A U shaped corner wardrobe usually sits at the junction of three walls in a dressing room, bedroom alcove or villa master suite. It is one of the few fitted storage items where the drawing, the manufacturing tolerance and the site condition all have to agree before the first panel leaves the factory. That is why the question is rarely "can you make it" but "can you deliver it, correctly, alongside everything else in the project". The checklist below shows what a serious buyer should verify before placing a built-in wardrobe order with an overseas manufacturer.

1. Does the supplier build to your dimensions, or only to a fixed module?

Ask directly whether the unit is made-to-measure or assembled from standard carcass sizes. A genuinely custom U shaped corner wardrobe is drawn around the actual room: the return legs, the depth change at the corner, the skirting, the cornice line and the position of switches and sockets are all resolved in the shop drawing. A modular system will force your floor plan to adapt instead.

Useful questions to put in writing:

  • Which dimensions do you need from us, and which do you measure yourself on site?
  • How are out-of-square walls and uneven floors handled in the drawing and on installation?
  • What tolerance do you allow for the wall returns, and who confirms it before production starts?

2. Can they show you the corner detail, not just a hero photograph?

The corner is where cheap work fails. Request the construction detail for the return joint, the top panel connection and the scribe to wall. A supplier working from real production drawings will share them; a reseller trading pictures cannot.

Compare layout options in the same collection before you commit. L shaped corner wardrobes suit a two-wall recess and leave one wall free for circulation, while a U shape wraps three sides and turns the alcove into a compact dressing area. A supplier who understands both will tell you when the U shape is the wrong answer, because the centre bay becomes hard to reach or the door swing collides with the bed.

3. Is the door and opening system matched to the space?

Depth of circulation decides the door type. In a tight bedroom, sliding door corner wardrobes keep the front clear; where the alcove is deep enough, hinged door corner wardrobes give full visual access to everything at once. Ask what hardware the supplier fits, whether soft close is standard or optional, and how replacement parts are supplied later. Also ask what they recommend for the awkward return leg: pull-out rails, angled shelving, or an open corner wardrobe section for bags and daily items.

4. Are the materials and finishes specified, or just named?

"Wood finish" is not a specification. Ask for the substrate, the surface material and the edge treatment in writing, then confirm the finish sample against your joinery package. Suppliers with a walnut veneer wardrobe range or a lacquer range should be able to match sheen and grain direction to the rest of the fitted furniture in the same property, which matters when wardrobes, vanities and wall panelling are ordered together.

  • Substrate and thickness for carcass, doors and shelves
  • Surface material: veneer, lacquer, melamine, acrylic or glass
  • Edge banding or solid lipping on visible edges
  • Back panel fixing method, which tells you a lot about rigidity

5. Who does the shop drawing, and how many revisions are included?

For built-in furniture the drawing is the contract. A manufacturer offering design and production coordination should produce a set showing elevation, internal configuration, door division, lighting provision and clearances, then hold production until you sign it off. At SANTERSON this sits inside the interior design service: space layout planning, concept design, 3D renderings and project design coordination covering drawings, production coordination and on-site guidance.

6. Can they coordinate the wardrobe with the rest of the fit-out?

Wardrobes rarely fail alone; they clash with flooring, skirting, lighting and door openings. Ordering storage together with interior fixtures and finishes from one supplier means one drawing set, one production schedule and one delivery window instead of four vendors arguing about who is at fault.

Coordination pointWhat to confirm before ordering
FlooringWhich floor level the wardrobe sits on, and whether it is installed before or after the flooring goes in
LightingInternal lighting provision, driver location, switching point and cable routes
Doors and openingsClearance for the door swing or sliding track, including architraves
ElectricalPosition of sockets and switches relative to the carcass drawing

7. How does the order travel, and who unpacks it?

Built-in furniture is heavy, panel-based and easily damaged at the corners. Ask how panels are packed and protected, how the consignment is consolidated with your other goods, and what documentation is provided for import clearance. SANTERSON handles freight forwarding by sea, air and rail together with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, which reduces the number of handover points between factory and site.

Ask for this in writing

Packing standard per panel type, container loading plan, named logistics contact, and the exact point where responsibility transfers to you. Terms, duties and transit time should be confirmed for your specific destination rather than taken from marketing copy.

8. What happens when it arrives on site?

Ask who installs, whether instructions are supplied for a local contractor or the supplier's own team attends, and how snags are recorded and closed out. Then confirm what is covered after handover, including spare parts such as hinges, handles and tracks, since these are the items a project manager will need two years later. SANTERSON lists on-site installation, inspection and snagging, warranty coverage, spare parts and ongoing maintenance as part of after-sales support.

A short pre-order checklist

  • Signed shop drawing with internal configuration and clearances
  • Written material and finish specification, matched to a physical sample
  • Door system chosen against real circulation depth, not preference alone
  • Corner and scribe detail confirmed, not left to the installer
  • Delivery terms, packing standard and documentation confirmed for your destination
  • Installation responsibility and snag process agreed before dispatch

Send us your drawings

If you are specifying fitted storage for a villa, apartment or hospitality project, share the floor plan and the finish schedule. We will review the corner condition with you, prepare shop drawings for approval, and coordinate the wardrobes with the rest of the fitted furniture and finishes under one production and delivery plan.

Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the contact page to start an enquiry.