Grey is the door colour most buyers land on when they want a kitchen that reads calm, modern and easy to live with. It also happens to be one of the easiest finishes to order badly. Two cabinets can carry the same words on a quotation and arrive as completely different rooms: one soft and even, the other patchy, shiny in patches and showing every fingerprint. The difference is almost never luck. It is the quality of the questions asked before the drawing was signed.

If you are specifying grey matte cabinets for a villa renovation, an apartment set or a hospitality fit-out, the following questions are the ones worth putting to any supplier, including ours. Answer them in writing and you will compare quotations on the same basis rather than on price alone.

1. Which grey, exactly?

"Grey" is not a specification. Light warm greys, cool mid-greys, charcoal and graphite all behave differently next to worktop stone, flooring and daylight from a particular window orientation. Ask the supplier which named colour or reference they are producing, then ask for a physical sample of the actual door panel rather than a printed card.

  • Request a sample large enough to judge texture, not just hue — a full door corner or offcut.
  • View the sample in the room where the cabinets will be installed, at morning and evening light.
  • Check the sample against your worktop, splashback and flooring samples side by side before signing off.

2. What is the door substrate and the surface material?

A flat grey matte door can be built on very different cores and finished with very different surfaces — melamine, lacquer, acrylic or a wood-veneer build with a matte top coat. Those choices drive price, edge quality and how the door stands up to steam near a sink or hob. Ask the supplier to state the substrate and surface material for every door in the quotation, not just the collection name.

Where the same grey needs to continue into bedrooms or laundry joinery, ask whether matching wardrobe fronts are available in the identical surface. Our matte finish melamine wardrobes are made to the project's dimensions and layout, so a single grey can run from the kitchen into the rest of the house instead of being reinterpreted room by room.

3. How are edges and panel construction handled?

On matte doors the edge banding is where quality shows first. Ask what edge treatment is used, whether the edges are matched to the face colour, and how inside corners and cut-outs for handles or integrated appliances will be finished. If you want a clean handle-free front, confirm the mechanism — routed pull profiles, recessed channel pulls or push-open hardware — because that decision changes both cost and the drawing.

Our handleless matte cabinets sit in the same matte-finish kitchen cabinet family as the grey option, with dimensions, layout and finish specified per project.

4. Are the carcasses matched to the doors?

Cabinet boxes are often quoted generically while the visible doors carry all the attention. Ask what board the carcase is made from, what thickness it is, how the back panel is fixed and whether the interior finish matches the exterior in open shelving. Then ask what is included in the price and what is an extra: plinths, scribes, filler panels, trims and any site-built returns.

5. Who designed the internal layout?

A grey matte kitchen looks identical from across the room whether the inside is well planned or not. Ask to see the internal layout for each unit: drawer versus shelf, where tall storage sits relative to the hob and oven, how bins, small appliances and laundry are housed, and what happens at awkward corners. A supplier who produces a considered internal plan alongside the elevations is doing specification work; one who sends boxes with doors on them is selling units.

A useful test: send your floor plan and ask for an elevation drawing plus an internal layout for every unit. The speed and detail of what comes back tells you more than any brochure.

6. What are the exact dimensions, and who measured them?

Matte cabinets are usually made to measure, which means a wrong number becomes a site problem rather than a returned box. Confirm whether sizes come from your drawings or from a site survey, and how tolerances are handled for uneven floors, out-of-plumb walls and ceilings that vary along their length. Ask when the final measured dimensions will be taken in your programme — after plaster and screed, not before.

7. What does the quotation include?

Before comparing two prices, put both on the same line items. Work top and splashback, sink and tap, appliances, hobs, extractors, lighting inside cabinets, plinths, fillers, delivery to door, offloading and installation each need a clear yes or no.

Line itemAsk before you compare prices
CabinetryDoors, carcases, drawers, hinges, runners, plinths, fillers and trims
Stone and surfacesWorktop, edge profile, upstands, cut-outs for sink and hob
AppliancesSupply only, or supply plus install and connection
ElectricalCabinet lighting, transformer positions, isolators, first fix responsibility
Site worksPlumbing, plaster, floor preparation and making good after installation

8. How is the finish maintained, and what does it show?

Matte surfaces feel soft but they behave differently from gloss under daily use: some show finger marks and shine along high-use drawer fronts, others wipe clean without marking. Ask the supplier which surface you are buying and how it should be cleaned — the wrong cleaner can leave a permanent patch on a matte front. Then ask what is covered if a panel is damaged in transit or on site, and how a replacement panel is colour matched later.

9. What is the delivery route and who installs it?

For an overseas order this is where projects are lost. Ask how the cabinets are packed and loaded, which port or site they arrive at, who clears customs, who offloads, and who stores them safely while other trades finish. Then confirm whether installation is done by the supplier's own team, a local contractor you appoint, or a supervised hybrid — and who is responsible for snags in each case.

SANTERSON handles custom/OEM production with design coordination, freight and door-to-door delivery, then installation support and after-sales service, so one party stays accountable from drawing to handover rather than the cabinets being dropped at a kerb and left there.

10. What comes back if something is wrong?

  • What is covered, for how long, and what is excluded — write it into the order confirmation.
  • How quickly are replacement doors, panels or hardware produced and shipped?
  • Who pays freight on a replacement, and who fits it on site?
  • Is there a named contact who answers during your working hours?

A short pre-order checklist

  • Named grey reference and physical door sample approved in the room.
  • Substrate, surface material and edge treatment stated per line on the quotation.
  • Handle mechanism confirmed and shown on the drawing.
  • Carcase specification, plus a list of what is included and excluded.
  • Internal layout for every unit, not just elevations.
  • Final measured dimensions taken after wet trades are complete.
  • Delivery route, offloading, storage and installer named in writing.
  • Warranty scope, replacement terms and a named contact recorded.

Ask these ten questions of two or three suppliers and the cheapest quotation will stop looking like the obvious one. What you are buying is not a colour — it is a set of drawings, a surface that survives a decade of cooking, and someone who answers when a panel arrives cracked.

Send us your floor plan and the grey you are considering. We will return elevations, internal layouts and an itemised quotation for made-to-measure grey matte kitchen cabinets, with matching joinery for the rest of the project where required. Enquiries reach our team at santerson.com/contact.

Specifications, finishes and service scope are confirmed per project before production.