and door-opening direction. |
| Services layout | Power points, under-counter outlets, water supply and waste for a sink, and low-voltage feeds for lighting all have to be positioned before the carcass is built. |
| Finish schedule | Door front material, paint or lacquer colour reference, veneer species and grain direction, glass type, metal trim finish and worktop choice. |
| Room context | Flooring type and thickness, wall build-up, ceiling height and adjoining furniture. Bar joinery is usually aligned to something else in the room. |
| Site and delivery information | Project address, floor level, lift or stair dimensions, access hours, and who receives the goods. |
| Programme | The date joinery must be on site, working back from the trades that depend on it: electricians, plumbers, stone fixers and floor layers. |
Decisions to Settle Before Asking for a Price
1. Which form of bar unit the plan needs
An integrated system is designed to disappear into the wall lining: matching panels, concealed handles, and doors that close a full service station when the bar is not in use. If the brief only needs bottle and glassware storage with a small prep area, a compact cabinet may be the better buy. If the bar sits in the middle of an open-plan living space and works from both sides, start from an island unit instead. Settling this first stops you pricing a configuration that does not suit the plan.
2. How the bar is used day to day
Write down the service the bar has to support, because storage and services follow use. A dry entertaining bar needs glass storage, bottle shelving, drawers for tools and a clear worktop zone. A wet bar adds a sink, tapware, water supply, waste and often an ice maker. A wine-focused bar needs a temperature-controlled cooler with the ventilation clearance that unit requires, plus racking sized to the bottle format you actually buy.
3. Appliances first, joinery second
Appliances are the least flexible part of the build, so send model numbers early and let the carcass be built around them. Confirm door swing and whether the door is reversible on site, total clearance for ventilation, cable and plug position, and whether the appliance is designed for built-in or freestanding installation.
4. Doors, glass and lighting
If you want display without visual clutter, compare glass-front options in the same collection against a fully concealed integrated front. Decide between clear, frosted, ribbed or smoked glass, the frame finish, and whether the shelving behind the glass is lit. For lighting, settle colour temperature, where the driver sits for future servicing, and how switches are reached from the working position.
5. Finishes and how they will be approved
Veneer grain direction, lacquer sheen and metal trim tone all read differently on a screen than on site. Ask which samples can be issued for sign-off, then keep the approved finish schedule with the job number so later batches can be matched.
Questions to Put to the Supplier in Writing
- What carcass construction is used, and what is fixed versus specified per project?
- Which board substrates, veneers, lacquers and laminates are available for this line, and where are their limitations?
- Which hinges, slides and lifts are quoted, and can they be substituted on request?
- Which worktop materials can be supplied with the unit, and who fabricates and fits cut-outs for sinks and hobs?
- Who signs off the shop drawing, and how is price handled if a change comes after approval?
- How are made-to-measure tolerances resolved on site: scribes, adjustable feet or trimming?
- What is the production sequence of deposit, approved drawings, production window and shipment?
- Which documents travel with the shipment, and what inspection record comes with the goods?
SANTERSON describes its route from project brief and design proposal through quotation and detail confirmation to production, shipment and follow-up, with design coordination, custom and OEM work, logistics and after-sales support listed as services. That matters here because an integrated bar usually arrives inside a wider joinery package. It is worth asking whether the same team is producing the kitchen, wardrobes and panelling around it: one drawing set covering all the timberwork reduces the risk of mismatched finishes and clashing site levels.
A Simple Enquiry Template
Subject: Enquiry, integrated bar system, [project name], [city]
1. Scope: One integrated bar system to the dimensions on the attached elevation, as part of a wider living-room joinery package.
2. Drawings: Floor plan, bar-wall elevation and counter section attached; PDF plus source file where available.
3. Services: Under-counter fridge model, sink and tapware, water supply and waste positions, power and lighting feeds as marked on the drawings.
4. Finishes: Door fronts in [material and colour reference], worktop in [material], metal trim in [finish]. Samples required before production.
5. Programme: Joinery required on site by [date]; drawing approval needed by [date].
6. Site and delivery: Address, floor level, access constraints, receiving contact.
7. Please confirm: construction method, hardware schedule, worktop scope, time to drawing approval, production window, delivery terms, and what after-sales support covers.
Why Bar Enquiries Stall
Most delays are administrative rather than technical. A photograph with no dimensions cannot be quoted. An appliance named only as "under-counter fridge" cannot be housed. A finish described as "matching the kitchen" has no reference until someone issues a sample. And when bar joinery is ordered separately from the cabinetry around it, level and colour mismatches surface at installation, where fixing them costs far more than agreeing them on paper.
If you are comparing options across the range, the built-in furniture section and the wider product catalogue show how bar cabinets sit next to wardrobes, kitchen cabinetry, panelling and media walls. That is useful when one package has to carry a consistent finish through several rooms.
Common Questions
Can an integrated bar system be sized to an existing opening?
Yes. The line is offered with made-to-measure sizing and a project-tailored layout, so send the clear opening dimensions along with finished floor level and wall build-up, and let the external dimensions come from the drawing.
Is there a standard width or height?
The product page lists made-to-measure sizing rather than fixed modules, so do not plan around an assumed size. Request the dimensions that apply to your elevation and confirm them on the approved drawing.
Can a bar unit be ordered without other joinery?
Yes. It is listed within the Bar Cabinets collection and can be specified as a single item. Ordering it with adjacent cabinetry simply makes finish and level coordination easier.
What speeds up a quotation most?
An elevation with dimensions, an appliance list with model numbers, a services layout and a finish schedule. Those four items usually remove the first two rounds of questions.
Next Step
Assemble the drawings, appliance list and finish references, then send them with the template above. If you want to test the configuration choice before committing, compare tall bar cabinets and wall-mounted bar units against the integrated option, then open the conversation with the specification already in place. Enquiries go through the contact page.