Integrated lighting is one of the smallest line items in a joinery package and one of the easiest to get wrong. The fitting disappears into the carcass, so nobody sees the wiring, the driver or the mounting detail until the site team starts cutting. When we quote Santerson Integrated Cabinet Lighting for a villa or hotel fit-out, the questions our production team asks first are almost never about the lamp itself. They are about what the light has to live inside, and who is going to switch it. This article sets out the project details that actually change the specification, so you can send them with your enquiry instead of answering them during fabrication.
1. Which furniture line the lighting sits in
The same profile of light reads very differently on a bathroom vanity than on a kitchen glass display, and it is built differently too. Our Lighting & Accessories collection covers integrated cabinet lighting for project cabinetry where finish, layout and dimensions are set per project. For open storage the equivalent is Santerson Integrated Lighting Systems, supplied as part of our modular shelving systems rather than inside a door and carcass build.
Tell us which line you are buying against. A shelf system with lighting is coordinated around exposed shelves, back panels and cable routes that stay visible. A cabinet with lighting is coordinated around a sealed carcass, a concealed driver and a switch you have to reach. Those two scopes produce different drawings, and mixing them in one enquiry is the most common cause of a re-quote.
2. The room environment the fitting has to survive
A strip above a bed headboard and a strip inside a mirrored bathroom cabinet face different conditions, so they are not interchangeable. For wet and humid rooms we need to know whether the fitting sits inside the splash zone or outside it, whether the door traps steam when closed, and whether condensation forms on the mirror backing. That determines the sealing detail, the position of the driver and how the fitting is fixed to the panel.
For kitchens the concern is heat and grease rather than steam. A strip mounted under an upper cabinet near a hob collects cooking residue, and one recessed into a tall housing above an integrated oven sits in rising warm air. Send us the appliance layout with your cabinet elevations and we will keep light sources away from heat and clean-off surfaces.
3. The cabinet construction you are building it into
Integrated lighting is a joinery detail before it is an electrical one, so the carcass specification drives what we can deliver:
- Panel material and thickness. Veneer, lacquer, acrylic, melamine, solid wood and glass-fronted aluminium frame doors each take a recess or channel differently, and a thin front panel limits how deep a profile can sit in.
- Surface finish. High gloss and dark matte finishes behave differently around a light line: one shows every mounting mark, the other absorbs the glow. We choose the reveal accordingly.
- Glass display cabinets. Warm LED lighting inside glass cabinets is a display decision as much as a task one, so the shelf heights, glass type and what you intend to show all affect where the source runs.
- Countertop and backsplash interface. Under-cabinet strips have to clear the worktop edge, splashback and any upstand. That dimension needs to be on the drawing before we cut.
4. The switching and control plan
This is the item most often left out of a joinery enquiry, and it is the one that costs the most to change later. Decide early how each run is meant to come on:
| Control intention | What we need from you |
|---|---|
| Door-operated, light comes on when the door opens | Hinge side and door type, so the sensor and its cable route can be placed |
| Hand switch on the cabinet face or adjacent wall | Switch position on elevation, and whether it shares a plate with power |
| PIR or proximity activation for wardrobes and vanities | Mounting height and approach direction, to avoid false triggering |
| Linked to the room lighting circuit or a building control system | The circuit schedule or control drawing from your electrical contractor |
| Mood scenes with dimming | Dimming method required and which other fixtures share the scene |
Where a project has a lighting consultant's circuit schedule, send it. Where there is none, tell us and we will propose a simple scheme for your electrical contractor to confirm before production.
5. What the light is being asked to do
Task, display and ambient lighting need different output and aiming, even in the same cabinet. A worktop strip under a kitchen upper has to light a working surface without throwing glare off a dark splashback. A glass display cabinet lit from within is showcasing contents, so the source runs where it hides from direct view. A bedroom or bathroom accent only needs enough output to read the material.
Colour temperature should be set against the whole room, not per cabinet. Our custom kitchen cabinetry pairs warm LED lighting inside glass display cabinets with a separate strip at the worktop, and that pairing works because both sources were specified together rather than added at different stages. Send us the finish samples you have chosen and we will match the light to them instead of defaulting to one temperature across the job.
6. Power, driver location and access
Every run needs a driver somewhere, and on a project that decision belongs to the coordination stage. Tell us:
- Where power is being brought to each cabinet, and from which side of the wall
- Whether the driver must be reachable after installation, and through which access panel or removable shelf
- The supply voltage available at site for your region, and any local electrical requirements your contractor is designing to
- Runs that cross a join between two cabinet units, where the cable has to pass from one carcass to the next
Electrical ratings and compatibility are confirmed per configuration for each project, so we treat them as part of the detail rather than as a fixed catalogue line. Your electrical contractor signs off the final connection.
7. How much of the joinery package is placed with one supplier
Cabinet lighting goes wrong when the cabinetry, the lighting and the electrical works are tendered separately and nobody owns the interface. Coordinating them inside one production run means the channel, the driver pocket and the cable route are machined at the factory instead of cut on site.
As a one-stop furniture and building materials supplier, we produce cabinetry, joinery, wall and ceiling finishes, ceramics, flooring and lighting accessories for the same project, which is why integrated lighting is normally quoted as part of the cabinet build rather than bolted on afterwards. Our Custom & OEM Service covers bespoke dimensions, finishes and detailing from your drawings, so a lighting detail can be resolved in the same coordination round as the carcass.
For a whole fit-out, that single point of contact also carries through to logistics and door-to-door delivery and to installation and after-sales support, so the same team that machined the lighting channel is the team answering when a driver needs replacing.
A short brief to send with your enquiry
The following is enough for us to price accurately and start detailing:
- Cabinet elevations with overall dimensions, panel material and finish
- Room list noting wet zones, appliances and heat sources
- Switching and control intention per run
- Power position, supply voltage for your region and required driver access
- The task each run performs: worktop, display or accent
- Installation location, delivery destination and target programme dates
Send those six items and the lighting detail is settled before production starts. Send fewer, and the question comes back to site.
SANTERSON — China-based manufacturer of furniture, interior fixtures and building materials, supplying villa, hospitality and office projects since 2008.
Tell us the room, the cabinet construction and how you want the light switched, and we will detail the integrated lighting into the joinery before it is made. Contact PHILLIP at santerson@qq.com, or send your drawings through our contact page.