Glass-front dining cabinets and sideboards do not come off a shelf in the sizes a real dining room needs. Wall lengths vary, appliance niches sit in different places, and a display cabinet that shares a wall with kitchen joinery has to match its door profile and finish exactly. That is why Santerson Glass Front Dining Cabinets are made to measure rather than sold as fixed modules, and why the quality of your enquiry decides how accurate the quotation is. The notes below set out what a buyer, builder or designer should send us, in what order, and what comes back.
Start with the job type, not the cabinet
The same glass-front cabinet is specified differently for a single villa dining room, an apartment handover where twelve identical units are needed, or a hotel function room that has to survive daily service. Before we price anything, tell us which of these you are buying for, and roughly how many pieces. As a furniture and building materials manufacturer working on villas, hospitality and office projects, we quote cabinetry against the project, not as a catalogue item, so quantity and site conditions shape both the build detail and the freight plan.
If the cabinet has to sit alongside kitchen cabinets, wardrobes or wall panelling from the same supplier, say so at this stage. Panels, door edges and veneer tones are matched in the factory; matching them after delivery is where projects get expensive.
What to send in your enquiry
Send what you already have. We can work from a sketch. But the closer the first file is to this list, the fewer rounds of questions it takes:
- A dimensioned layout of the wall or alcove: overall length, height and depth, plus ceiling level if the unit runs floor to ceiling.
- The room drawings or a marked-up floor plan showing door swings, skirting, radiators, switches and any socket that has to stay reachable behind or beside the cabinet.
- How the cabinet will be used: glassware and display pieces, table linen, bottle storage, or a mix. This sets the shelf spacing and whether you need adjustable shelving, drawers below, or a plinth.
- Framed or frameless glass front, and the glass itself — clear, frosted, ribbed or smoked — since each changes the hardware and the price differently.
- Finish direction: paint colour or RAL reference, lacquer or veneer, wood species and tone. A photo of the kitchen cabinet you want to match is often faster than a written description.
- Lighting: whether shelf or inside-cabinet lighting is wanted, and where the power feed and switch will be.
- Whether this is one-off replacement furniture for one room, or repeat units across several rooms or several dwellings.
For villa and apartment work with more than one unit, include a schedule of quantities if you have one. It lets us group identical carcasses and price them as a set.
Decisions we need from you before pricing
Cabinetry of this kind is configured, not selected. These are the choices that move the quotation most, and it is better to settle them before the request than after:
| Decision | Options to consider | Why it affects price |
|---|---|---|
| Size and fit | Made-to-measure to the wall, or standard modules fitted into a run | Scribe panels, cut-outs for skirting and cornices, and floor-to-ceiling heights are built, not adjusted on site |
| Glass type | Clear, frosted, ribbed, smoked; framed or frameless | Glass weight drives hinge choice and the strength of the door carcass |
| Door operation | Hinged, sliding, or bi-fold on a wide opening | Sliding and bi-fold fittings cost more and need accurate clearance |
| Interior layout | Fixed shelves, adjustable pins, drawers, cutlery trays, wine storage | Each mechanism is specified separately; drawers are the usual place to add budget |
| Finish | Painted, lacquered, melamine, wood veneer | Hand-applied finishes and veneer matching take longer than foil or board finishes |
| Integrated lighting | Shelf lights, vertical strip in an reveal, sensor or switch | Requires pre-drilling, wiring route and a driver location agreed at drawing stage |
| Order size | Single piece or repeat units across a project | Tooling and set-up are shared across a batch; minimum order quantities vary by product line |
Our Custom & OEM Service covers bespoke finishes and textures, material choices such as wood, metals, engineered stone and laminates, plus private labelling where a developer or retailer wants the units supplied under their own brand. Confirm current minimum order quantities and available options for your project when you write to us.
What happens after you send it
The steps are the ones described on our service pages, applied to a single cabinetry enquiry:
- Review and questions. We read the drawings and come back with anything missing — usually exact heights, glass choice and the finish reference.
- Design proposal. For projects that need it, our interior design service provides space layout planning and 3D visual renderings, so the elevation is agreed before metal, board and glass are cut.
- Quotation and detail confirmation. You receive a priced specification listing carcass, doors, glass, hardware, finish and lighting as separate lines, so you can move budget between them instead of accepting or rejecting one lump figure.
- Production. Once drawings are signed off, the units enter manufacturing with quality control at each stage.
- Logistics. Freight by sea, air or rail with customs paperwork and door-to-door delivery arranged for the destination.
- Installation and after-sales. On-site installation where required, snag inspection, spare parts and maintenance support afterwards.
Buying it as part of a wider fit-out
Dining cabinets rarely stand alone. In villa and hospitality projects they sit against engineered wood flooring, under a ceiling detail, and next to wardrobes and kitchen joinery in the same veneer. Ordering those together means one factory matches the tones, one drawing set coordinates the junctions, and one shipment arrives with the fixing details already agreed. That is what we mean by a one-stop furniture and building materials supplier arrangement: fewer suppliers reconciling their own drawings on site.
Related pieces in the same collection are worth pricing at the same time — Santerson Decorative Dining Cabinets, Santerson Glass Front Tall Cabinets and Santerson Buffet Cabinets. A run of low sideboard plus one full-height glazed unit is usually cheaper and tidier than buying them separately.
Before you send: a short checklist
- Wall length, height, depth and ceiling level recorded, not estimated.
- Skirting, cornices, sockets and switches marked on the drawing.
- Glass type and door operation chosen, or two options listed for comparison.
- Finish reference given, or a sample photo of the item to match.
- Lighting intention and power feed location stated.
- Quantity confirmed — one unit, several units, or repeat units per dwelling.
- Delivery address and preferred Incoterms stated, so freight can be quoted with the cabinet.