A purchase order is not a brief. When a villa developer, resort operator or interior fit-out contractor sends nothing more than a product name and a quantity, the factory returns exactly what was asked for — and often exactly what does not fit the site. If your project involves a modern aluminum outdoor dining set and sun lounger, the difference between one production run and three revisions comes down to what you put in front of the manufacturer before the first sample is built.
Below is the information we need from project teams, and why each item changes the outcome. It applies to this collection and to any outdoor programme you are sourcing for a villa, hotel pool deck or restaurant terrace.
Start with the site conditions, not the catalogue number
The same aluminium frame behaves differently on a shaded courtyard terrace, an exposed beachfront deck and a hotel pool edge where chlorine aerosol settles on every surface. Tell us where the furniture will actually stand, and describe it in concrete terms:
- Exposure — full sun all day, partial shade, or covered by a pergola or hardtop?
- Distance from salt water, and whether the deck is washed with chlorinated splash-out on a regular basis.
- Whether pieces sit on timber decking, porcelain pavers, concrete or grass, which decides leg levelling and foot pads.
- Typical daily use: private family dining for a handful of guests, or a rotating cover count in a food-and-beverage operation.
This is not a formality. Frame treatment, sling mesh choice and cushion fabric are specified from those answers. A lounger range built around quick-dry textilene mesh suits high-turnover pool decks precisely because the surface drains and dries between guests; a powder-coated aluminium frame with weather-resistant cushions is what a coastal villa dining setting needs to hold its finish through salt air and rain.
Give us dimensions you can defend on site
Custom dimensions are available on this collection, which is useful — and dangerous if the numbers arrive vague. Send us:
- The clear opening of the dining area, with the walkway allowance you intend to keep behind each chair.
- Table height and seat height if your project already has bar-height or counter-height seating elsewhere; mixing heights across zones is a common and avoidable error.
- Storage location and its door widths. A lounger that cannot pass the store-room door becomes a permanent outdoor fixture.
- Whether the layout must accommodate wheelchair access or an accessible route, since armrest style and chair spacing affect both.
If you send a plan drawing rather than typed numbers, we can check the setting-out against our own build dimensions and flag conflicts before tooling starts. That single step removes most dimension-related rework.
Specify finishes as decisions, not adjectives
"Modern" and "premium" mean different things to two different buyers. Convert them into three choices:
Frame colour and coating
Powder-coated aluminium is the base construction on this range, and the colour can be matched to your palette. Send a RAL reference or a physical sample of the adjacent element — pergola post, railing, window frame — rather than a photograph.
Tabletop
Slat tops in an aluminium or teak-look finish drain rainwater quickly and need none of the oiling that solid timber demands. Where a warmer surface is required, teak accents or a teak-look slat achieve the look without the maintenance cycle. State which you want and we will build to it.
Cushion and sling materials
Send the fabric code, not just a colour name, and tell us whether cushions will be stored indoors overnight. That answer determines the fabric weight and the cover construction we recommend.
Describe the lounger requirement by position count
Sun loungers are where projects most often go wrong, because "loungers" is treated as one line item. Specify:
- How many recline positions you need and whether they must lock for guest safety.
- Static sled base, wheeled for flexible deck layout, or folding where storage is tight.
- Whether loungers pair with a side table or an umbrella base, since the base diameter affects the lounger footprint.
Where a pool deck needs volume and rapid changeover, our aluminium sling sun lounger collection covers sled-base, wheeled and folding versions with adjustable backs in one family. Where a villa terrace should read as one designed set rather than separate purchases, the aluminium and teak-look slat dining set with adjustable sun lounger keeps the dining and lounging pieces on the same design language.
Tell us how the order will be delivered and installed
Outdoor furniture is bulky, and freight decisions belong in the brief, not after production. Include:
- Delivery address and the receiving conditions — ground floor or lift, dock height, delivery window restrictions for a live hotel.
- Your preferred shipping terms (Incoterms) and whether you want consolidated shipment with other categories from the same project.
- Whether assembly on site is in-house or ours, and how many pieces need to be usable on a specific opening date.
Our logistics and door-to-door delivery service covers freight by sea, air and rail with the associated paperwork, and our installation and after-sales support handles on-site fitting and inspection. Confirm transit terms, duties and warranty scope for your specific country with us in writing — we do not treat published marketing figures as a contract.
State quantities and the phasing you actually expect
Split delivery across two villas or two pool zones? Say so at the outset. Phasing changes how we pack, how we hold spare production capacity for the second tranche, and whether a single colour run is more efficient than two.
A brief that works — the short version
- Site: exposure, distance from salt or chlorinated water, floor finish, daily use pattern.
- Dimensions: clear openings, walkway allowance, storage door widths, accessibility needs.
- Finishes: RAL or physical sample for frame; slat versus teak-look tabletop; fabric code for cushions.
- Loungers: recline positions, base type, count per zone, side table or umbrella base pairing.
- Commercial: quantities by zone, phasing, shipping terms (Incoterms), delivery address and receiving conditions, installation responsibility.
What happens after you send it
Under our custom and OEM service, a complete brief moves straight into design confirmation and prototyping, with material and finish options fixed before production rather than during it. If your project needs the outdoor rooms designed alongside the interior — dining set, loungers, pergola, and the indoor cabinetry and flooring around them — our interior design services cover space planning, furniture layout and 3D renderings so the outdoor and interior schemes are specified together.
Send your site drawings, finish references and quantities to the outdoor furniture for villas and resorts team at SANTERSON, and we will return a specification with any conflicts flagged before you approve production.
Questions project teams ask us most often
Do we need to send CAD drawings?
No. A marked-up PDF plan, a site photograph with dimensions written on it, or a measured sketch is enough to start. What matters is that the numbers are real and the exposure description is honest.
Can we order the dining set now and the loungers later?
Yes, but tell us at the time of the first order. Holding the same frame colour, fabric and slat specification for a later tranche is a production decision, and it costs nothing to record early and considerably more to reconstruct afterwards.
Who decides the cushion fabric?
You do, but we will advise on weight and cover construction once we know whether cushions stay out overnight and how often they are handled. Send your preferred fabric code and let us confirm suitability for the use pattern.