A whole-house joinery package in one style, made by one factory and delivered to your door, is the easiest way to get a warm mid-century interior that actually hangs together. It is also the easiest place for expensive mistakes to hide. The difference between a smooth project and an expensive rework almost always comes down to the brief you hand the manufacturer at the start. This guide sets out exactly what to send, room by room, so your quotation is accurate and the finished cabinetry matches the drawings you approved.

What "whole house custom" actually covers

Whole-house customisation means one manufacturer produces the built-in cabinetry across every room against a single set of dimensions, finishes and details. Instead of buying a wardrobe from one supplier, a sideboard from another and a kitchen from a third, you specify entrance storage, living room storage, bedroom wardrobes, bay window seating and desks, staircase shelving and kitchen cabinets as one coordinated package.

Our Mid-century Whole House Custom Cabinetry & Built-in Storage Project shows what that looks like in practice: an integrated bay window desk with multi-layer drawers under the window, white open bookshelves beside the staircase, a vertical slat partition that divides the space without blocking daylight, and wood-grain kitchen cabinets built around deep metal drawers. A companion case, our Custom Mid-century Modern Whole House Custom Furniture Project, adds an entrance cabinet with open display niches and travertine decorative blocks, a floating living room sideboard with a travertine countertop for a wine set and coffee machine, an integrated bay window cabinet and bed platform, and a barn door for the bathroom.

Both cases use the same language: warm wood tones, cream wall paint, arched openings, soft ambient light and pull-free handles. That consistency is the point of the service, and it only works if the manufacturer sees the whole picture at once rather than one room at a time.

The six items your brief must contain

Send these before you ask for a price. A quotation built on partial information is the number that changes later.

ItemWhat to includeWhy it matters
Room listEvery space with built-in work: entrance, living room, dining, kitchen, bedrooms, study, stairwell, laundry, bathrooms.Missing rooms appear later as variations, or worse, as gaps between trades on site.
Drawing setFloor plans and elevations with dimensions, ceiling heights, skirting, arches and window reveals.Built-ins are measured to the millimetre; a plan without heights cannot be priced properly.
Style referenceMood board or product photos showing the tone you want, plus what you do not want."Mid-century" means different things to different factories. Reference images close the gap.
Material and finish schedulePanel material, wood species or grain, colour code, surface sheen, countertop material, glass type where used.Finish is quoted by specification, not by adjective. Match it to your flooring and wall paint at the same time.
Storage layoutWhat each unit must hold: books, tableware, appliances, hanging clothes, luggage, cleaning supplies.Internal fittings are chosen by use. A shelf-focused layout and a drawer-focused layout cost differently.
Appliance and fixture scheduleModel numbers and dimensions for ovens, refrigerators, wine coolers, coffee machines, televisions.Integrated tall cabinets and niches are built around real equipment sizes, not averages.

Room by room: the details worth writing down

Entrance. State whether you want closed storage, open display niches or both, and where shoes, keys and bags each go. Note the depth available in the hallway, because a shallow entrance cabinet changes what hanging space is possible.

Living room. Decide early between a media wall and a low sideboard. A full-height solution such as our Santerson Full Height Storage Walls is made to measure with configurable material and finish options, so tell us the wall width, ceiling height and how much of it you want open versus closed. If the unit must carry a television, soundbar or console, give the dimensions and say where cables should be hidden.

Kitchen. Confirm the worktop material and thickness, whether you want visible handles or a handleless front, and which appliances are integrated. Our Handleless Minimalist Kitchen Cabinets remove protruding handles for continuous surfaces and use soft-close hardware on drawers and doors; base units, wall units and tall pantry cabinets are made to your layout. If you prefer a warmer look, wood-grain fronts with deep metal drawers keep the same clean line.

Bedrooms. Send hanging heights for long garments, whether you need a bed platform or headboard integrated into the joinery, and how the bay window should be used — as seating, as a desk, or as drawer storage beneath.

Stairwell and transitions. This is where whole-house work earns its keep. Open shelving that follows the stair line, slat partitions, decorative tile on staircase risers and doors that match the cabinetry all need to be drawn together, not added room by room.

Questions to ask before you confirm the order

  • Who measures on site, and when — before or after plastering and flooring?
  • Do the 3D renderings show every unit in the package, including interiors of drawers and shelving?
  • Which materials are stocked at the quoted finish, and which need a special run?
  • How are cabinet modules split for transport, and what is the container plan for your site?
  • Who installs, and what happens to panels damaged in transit or on site?

At SANTERSON these stages follow a fixed sequence: consultation, design and planning, production, logistics, installation and after-sales. We support the joinery package with space measurement, 3D design, production, delivery and on-site installation, and cabinet size, material, colour and internal function are all customised to your layout. Confirm scope, schedule and commercial terms for your own project in writing at the detail-confirmation stage.

A practical test: if a manufacturer can quote you from a floor plan alone, without asking about appliances, storage use or finish codes, the quotation is a guess and not a specification.

Common rework causes, and how the brief prevents them

The most frequent problems are not manufacturing faults. They are dimensions taken before the floor level was fixed, appliance sizes that changed after the order, finishes approved from a screen rather than a physical sample, and rooms left out of the original scope. Each one is settled by one line in your brief: state the measurement date, freeze the appliance schedule, request finish samples before sign-off, and list every room.

Send your drawings, room list and finish preferences and we will come back with a specification you can compare against any other quotation.

Start your whole-house cabinetry brief

Share your plans and reference images for a project consultation and a written specification. SANTERSON has been manufacturing furniture and building materials since 2008, with custom and OEM service, door-to-door logistics and installation support.

Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com. Enquiries are answered within 24 hours, Monday to Saturday, 8:00 AM to 6:00 PM GMT+8.