A glass partition looks simple on a drawing: two panels of glass, a frame, a set of tracks. On site it is one of the most coordination-sensitive items in a bathroom or interior fit-out, because the glass has to arrive at the right size, with the right safety specification, and it has to work with waterproofing, tiles, cabinetry, hardware and lighting that other trades are installing around it. Most problems we see on projects do not come from the glass itself; they come from options that were never agreed before production started.
This guide sets out what a buyer or project manager should actually put in front of the supplier, and in what order, so that the quotation you approve is the partition your site can install.
Start with the job the partition has to do
Before any finish discussion, agree the function. A partition between a shower area and a vanity zone is a wet-zone screen; a panel that closes off a bedroom corner or a study alcove is a space divider; a set of panels in front of a wardrobe run is closer to joinery than to glazing. Each of these drives different decisions about thickness, hardware, edge detail and how much privacy the glass has to give.
Our Glass Partitions in the Custom Partitions & Paneling collection are made to measure for each project, with the layout, dimensions and finish specified against the space rather than chosen from a fixed size list. The same approach applies across our Glass Sliding Panels for wall systems, where track type and opening dimensions are confirmed per project.
The eight options to settle before you order
Treat this as an agenda for your supplier conversation. If all eight are closed out in writing, the quotation is comparable between suppliers and the production drawing has something firm to work from.
| Option | What to decide | Why it matters on site |
|---|---|---|
| Dimensions and opening | Finished floor levels, finished wall faces, clear opening width and height, head and sill details. | Glass is cut once. Measuring off structural rather than finished dimensions is the most common source of rework. |
| Glass type and safety specification | Toughened or laminated, panel thickness, and where impact or breakage resistance needs to be specified. | Safety requirements are set by the position of the partition and the use of the room. Confirm them with your designer or certifier for each project; do not assume a default. |
| Glass appearance | Clear, low-iron, frosted, smoked, ribbed or reeded. | Appearance controls privacy and how much daylight passes through. Frosted, smoked and ribbed glass obscure differently, so check a physical sample against the room. |
| Frame and edge detail | Frameless, or framed in aluminium or steel; frame colour and profile width; polished or seamed edges. | A slim black frame reads differently from a minimal aluminium one, and the frame profile determines how the panel meets tile, plaster and floor finishes. |
| Opening mechanism | Fixed panel, hinged, sliding, pocket or folding. | Sliding and pocket systems need a track zone, a wall cavity or an exposed rail. That decision changes the wall build-up, so it has to precede the framing stage. |
| Hardware | Handles, hinges, wheels, tracks, locks, brackets and their finish. | Hardware carries the moving parts. Specify load capacity and finish together, and keep the same metal finish across door ironmongery for consistency. |
| Wet-zone interfaces | Waterproofing membrane upstands, tile set-out at the base channel, drainage falls, silicone joint locations. | The partition base must be fixed into a waterproofed detail. Where tiling and glazing are supplied by different parties, this junction is where responsibility gets unclear. |
| Services coordination | Shower valve and spout positions, shower systems, niche locations, mirror and lighting circuits. | Glass panels crossing a wall with concealed services force last-minute on-site cutting, which is not possible with toughened glass. |
Fixed, sliding or folding: the decision that changes the wall build-up
Buyers often leave this choice late because it looks like an aesthetic one. It is mostly a spatial and structural one.
- Fixed panels are the least demanding mechanically, but they set a permanent line in the room and every later change means new glass.
- Sliding systems save swing clearance, which is why they suit bathrooms and closets where a hinged leaf would hit a basin or wardrobe. A pocket system needs a cavity to receive the panel; an exposed-rail system does not, but the rail becomes a visible design element. Our Partition Sliding Systems are configured per project, with track, hardware and opening dimensions confirmed before manufacture.
- Folding systems open a wide span almost completely, at the cost of more hinges and a stack of panels when open. Our made-to-measure Glass Folding Doors are specified with layout and dimensions tailored to the opening.
- Hinged glass leaves need clear swing space and hinges rated for the panel weight, and they must not conflict with anything on the floor on either side.
Where acoustic separation matters more than light, compare glass against Acoustic Sliding Panels, and where the requirement is a solid divider with a decorative pattern rather than transparency, a laser-cut metal screen such as our decorative partition screen for hotel reception areas does a different job again. Deciding this early avoids two trades both being told to build the same wall.
Finish and appearance: how far to push customisation
Glass partitions rarely sit alone. They sit next to wardrobes, vanities, wall panelling and doors, and the metals and tones have to agree across all of them. Practical points worth settling:
- Match frame and handle finishes to the ironmongery schedule, not to a showroom sample photographed under different light.
- Where glass also appears in sliding door wardrobes or display cabinetry, specify one glass tone across both so the smoked or bronze tint does not read as a mismatch.
- Panelling that meets a glass edge should be specified together with it. Our Wall Panel Systems and Wood Panel Partitions are made to measure, so the junction detail can be drawn rather than resolved on site with trim.
- Ask for a sample board of glass, frame profile and hardware before sign-off. Photographs shift colour; a physical board does not.
Under our Custom & OEM service, dimensions, material and finish are specified per project rather than selected from a standard range, which is what makes these junction details possible. For a villa or hotel package we supply partitions alongside the cabinetry, ceramics, lighting and joinery they have to sit against, so one production coordination covers all of them.
Documentation to request from the supplier
A quotation with a price and a lead time is not enough to approve. Ask for:
- A production drawing showing dimensions, glass thickness, frame profile, hardware positions and the base detail.
- A written specification of glass type, thickness and edge treatment for every panel on the schedule.
- The track, hinge and wheel schedule with load ratings and finish codes.
- Site preparation notes: what the floor, wall and ceiling must be finished to before installation, and who owns each interface.
- Packaging and handling notes for transport, especially where panels are large enough to need a lift or a crane on site.
For international projects this documentation also feeds the shipping and customs paperwork. Our logistics service covers freight forwarding by sea, air and rail, packaging and container loading, and door-to-door delivery, with commercial invoices and packing lists prepared for the shipment. Glass needs crating specified at the design stage, not improvised at the factory gate.
A short procurement sequence that works
- Brief and layout. Confirm which partitions are fixed, sliding or folding, and mark the wet zones.
- Specification. Fix glass type, thickness, appearance, frame profile and hardware on a sample board.
- Site measurement. Take dimensions off finished levels, with the tiling and floor build-up already defined.
- Production drawing approval. One signed drawing per opening; treat this as the point of no return for glass.
- Manufacture and inspection before packing, with a panel schedule matched to each opening.
- Delivery and installation, with site preparation confirmed in advance and snags recorded at handover.
As part of our turnkey project solutions, those stages are coordinated under one scope for villas, hospitality and office projects, so partitions, joinery and fixtures reach site in the sequence the installation needs.
Before you sign a glass partition quotation
Confirm four things in writing: the safety specification for each panel position, the finished-level dimensions the glass was measured to, who owns the waterproofing and tile junction at the base, and the track or hinge load rating for any moving leaf. If any of those are missing, the price is not comparable and the drawing is not ready for production.
Questions buyers ask us
Can you supply glass partitions together with wardrobes and vanities on one order?
Yes. Partitions sit in the same Custom Partitions & Paneling and built-in furniture scope as our wardrobes, vanities and panelling, so frames, glass tones and hardware finishes are coordinated across one production run and shipped together.
When should partition dimensions be taken?
After the floor build-up, waterproofing and wall finishes are defined, so that the dimensions refer to finished surfaces. Where a programme requires earlier ordering, we produce against the design intent drawings and then confirm the site dimensions before cutting.
Do you confirm safety glass requirements for my project?
We manufacture to the specification your designer or certifier sets. Tell us the position and use of every partition, and we will confirm the construction needed; requirements vary by location and project type, so they should be verified with the local authority having jurisdiction.
What if an opening turns out different on site?
Toughened glass cannot be recut. This is why we hold a production drawing approval step and reconfirm dimensions before manufacture. Where a deviation is found early, the panel is remade to the corrected size rather than adjusted on site.
Talk to us about your partition package
Send us your drawings, a marked-up layout or a reference photo. We will quote made-to-measure glass partitions with the frame profile, hardware and finish you have specified, coordinated with the rest of the fit-out scope.