Glass-front cabinetry in a hotel kitchen, guest-suite pantry or service bar has to survive daily use by people who are not the owner. It is opened with wet hands, wiped with cleaning agents, and inspected by operators who care about both appearance and speed of replacement. A Santerson Glass Front Pvc Cabinet is a made-to-measure PVC kitchen cabinet design in the PVC Kitchen Cabinet collection, with project-specific dimensions and finish options. That single line on the product page carries most of the procurement work, because "project-specific" means every number has to be fixed by you before production starts. The steps below show how a buyer or contractor takes this item from a drawing to an installed, signed-off package.

Where Glass-Front PVC Cabinetry Belongs in a Hospitality Fit-Out

Hospitality projects rarely order cabinets one room at a time. They order them as part of an interior fixtures package that also covers wardrobes, vanities, tall units, doors and wall finishes. Kitchen and pantry cabinetry sits under the interior fixtures and kitchen range on the site, alongside custom built-in kitchen cabinets supplied for hotel, apartment and residential renovation projects. Specifying the glass-front units in the same package as the rest of the built-in joinery keeps panel colours, edge treatment and hardware consistent across rooms, and it puts one purchase order rather than five under production control.

Typical applications where a glass front earns its place:

  • Serviced apartment kitchenettes and guest-suite pantries, where glass fronts let housekeeping check stock at a glance.
  • Back-of-house service bars, beverage stations and in-room dining prep areas.
  • Show units and display apartments, where the cabinet is part of the sales presentation as much as the storage.
  • Villa kitchens and outdoor-adjacent pantries on resort and residential schemes.

Step 1: Lock the Scope Before You Ask for a Price

A made-to-measure item cannot be quoted from a catalogue code. Send the manufacturer what it needs to price and produce the run:

  • A room-by-room schedule: unit type, width, height, depth, and which elevations are glass-fronted.
  • The door style and finish for each zone, matched to the wider joinery package.
  • Glass type and glazing preference for each location, including any display lighting inside the carcass.
  • Hardware set: hinges, drawer slides, support legs and connecting brackets. These are available as matching components on the project cabinetry range, so state them at enquiry rather than sourcing them locally later.
  • The delivery address, floor level and lift dimensions for every building on the site.

Ask the factory to return a shop drawing per unit type. Approving drawings is the point of no return: after sign-off, dimensions and finishes are in production, and a change becomes a re-made door set rather than an edit.

Step 2: Read the Configuration Options as Decisions, Not Suggestions

The product record for this item lists three configuration points: made-to-measure sizing, material and finish options, and a layout tailored to the project. Each one is a decision with a cost consequence.

Configuration pointWhat to decideWhy it matters on site
Made-to-measure sizingCritical dimensions per unit, including allowance for skirting, tiling, services and out-of-square walls.Site tolerances are the most common cause of a cabinet that will not close against a finished wall. Fix who measures: the factory or your site team.
Material and finish optionsPanel material, door surface, colour, and the glass used in the front.A hospitality fit-out usually repeats one finish across many rooms. Sample the exact finish, not a colour chip, before releasing the full run.
Layout tailored to the projectInternal configuration: shelf heights, drawer banks, tall units, appliance housings.Operators change stock weekly. Internal layout that ignores their actual items becomes open shelving within a season.

Where glass-front units appear elsewhere in the catalogue, keep the collections apart in your schedule. The glass front tall cabinets and glass front bar cabinets are separate ranges, each with its own dimensions, layout and finish options to confirm per project. Combining them with kitchen units in one line item is how a full-height unit ends up specified like a wall hung one.

Step 3: Verify What the Product Page Does Not State

Product pages in this range describe configurable options and close with an instruction to confirm dimensions and selected specifications for each project. Treat that as a checklist for your own file, not a gap to fill in with assumptions. Before awarding the order, get written confirmation of:

  • The panel material and door surface actually being supplied for your finish code.
  • Glass thickness, edge treatment and fixing method for the glazed fronts.
  • Hardware brand or grade, and what is covered by the supply versus what is fitted locally.
  • Which test reports or certificates the manufacturer can provide for the specified panel material and glass, and which requirements have to be checked against local regulations by your own consultant.

For outdoor-adjacent locations, do not assume a kitchen cabinet suits a terrace or poolside position. The catalogue lists a separate Santerson Outdoor Ready PVC Cabinets design in the same PVC Kitchen Cabinet collection for those situations, and it still carries the same confirmation requirement. Ask which specification applies to each elevation on your drawings.

Step 4: Sequence Production, Freight and Installation as One Programme

Cabinetry is a long-lead item that blocks other trades. The services section of the site lays out a six-stage project workflow: consultation, design and planning, production, logistics, installation and after-sales. Read that against your own programme rather than as a promise of dates:

  • Design and planning. Your drawings in, shop drawings out, comments closed, sign-off issued.
  • Production. Confirm the production window for the signed run and what happens to units you release in phases.
  • Logistics. The logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Confirm your Incoterms, import terms and duties with your own broker; do not rely on marketing copy for landed cost.
  • Installation. On-site installation, inspection and snagging are listed as services. Agree in writing which scope is done by the manufacturer's team and which by your local contractor, and who signs off the snags list.
  • After-sales. Warranty terms, spare parts and replacement arrangements should be recorded per project, since glass-front doors and hardware are the parts most likely to need a later replacement order.

Step 5: Split the Delivery Into Batches That Match Site Reality

A hotel or apartment tower rarely has storage for a whole joinery package at once, and glazing is the part of the order that suffers most in transit. Two batching rules keep the delivery from becoming a site problem:

  • Release the first batch as one complete floor or one room type, so your installation team can prove the detail and fix defects before the remaining units are made.
  • Ask for glass-front doors to be packed separately from carcasses where the freight plan allows it. Replacing a glazed door is cheaper than rebuilding a damaged carcass.

Buyer's Checklist Before the Purchase Order Goes Out

Run through this list once, in writing, and attach it to the enquiry:

  • Shop drawings signed for every unit type, with dimensions taken from finished floor and wall lines.
  • One finish schedule covering cabinets, doors and wall panelling, so the same colour code is not described three different ways.
  • Glass specification per location, written into the order rather than left to the factory default.
  • Hardware list confirmed, including hinges, slides, legs and brackets.
  • Batching plan tied to your site programme, with a named receiving contact per building.
  • Snagging and handover form agreed before installation starts, not after.

Frequently Asked Questions

Is this cabinet sold to a fixed size?

No. It is made to measure, with dimensions and finishes set for the project. Sizes come from your drawings and site measurements, and the manufacturer asks you to confirm dimensions and selected specifications for each project.

Can one order cover several building types on a mixed development?

Yes, provided each unit type has its own signed drawing. Mixed layouts in one line item cause most dimension disputes at handover.

Does the supplier handle delivery to site?

The company describes door-to-door logistics including freight forwarding, customs paperwork, packaging and container loading, tracking and delivery. Freight mode, Incoterms, duties and transit arrangements should be confirmed for your specific project with your own broker.

What should I hold back from the first production release?

Hold back enough of the run to install and inspect a complete sample room or floor first. A glass-front detail that looks right on a drawing can fail on site because of door reveal, handle clearance or internal layout, and it is far cheaper to correct before the balance is made.

To specify this item for an active project, send the room schedule and drawings through the contact page, and keep the confirmed specification sheet with your handover documentation.