A 7.5-metre swim spa is not a single line item you can drop into a bill of quantities the way you would a dining chair. It arrives as a shell, a pump room, an electrical load and a set of site conditions that have to be resolved before production starts. This guide walks through how we plan quantities and coordinate the surrounding product scope for Outdoor Swim Spa WS-PC07ST-L on villa, resort and residential development projects.
Start With the Model You Are Actually Specifying
The PC07ST family is built around a configurable acrylic shell with a swim training system, water jets, ozone sanitation and LED lighting. Within that family the length and cover options change the footprint, so it matters which variant goes into your drawings:
| Model | Catalog dimensions (mm) | Features shown on the product page |
|---|---|---|
| WS-PC07ST | 7000 x 2400 x 1470 | Water jets, LED lighting, Ozone, Swim training system |
| WS-PC07ST-L | 7490 x 2400 x 1470 | Water jets, LED lighting, Ozone, Swim training system |
| WS-PC07ST-S | 7000 x 2400 x 1470 | Same as above, plus an automatic cover option |
The "L" variant is the longer of the two standard shells at 7490 mm overall. That extra length looks minor on paper but it changes the slab outline, the position of the plant chamber and how much clearance you keep at the access end for servicing the filter pump. Decide the variant before your structural engineer pours, not after.
The captured specification sheet for this model lists one control system, one swim training system, one filter pump, six jets in total, four LED lights and a total power figure of 6.55 kW. Two things to note when you read that across: the water pump is not itemised separately for this model in the published list, and the jet count covers the whole unit rather than a single seating zone. Both points belong in your clarification log with the supplier before the order is placed.
How to Set the Quantity
For most projects the swim spa itself is a quantity of one per location, and that is where a lot of procurement teams stop. The quantity that actually needs planning is everything sitting around it.
1. Units per zone, not per site
On a resort or clubhouse scheme, count units by the pool deck or villa typology rather than by the whole development. A development with three repeating villa types may need one unit for the show villa and none for the standard type, or one for every unit if the swim spa is part of the sales pitch. Lock this down against the marketing schedule early, because reordering a single shell later means a second production slot and a second container.
2. Options and accessories are separate line items
Catalog options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each of these needs its own quantity, its own lead time and its own approval from whoever owns the mechanical scope. Heat pump and insulation in particular should be decided together with the local climate and the intended year-round use, because they affect both the electrical load and the plant space.
3. Spares and consumables
For a single private villa, spare filters can be bought locally once the system is understood. For a hotel or club with several units, list filter media, jet fittings and any replaceable lighting as a spares package in the same purchase order. It costs little at production stage and saves an emergency air freight later.
Coordinating the Surrounding Product Scope
The swim spa is the anchor, but the deck around it is where projects get delayed. In our turnkey work we coordinate these trades against one drawing set:
- Poolside seating and lounging. Aluminium frames, rope weave, wicker and teak-look tops all sit comfortably beside a swim spa and hold up to splashing water. Our Aluminium Sling Sun Lounger Collection is specified next to these units because the frames are light enough to move for cleaning and the backrests adjust.
- Shade structures. A long, narrow swim spa catches low sun along its length. Our Motorized Louvered Aluminum Pergola with LED Strip and Zip Screens can be set over part of the deck, but the beam line has to clear the water surface and the cover travel path if a cover is specified.
- Paving, decking and coping. Slips resistance, the fall away from the shell and the joint detail at the perimeter are agreed with the flooring supplier before the shell is crated.
- Outdoor lighting. The spa carries four internal LED lights; deck-level wall sconces and step lighting are a separate circuit and should be scheduled together so one electrician runs both.
- Changing and storage. A changing room, towel store or outdoor cabinet near the swim spa keeps the deck usable. This is where our Santerson Outdoor Ready PVC Cabinets are used on poolside and terrace applications.
Sequencing the Order
The order of work matters more than people expect. A practical sequence that has served us well on villa and hospitality projects:
- Brief and layout. Confirm the variant, the options list and the room for plant access. Our interior design team can produce layouts and 3D renderings at this stage so the client signs off a picture rather than a dimension string.
- Detail confirmation. Issue the specification sheet back to us with the option selections marked, and share your engineer's support and electrical drawings. This is where the missing water pump line and the jet layout get resolved.
- Production. Shell, options and any matching poolside furniture are produced under one project file so they ship as a coordinated set.
- Logistics. We handle freight forwarding by sea, air and rail with customs paperwork and container loading plans. The shell and its accessories can travel together or split depending on site storage.
- Install and handover. Setting the shell, connecting plant, commissioning the swim training system and ozone, then a snag walk with the client.
For background on how the whole package is managed end to end, see our one-stop solution and service pages.
A Short Checklist Before You Send the Enquiry
- Variant confirmed against the site drawing: WS-PC07ST, WS-PC07ST-L or WS-PC07ST-S.
- Quantity stated per villa type or per pool deck, not just per project.
- Options priced and approved: heat pump, insulation, UV sterilisation, sand filtration, steps, cover.
- Electrical load reviewed against the published figure for the selected configuration.
- Poolside furniture, shade and lighting drawn to the same setting-out plan.
- Access route for delivery and lowering the shell checked on site.
Send us your swim spa layout
Tell us the model, the quantity per location and the surrounding deck scope, and we will return a coordinated specification with options priced and a production plan. As a China-based furniture and building materials manufacturer, we supply swim spas alongside outdoor furniture, interior fixtures and finishes for villa and hospitality projects.